Estrada Design Build
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 19 permits filed
45 permits since 2000: 38 completed, 3 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 99 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2023 | Completed final sign-off Sep 2023 | 345 27th St | revision to 202307242788 approved no plans permit. 100% front stairs replacement.Details
revision to 202307242788 approved no plans permit. 100% front stairs replacement. | $2,500 |
| Jul 24, 2023 | Never finaled issued Jul 2023, no final | 345 27th St | re-frame existing front staircase due to water damage and dry rot. repace in kind. less than 50% replacement.Details
re-frame existing front staircase due to water damage and dry rot. repace in kind. less than 50% replacement. | $1,000 |
| May 15, 2023 | Completed final sign-off Sep 2024 | 241 19th Av | gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath.Details
gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath. | $200,000 |
| Mar 29, 2022 | Completed final sign-off Feb 2024 | 427 Bryant St | base building improcement of interior renovation at (e) interior ground & 2nd fl. demo of (e) non-bearing interior partitions, restrooms & (e) stairs, & construction of (n) interior ptns, finishes, 1 ada restroom, ada lift & exit. door on taber place street. new construction of (4) offices on 2nd flDetails
base building improcement of interior renovation at (e) interior ground & 2nd fl. demo of (e) non-bearing interior partitions, restrooms & (e) stairs, & construction of (n) interior ptns, finishes, 1 ada restroom, ada lift & exit. door on taber place street. new construction of (4) offices on 2nd fl | $450,000 |