Everhome Builder Inc.
- Based in
- Millbrae
- On San Francisco permits
- Mar 2000 to Sep 2022
- Last 24 months
- 0 permits filed
59 permits since 2000: 43 completed, 4 never finaled, 12 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 completed, 2 expired or cancelled. Typically 5 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2015 | Expired or cancelled cancelled Feb 2023 | 600 Ortega St | horizontal addition and addition of new g/f and 2/f back deck. interior remodel of kitchen, bedrooms, garage, adding 1 new bathroom on 2/fDetails
horizontal addition and addition of new g/f and 2/f back deck. interior remodel of kitchen, bedrooms, garage, adding 1 new bathroom on 2/f | $300,000 |
| Jul 8, 2014 | Completed final sign-off Aug 2015 | 2122 14th Av | replace (2) windows in master bedroom @ back of house, remove (e) fire escape @ back of house, add (n) rear deck from 2/f master bedroom to (e) backyard.Details
replace (2) windows in master bedroom @ back of house, remove (e) fire escape @ back of house, add (n) rear deck from 2/f master bedroom to (e) backyard. | $25,000 |
| Oct 30, 2009 | Expired or cancelled expired Jan 2012 | 300 Santa Ana Av | revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear.Details
revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear. | $20,000 |
| Apr 25, 2006 | Completed final sign-off Feb 2007 | 250 Athens St | project consists of remodeling work to an existing main and lower stories of existing single fam dwelling. new deck and trellis ,legalize exist habitable space and storage space into living areas. no changes to building envelope or occupancy are proposed. . no new cooking facilities are proposed.Details
project consists of remodeling work to an existing main and lower stories of existing single fam dwelling. new deck and trellis ,legalize exist habitable space and storage space into living areas. no changes to building envelope or occupancy are proposed. . no new cooking facilities are proposed. | $40,000 |
| Feb 3, 2004 | Completed final sign-off Feb 2004 | 3434 Geary Bl | repair damage stair steps, 4"x4" post,handrails trims & some decking (30sq.)less than 50% of structDetails
repair damage stair steps, 4"x4" post,handrails trims & some decking (30sq.)less than 50% of struct | $2,800 |