Back to bathroom remodel contractors
Everhome Builder Inc.
- Based in
- Millbrae
- On San Francisco permits
- Mar 2000 to Sep 2022
- Last 24 months
- 0 permits filed
59 permits since 2000: 43 completed, 4 never finaled, 12 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 8 days from filing to permit and 346 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2020 | Completed final sign-off Feb 2022 | 1364 Page St | remodel unit 3, relocate kitchen and bath. unit expands to include corridor. no exteirior change nor structural alteration proposed.Details
remodel unit 3, relocate kitchen and bath. unit expands to include corridor. no exteirior change nor structural alteration proposed. | $49,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2022 | 1364 Page St | remodel interior unit 1, relocate kitchen and bath from approved plan 202001101613. no exterior change , non structural alteration proposedDetails
remodel interior unit 1, relocate kitchen and bath from approved plan 202001101613. no exterior change , non structural alteration proposed | |
| Jan 10, 2020 | Completed final sign-off Jan 2022 | 1364 Page St | remodel unit #1: relocating kitchen and bathroom. install laundry room at common hallway. no exterior change nor structural alteration proposed.//vif rated walls/ceilings/doors between rated hallway(exit) and stairsDetails
remodel unit #1: relocating kitchen and bathroom. install laundry room at common hallway. no exterior change nor structural alteration proposed.//vif rated walls/ceilings/doors between rated hallway(exit) and stairs | $50,000 |
| Jan 17, 2018 | Completed final sign-off Aug 2022 | 3132 Ulloa St | rear additon on both ground & second fl. interior remodel of g/f to add (2)new bedrooms, (2)new baths w/ (n) interior stairs connecting to 2nd fl.Details
rear additon on both ground & second fl. interior remodel of g/f to add (2)new bedrooms, (2)new baths w/ (n) interior stairs connecting to 2nd fl. | $150,000 |
| Sep 22, 2017 | Completed final sign-off Jun 2019 | 456 Kansas St | remodel units on 2/f & 3/f:open up 2 walls, add plywd to (e) walls. no work on g/f except voluntary bolting & foundations.add 2 new baths in master bedrooms in each unit.change ~13 windows not visible to street.extend (e) main interior stairs to roof. add roof hatch.Details
remodel units on 2/f & 3/f:open up 2 walls, add plywd to (e) walls. no work on g/f except voluntary bolting & foundations.add 2 new baths in master bedrooms in each unit.change ~13 windows not visible to street.extend (e) main interior stairs to roof. add roof hatch. | $90,418 |
| Aug 15, 2017 | Completed final sign-off Apr 2018 | 1030 Russia Av | 1. retile the existing bath, replace the vanity, cabinet and toilet. 2. paint the entire bathroom.Details
1. retile the existing bath, replace the vanity, cabinet and toilet. 2. paint the entire bathroom. | $10,000 |
| Jan 9, 2017 | Completed final sign-off May 2017 | 1364 Page St | unit #2 - remodel kitchen & remove kitchen cabinets, countertop, sink & faucet at the unit. new plumbing for the bathroom vanity, sink & kitchen sink. new electrical wiring for lights & outlets, exhaust fans. install new lighting fixture. install new cabinets, & sheetrock.Details
unit #2 - remodel kitchen & remove kitchen cabinets, countertop, sink & faucet at the unit. new plumbing for the bathroom vanity, sink & kitchen sink. new electrical wiring for lights & outlets, exhaust fans. install new lighting fixture. install new cabinets, & sheetrock. | $30,000 |
| Nov 15, 2016 | Completed final sign-off Jun 2018 | 1314 16th Av | ground floor - add 2 full bath & 2 bedrm, relocate (e) interior staircase between ground floor & 1st; remodel kitchen & powder room on 1st floor; 2nd floor - turn (e) bedrm into master bath & wic; relocate (e) bathroom. add interior stair between 2nd & attic floor;Details
