Back to bathroom remodel contractors
Estrada Design Build
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 19 permits filed
45 permits since 2000: 38 completed, 3 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | Completed final sign-off Sep 2026 | 573 Scott St | unit a: remodel bathroom in kind. replace (n) tub, toilet, & vanity.Details
unit a: remodel bathroom in kind. replace (n) tub, toilet, & vanity. | $20,000 |
| Aug 5, 2026 | Completed final sign-off Sep 2026 | 573 Scott St | unit e: remodel bathroom in kind, replace n) tub in kind, faucet, toilet & vanity. unit a: in kind tile replacement in bathroomDetails
unit e: remodel bathroom in kind, replace n) tub in kind, faucet, toilet & vanity. unit a: in kind tile replacement in bathroom | $25,000 |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 250 Hartford St | unit #5: remodel bathroom in kind. replace tub, faucet, toilet, and vanity.Details
unit #5: remodel bathroom in kind. replace tub, faucet, toilet, and vanity. | $20,000 |
| Jun 25, 2026 | In progress issued Jun 2026 | 335 04th Av | both units: in-kind kitchen (160sf) and bathroom(60sf) remodel. lath & plaster replacement with new 5/8" type xgypsum board (1180sf), secure with 5d cooler nails @4"o.c. min. wor equivalent.. work to be done in both units. all work in kind.Details
both units: in-kind kitchen (160sf) and bathroom(60sf) remodel. lath & plaster replacement with new 5/8" type xgypsum board (1180sf), secure with 5d cooler nails @4"o.c. min. wor equivalent.. work to be done in both units. all work in kind. | $70,000 |
| Nov 19, 2025 | Completed final sign-off Jun 2026 | 1526 Kirkham St | convert (e) recreation space into adu via state adu per planning code 207.2. add (n) bedroom and kitchen, existing 1-bedroom, 1-bathroom, 1-home office.Details
convert (e) recreation space into adu via state adu per planning code 207.2. add (n) bedroom and kitchen, existing 1-bedroom, 1-bathroom, 1-home office. | $20,000 |
| Nov 18, 2024 | Completed final sign-off Jan 2025 | 766 Chestnut St | non-structural interior remodel to convert portion of (e) den to new bathroom. remove 11' non bearing wall. add new corner sink to the existing toilet. add new floating toilet in existing bathroom.Details
non-structural interior remodel to convert portion of (e) den to new bathroom. remove 11' non bearing wall. add new corner sink to the existing toilet. add new floating toilet in existing bathroom. | $9,000 |
| Sep 3, 2024 | Completed final sign-off Oct 2024 | 1443 22nd Av | remodel of existing bathroom in kind, including new tile. ~90ft^2Details
remodel of existing bathroom in kind, including new tile. ~90ft^2 | $12,500 |
| Jun 18, 2024 | Completed final sign-off Nov 2024 | 1614 26th Av | (1) bathroom renovation (in kind). replace drywall and tile in-kind. (n) vanity, toilet, and tub.Details
(1) bathroom renovation (in kind). replace drywall and tile in-kind. (n) vanity, toilet, and tub. | $18,000 |
| Apr 18, 2024 | Completed final sign-off Nov 2025 | 388 Park St | unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroomDetails
unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroom | $25,000 |
| Apr 9, 2024 | Completed final sign-off May 2024 | 3789 Fillmore St | unit #8: bathroom remodel and laundry room remodel. retile shower - new vanity sink, toilet. light - vent and fan. (no moving walls)Details
unit #8: bathroom remodel and laundry room remodel. retile shower - new vanity sink, toilet. light - vent and fan. (no moving walls) | $12,500 |
| Sep 11, 2023 | Completed final sign-off Oct 2023 | 1470 22nd Av | new shower & tub faucet, new vanity sink & new tile. bath 80sf.Details
new shower & tub faucet, new vanity sink & new tile. bath 80sf. | $7,500 |
| May 15, 2023 | Completed final sign-off Sep 2024 | 241 19th Av | gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath.Details
gr/flr n family room, n office and n bathrm, n interior stairs to connect to 1st flr, n utility closet & n work bench area; 1st flr- relocated n kitchen w/access door to n deck, n powder rm, relocate dining area , n laundry closet; 2nd flr-remodel e hall bathrm, n master suite w/new master bath. | $200,000 |
| Feb 18, 2014 | Expired or cancelled expired Dec 2024 | 2211 14th Av | 1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel.Details
1)add bedroom, bathroom and a family room on 1st floor. 2)interior renovation on 2nd and 3rd floor. 3)kitchen and bathroom remodel. | $45,000 |