Back to kitchen remodel contractors
F D C Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Mar 2025
- Last 24 months
- 1 permit filed
56 permits since 2000: 51 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 13 completed. Typically 86 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2021 | Completed final sign-off Sep 2022 | 2157 Grove St | priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade.Details
priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade. | $600,000 |
| Dec 4, 2020 | Completed final sign-off Dec 2020 | 3158 Mission St | unit 3: replace window in kitchen, to comply w/his nov#200917441, items 2 & 4. remove freestanding wood stove.Details
unit 3: replace window in kitchen, to comply w/his nov#200917441, items 2 & 4. remove freestanding wood stove. | $1,000 |
| Dec 2, 2020 | Completed final sign-off Jul 2023 | 189 Tioga Av | adding accessory dwelling unit (946 sq.ft.) on basement level of existing single family dwelling, including living/dining, two bedrooms, two bathrooms and new kitchenDetails
adding accessory dwelling unit (946 sq.ft.) on basement level of existing single family dwelling, including living/dining, two bedrooms, two bathrooms and new kitchen | $18,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2025 | 187 Tioga Av | adding accessory dwelling unit (910 sq.ft.) on basement level of existing single family dwelling, including living/dining, two bedrooms, two bathrooms and new kitchenDetails
adding accessory dwelling unit (910 sq.ft.) on basement level of existing single family dwelling, including living/dining, two bedrooms, two bathrooms and new kitchen | $7,000 |
| Jun 12, 2020 | Completed final sign-off Mar 2021 | 3158 Mission St | replace kitchen cabinet and plumbing fixtures in-kind, replace plumbing fixtures in bath in-kind, rewire electrical wiring to new subpanels for unit #3 and #4. the size of bathrooms are 6'-9"x5'-0" typical. this application is similar with building 3154-3156 mission - pa#202006118443Details
replace kitchen cabinet and plumbing fixtures in-kind, replace plumbing fixtures in bath in-kind, rewire electrical wiring to new subpanels for unit #3 and #4. the size of bathrooms are 6'-9"x5'-0" typical. this application is similar with building 3154-3156 mission - pa#202006118443 | $50,000 |
| Jun 11, 2020 | Completed final sign-off Sep 2020 | 3154 Mission St | unit #1,2,3: replace kitchen cabinet and plumbing fixtures in-kind. replace plumbing fixtures in bath in-kind. rewire electrical to new subpanels.Details
unit #1,2,3: replace kitchen cabinet and plumbing fixtures in-kind. replace plumbing fixtures in bath in-kind. rewire electrical to new subpanels. | $750 |
| Jan 30, 2020 | Completed final sign-off Jun 2020 | 346 Precita Av | replace kitchen cabinets, plumbing fixtures in kind in units (346-346a). replace plumbing fixture in bathroom for unit (346a)Details
replace kitchen cabinets, plumbing fixtures in kind in units (346-346a). replace plumbing fixture in bathroom for unit (346a) | $15,000 |
| Oct 29, 2019 | Completed final sign-off Feb 2020 | 462 Green St | revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e)Details
revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e) | $1,000 |
| Apr 19, 2018 | Completed final sign-off Aug 2019 | 462 Green St | units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a.Details
units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a. | $200,000 |
| Aug 19, 2013 | Completed final sign-off Feb 2015 | 2985 Sacramento St | remodel (e) bathroom in kind, remodel kitchen, replace cabinets, counters & flooring & re-wire electrical/lightings, replace sheetrock w/new & repair (e) deck in kind. all work at 2nd floor (2985 sacramento st).Details
remodel (e) bathroom in kind, remodel kitchen, replace cabinets, counters & flooring & re-wire electrical/lightings, replace sheetrock w/new & repair (e) deck in kind. all work at 2nd floor (2985 sacramento st). | $20,000 |
| Nov 22, 2010 | Completed final sign-off Jan 2011 | 1050 North Point St | replace kitchen counter top with granite in kind, repl kitchen flooring with linoleum, repl bath flooring with ceramic tile, replace toiletDetails
replace kitchen counter top with granite in kind, repl kitchen flooring with linoleum, repl bath flooring with ceramic tile, replace toilet | $4,000 |
| Apr 25, 2008 | Completed final sign-off Jul 2008 | 130 Clearfield Dr | to comply w/n.o.v. #200837270 - remove kitchen in ground floor, open pathway to ground floor from internal stair; legalize study from built converted from partial bedroom, reference pa #9620442.Details
to comply w/n.o.v. #200837270 - remove kitchen in ground floor, open pathway to ground floor from internal stair; legalize study from built converted from partial bedroom, reference pa #9620442. | $3,000 |
| May 6, 2005 | Completed final sign-off May 2006 | 290 Turk St | new flooring,kitchen rehabilitation, bathrooms upgradeDetails
new flooring,kitchen rehabilitation, bathrooms upgrade | $72,000 |