Back to kitchen remodel contractors
Estrada Design Build
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 19 permits filed
45 permits since 2000: 38 completed, 3 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 10 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jun 2026 | 335 04th Av | both units: in-kind kitchen (160sf) and bathroom(60sf) remodel. lath & plaster replacement with new 5/8" type xgypsum board (1180sf), secure with 5d cooler nails @4"o.c. min. wor equivalent.. work to be done in both units. all work in kind.Details
both units: in-kind kitchen (160sf) and bathroom(60sf) remodel. lath & plaster replacement with new 5/8" type xgypsum board (1180sf), secure with 5d cooler nails @4"o.c. min. wor equivalent.. work to be done in both units. all work in kind. | $70,000 |
| Nov 19, 2025 | Completed final sign-off Jun 2026 | 1526 Kirkham St | convert (e) recreation space into adu via state adu per planning code 207.2. add (n) bedroom and kitchen, existing 1-bedroom, 1-bathroom, 1-home office.Details
convert (e) recreation space into adu via state adu per planning code 207.2. add (n) bedroom and kitchen, existing 1-bedroom, 1-bathroom, 1-home office. | $20,000 |
| Aug 5, 2025 | Completed final sign-off Jan 2026 | 877 26th Av | remodel existing kitchen in kind with new appliances. remodel laundry room new appliances.Details
remodel existing kitchen in kind with new appliances. remodel laundry room new appliances. | $25,000 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 200 Duboce Av | interior soft demolition at single story, vacant, commercial space. removal of (e) ceiling gypsum boards & wall/floor finishes, (e) kitchen cabinets, and plumbing fixtures only. space to remain vacant. ab-017Details
interior soft demolition at single story, vacant, commercial space. removal of (e) ceiling gypsum boards & wall/floor finishes, (e) kitchen cabinets, and plumbing fixtures only. space to remain vacant. ab-017 | $2,500 |
| Jan 7, 2025 | Completed final sign-off Apr 2025 | 506 Fell St | remodel existing kitchen in-kindDetails
remodel existing kitchen in-kind | $20,000 |
| Jul 22, 2024 | Completed final sign-off Oct 2024 | 1443 22nd Av | ref *revision* 202406184787- in kind replacement of vinyl (1) kitchen window within the same opening not facing street .Details
ref *revision* 202406184787- in kind replacement of vinyl (1) kitchen window within the same opening not facing street . | $750 |
| Jun 18, 2024 | Completed final sign-off Oct 2024 | 1443 22nd Av | (1) kitchen remodel (in kind). replace drywall and tile in-kind in kitchen only. (n) countertops, cabinets, sink, and appliances.Details
(1) kitchen remodel (in kind). replace drywall and tile in-kind in kitchen only. (n) countertops, cabinets, sink, and appliances. | $26,000 |
| Apr 18, 2024 | Completed final sign-off Nov 2025 | 388 Park St | unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroomDetails
unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroom | $25,000 |
| May 15, 2023 | Completed final sign-off Sep 2024 | 241 19th Av | gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath.Details
gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath. | $200,000 |
| Dec 19, 2022 | Never finaled issued Dec 2022, no final | 1400 Yosemite Av | install (n) freezer-walk in (e) commissary kitchen on the ground floor and relocate (e) electrical panel. mep deferred.Details
install (n) freezer-walk in (e) commissary kitchen on the ground floor and relocate (e) electrical panel. mep deferred. | $70,500 |
| Jun 22, 2022 | Completed final sign-off Aug 2023 | 1700 Post St | unit a: interior t.i. of (e) ground floor with mezzanine restaurant space for a (n) restaurant tenant. scope to include (n) partitions, (n) accessible restrooms, (n) kitchen equipment, (n) lighting, and (n) finishes.Details
unit a: interior t.i. of (e) ground floor with mezzanine restaurant space for a (n) restaurant tenant. scope to include (n) partitions, (n) accessible restrooms, (n) kitchen equipment, (n) lighting, and (n) finishes. | $170,500 |
| Jun 4, 2021 | Completed final sign-off Oct 2024 | 104 Lunado Wy | interior renovation & vertical addition into (e) 1 story residential building with lower garage level. bedrooms, kitchen & dining @ ground floor. vertical addition to new 2nd floor.Details
interior renovation & vertical addition into (e) 1 story residential building with lower garage level. bedrooms, kitchen & dining @ ground floor. vertical addition to new 2nd floor. | $550,000 |
| Feb 18, 2014 | Expired or cancelled expired Dec 2024 | 2211 14th Av | 1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel.Details
1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel. | $45,000 |