F D C Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Mar 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 51 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 15 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2025 | Completed final sign-off Dec 2025 | 2425 Post St | revision to 202409060293. retaining wall revision to pre-approval drawings. orginal foundation & rear exist stairs reinforcing upgradesDetails
revision to 202409060293. retaining wall revision to pre-approval drawings. orginal foundation & rear exist stairs reinforcing upgrades | $60,000 |
| Sep 6, 2024 | Completed final sign-off Dec 2025 | 2425 Post St | upgrade to (e) basement including foundation work upgrade and repair of (e) structural support members and repaiors to the (e) rear exterior stairs less than 50%Details
upgrade to (e) basement including foundation work upgrade and repair of (e) structural support members and repaiors to the (e) rear exterior stairs less than 50% | $150,000 |
| Jun 12, 2024 | Completed final sign-off Aug 2024 | 1140 Florida St | rear stair repair (less than 50%) repaint on rear stair.Details
rear stair repair (less than 50%) repaint on rear stair. | $6,000 |
| Mar 28, 2022 | Completed final sign-off Apr 2022 | 156 Duboce Av | repair back stair obtain permit to complete to comply (work w/o permit violation 202180339). repair owrk only - do not exceed 50% alteration of existing stair structure.Details
repair back stair obtain permit to complete to comply (work w/o permit violation 202180339). repair owrk only - do not exceed 50% alteration of existing stair structure. | $1,500 |
| Feb 12, 2021 | Completed final sign-off Sep 2022 | 2157 Grove St | priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade.Details
priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade. | $600,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 462 Green St | structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit)Details
structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit) | $15,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2019 | 462 Green St | repair < 50% landings of egress stairs at side. no other work.Details
repair < 50% landings of egress stairs at side. no other work. | $19,500 |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 462 Green St | minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement.Details
minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Feb 2020 | 462 Green St | mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flrDetails
mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flr | $80,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2121 Geary Bl | replacement in kind of stairs #9 & #12.Details
replacement in kind of stairs #9 & #12. | $150,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1415 Scott St | replacement in kind of stairs #1 & #2Details
replacement in kind of stairs #1 & #2 | $150,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2040 O'farrell St | replacement in kind of stairs #3Details
replacement in kind of stairs #3 | $75,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1450 Divisadero St | replacement in kind of stairs #8Details
replacement in kind of stairs #8 | $75,000 |
| Oct 19, 2010 | Expired or cancelled expired Jun 2013 | 2040 O'farrell St | replacement in kind of exterior exit stairs # 6 ( on 2060 o'farrell ). one set of stairs only. other exit stairs will remain in service.Details
replacement in kind of exterior exit stairs # 6 ( on 2060 o'farrell ). one set of stairs only. other exit stairs will remain in service. | $75,000 |
| Oct 19, 2010 | Completed final sign-off Dec 2011 | 1450 Divisadero St | replacement in-kind stairs # 7 on 1450 divisadero bldg. one set of stairs only. other exit stairs will remain in serviceDetails
replacement in-kind stairs # 7 on 1450 divisadero bldg. one set of stairs only. other exit stairs will remain in service | $75,000 |
| Apr 25, 2008 | Completed final sign-off Jul 2008 | 130 Clearfield Dr | to comply w/n.o.v. #200837270 - remove kitchen in ground floor, open pathway to ground floor from internal stair; legalize study from built converted from partial bedroom, reference pa #9620442.Details
to comply w/n.o.v. #200837270 - remove kitchen in ground floor, open pathway to ground floor from internal stair; legalize study from built converted from partial bedroom, reference pa #9620442. | $3,000 |