ground floor - add 2 full bath & 2 bedrm, relocate (e) interior staircase between ground floor & 1st; remodel kitchen & powder room on 1st floor; 2nd floor - turn (e) bedrm into master bath & wic; relocate (e) bathroom. add interior stair between 2nd & attic floor; | $183,000 |
| Mar 17, 2016 | Completed final sign-off Jan 2017 | 770 Haight St | add new bathroom to each unit, remodel (e) bathroom in each unit, remodel (e) kitchen in each unit. relocate fau in each unit, repair dry rot to (e) stair. upgrade (e) electrical panel, relocate (e) gas meters.Details
add new bathroom to each unit, remodel (e) bathroom in each unit, remodel (e) kitchen in each unit. relocate fau in each unit, repair dry rot to (e) stair. upgrade (e) electrical panel, relocate (e) gas meters. | $300,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 1364 Page St | unit #6: kitchen & bathroom remodel. a) ktchn:replace extg cabinet, counter top, sink & faucet. replace nw stove, refrigerator & range hood. b) bathroom remodeling. c)install nw central furnace. d) replace same size extg wndws. no walls moved, removed, added or installed. all to remain unchangedDetails
unit #6: kitchen & bathroom remodel. a) ktchn:replace extg cabinet, counter top, sink & faucet. replace nw stove, refrigerator & range hood. b) bathroom remodeling. c)install nw central furnace. d) replace same size extg wndws. no walls moved, removed, added or installed. all to remain unchanged | $46,500 |
| Jul 22, 2015 | Expired or cancelled cancelled Feb 2023 | 600 Ortega St | horizontal addition and addition of new g/f and 2/f back deck. interior remodel of kitchen, bedrooms, garage, adding 1 new bathroom on 2/fDetails
horizontal addition and addition of new g/f and 2/f back deck. interior remodel of kitchen, bedrooms, garage, adding 1 new bathroom on 2/f | $300,000 |
| May 27, 2015 | Completed final sign-off Jul 2017 | 238 Urbano Dr | 1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan.Details
1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan. | $130,000 |
| May 11, 2015 | Expired or cancelled expired Jan 2017 | 322 Chattanooga St | remove interior ceiling & wall covering finishes in kitchen & bathroom area only - non structural interior demolition per plan.Details
remove interior ceiling & wall covering finishes in kitchen & bathroom area only - non structural interior demolition per plan. | $7,000 |
| Jul 17, 2013 | Never finaled issued Jul 2013, no final | 1050 Montgomery St | #b- kitchen remodeling: remove & replace wall & ceiling sheetrock, new plumbing, new electrical wiring, new cabinets, counter top, sink & faucet. new lighting at kicthen & bath shall be led & flourescent. bathroom remodeling: remove & replace wall & ceiling sheetrock, new plumbing,Details
#b- kitchen remodeling: remove & replace wall & ceiling sheetrock, new plumbing, new electrical wiring, new cabinets, counter top, sink & faucet. new lighting at kicthen & bath shall be led & flourescent. bathroom remodeling: remove & replace wall & ceiling sheetrock, new plumbing, | $22,000 |
| Oct 13, 2010 | Completed final sign-off Jul 2011 | 1917 Clement St | permit for interior remodel at 2nd floor only. as per change kitchen cabinet and countertop. new bathrooms layout. repaint whole interior house and upgrade extg furnace and water heater.Details
permit for interior remodel at 2nd floor only. as per change kitchen cabinet and countertop. new bathrooms layout. repaint whole interior house and upgrade extg furnace and water heater. | $32,000 |
| Oct 30, 2009 | Expired or cancelled expired Jan 2012 | 300 Santa Ana Av | revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear.Details
revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear. | $20,000 |
| Mar 15, 2000 | Completed final sign-off Jul 2000 | 36 Clement St | replace kitchen cabients,remodel bath,water heater,relocateDetails
replace kitchen cabients,remodel bath,water heater,relocate |