Back to bathroom remodel contractors
Fahey Building/Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Mar 2014
- Last 24 months
- 0 permits filed
50 permits since 2000: 33 completed, 5 never finaled, 12 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 2 never finaled, 2 expired or cancelled. Typically 6 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2014 | Completed final sign-off May 2014 | 61 Westwood Dr | remodel bathroom, 1 new gfi, new shower valve, insulate exterior wall, new bathtub, shower, new tile - no walls moved/removed/added. all layouts to remain the same.Details
remodel bathroom, 1 new gfi, new shower valve, insulate exterior wall, new bathtub, shower, new tile - no walls moved/removed/added. all layouts to remain the same. | $22,000 |
| Sep 20, 2013 | Completed final sign-off Mar 2014 | 8245 Geary Bl | add a new bathroom on the gr floor. relocate e water heater and change to tankless water heaterDetails
add a new bathroom on the gr floor. relocate e water heater and change to tankless water heater | $10,000 |
| Feb 8, 2013 | Completed final sign-off Feb 2014 | 2417 Cabrillo St | remodel kitchen, remove wall and door. infill door openings. proivde new opening from kitchen into hallway, install new electrical, install new sink. install new cabinets and counter tops. remodel bathroom: remove stall shower, provide new toilet, provide new shower head and valve over (e) bathDetails
remodel kitchen, remove wall and door. infill door openings. proivde new opening from kitchen into hallway, install new electrical, install new sink. install new cabinets and counter tops. remodel bathroom: remove stall shower, provide new toilet, provide new shower head and valve over (e) bath | $17,000 |
| Jul 30, 2012 | Completed final sign-off Aug 2013 | 37 Elk St | new bedroom, bathroom, and closets in extg storage space. new cabinets, enlarge extg window. new electrical outlets and lighting. new heating duct and register. new electric radiant floor heating in bathroom.Details
new bedroom, bathroom, and closets in extg storage space. new cabinets, enlarge extg window. new electrical outlets and lighting. new heating duct and register. new electric radiant floor heating in bathroom. | $14,000 |
| May 27, 2010 | Never finaled issued Nov 2010, no final | 222 10th Av | includes the interior remodel of the kitchen on the second floor. also, remodel of (e) third floor bathroom including a new roof over this bathroom.Details
includes the interior remodel of the kitchen on the second floor. also, remodel of (e) third floor bathroom including a new roof over this bathroom. | $200,000 |
| Apr 22, 2010 | Expired or cancelled expired Oct 2013 | 3702 Folsom St | legalize/remodel master bath on 2nd floor. enlarge window at bedroom, roof deck above sundroom, property line window per ab009, skylightDetails
legalize/remodel master bath on 2nd floor. enlarge window at bedroom, roof deck above sundroom, property line window per ab009, skylight | $25,000 |
| Mar 2, 2007 | Never finaled issued Mar 2007, no final | 1150 Lombard St | fear off wall floor finishes, remodel two bathrooms changes fixtures install hew tile ne drywall new carpet and hardwood floors install lnew can lights throughout plumber elecrian will pull permits for their tradesDetails
fear off wall floor finishes, remodel two bathrooms changes fixtures install hew tile ne drywall new carpet and hardwood floors install lnew can lights throughout plumber elecrian will pull permits for their trades | $27,000 |
| Sep 22, 2006 | Completed final sign-off Jan 2007 | 2917 Jackson St | remove wall and floor finishes and plmg fixture and elec in bathroom remodel. run dedicated circuit for gfi plug insulate and install new drywall, tile, reuse tub, install new shower valve, reinstall med cbnts. flourescent lighting. no wndw or door installDetails
remove wall and floor finishes and plmg fixture and elec in bathroom remodel. run dedicated circuit for gfi plug insulate and install new drywall, tile, reuse tub, install new shower valve, reinstall med cbnts. flourescent lighting. no wndw or door install | $12,000 |
| Nov 6, 2003 | Expired or cancelled expired Mar 2010 | 1255 34th Av | remodel kitchen,bath-toilet,tubdrywall,door to patio.tile.update wiring.Details
remodel kitchen,bath-toilet,tubdrywall,door to patio.tile.update wiring. | $19,000 |