Everhome Builder Inc.
- Based in
- Millbrae
- On San Francisco permits
- Mar 2000 to Sep 2022
- Last 24 months
- 0 permits filed
59 permits since 2000: 43 completed, 4 never finaled, 12 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 11 completed. Typically 17 days from filing to permit and 299 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2020 | Completed final sign-off Jan 2022 | 1364 Page St | remodel unit #1: relocating kitchen and bathroom. install laundry room at common hallway. no exterior change nor structural alteration proposed.//vif rated walls/ceilings/doors between rated hallway(exit) and stairsDetails
remodel unit #1: relocating kitchen and bathroom. install laundry room at common hallway. no exterior change nor structural alteration proposed.//vif rated walls/ceilings/doors between rated hallway(exit) and stairs | $50,000 |
| Feb 8, 2019 | Completed final sign-off May 2019 | 322 Chattanooga St | abatement to complaint #2018-015049enf: close opening at stairs to maintain two separate units. enlarge roof railing area to meet required open space for upper unitDetails
abatement to complaint #2018-015049enf: close opening at stairs to maintain two separate units. enlarge roof railing area to meet required open space for upper unit | $6,500 |
| Jan 17, 2018 | Completed final sign-off Aug 2022 | 3132 Ulloa St | rear additon on both ground & second fl. interior remodel of g/f to add (2)new bedrooms, (2)new baths w/ (n) interior stairs connecting to 2nd fl.Details
rear additon on both ground & second fl. interior remodel of g/f to add (2)new bedrooms, (2)new baths w/ (n) interior stairs connecting to 2nd fl. | $150,000 |
| Sep 22, 2017 | Completed final sign-off Jun 2019 | 456 Kansas St | remodel units on 2/f & 3/f:open up 2 walls, add plywd to (e) walls. no work on g/f except voluntary bolting & foundations.add 2 new baths in master bedrooms in each unit.change ~13 windows not visible to street.extend (e) main interior stairs to roof. add roof hatch.Details
remodel units on 2/f & 3/f:open up 2 walls, add plywd to (e) walls. no work on g/f except voluntary bolting & foundations.add 2 new baths in master bedrooms in each unit.change ~13 windows not visible to street.extend (e) main interior stairs to roof. add roof hatch. | $90,418 |
| Nov 15, 2016 | Completed final sign-off Jun 2018 | 1314 16th Av | ground floor - add 2 full bath & 2 bedrm, relocate (e) interior staircase between ground floor & 1st; remodel kitchen & powder room on 1st floor; 2nd floor - turn (e) bedrm into master bath & wic; relocate (e) bathroom. add interior stair between 2nd & attic floor;Details
ground floor - add 2 full bath & 2 bedrm, relocate (e) interior staircase between ground floor & 1st; remodel kitchen & powder room on 1st floor; 2nd floor - turn (e) bedrm into master bath & wic; relocate (e) bathroom. add interior stair between 2nd & attic floor; | $183,000 |
| Mar 17, 2016 | Completed final sign-off Jan 2017 | 770 Haight St | add new bathroom to each unit, remodel (e) bathroom in each unit, remodel (e) kitchen in each unit. relocate fau in each unit, repair dry rot to (e) stair. upgrade (e) electrical panel, relocate (e) gas meters.Details
add new bathroom to each unit, remodel (e) bathroom in each unit, remodel (e) kitchen in each unit. relocate fau in each unit, repair dry rot to (e) stair. upgrade (e) electrical panel, relocate (e) gas meters. | $300,000 |
| May 27, 2015 | Completed final sign-off Jul 2017 | 238 Urbano Dr | 1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan.Details
1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan. | $130,000 |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 2200 Santiago St | replace existing front stair in kind, no change of bldg.Details
replace existing front stair in kind, no change of bldg. | $7,000 |
| Jul 3, 2012 | Completed final sign-off Oct 2012 | 1201 Pacific Av | to comply with complaint #201233701 - repair (e) stair at rear of building. no change of building envelope.Details
to comply with complaint #201233701 - repair (e) stair at rear of building. no change of building envelope. | $5,800 |
| Feb 3, 2004 | Completed final sign-off Feb 2004 | 3434 Geary Bl | repair damage stair steps, 4"x4" post,handrails trims & some decking (30sq.)less than 50% of structDetails
repair damage stair steps, 4"x4" post,handrails trims & some decking (30sq.)less than 50% of struct | $2,800 |
| Oct 17, 2000 | Completed final sign-off Feb 2001 | 731 Larkin St | non-bearing walls, plumbing, electrical, new stair to replace existing. heating ductwork suspended cDetails
non-bearing walls, plumbing, electrical, new stair to replace existing. heating ductwork suspended c | $79,000 |