Back to kitchen remodel contractors
Essa's Remodeling
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Jun 2026
- Last 24 months
- 7 permits filed
88 permits since 2000: 67 completed, 5 in progress, 13 never finaled, 3 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 18 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | In progress issued Sep 2025 | 669 Geary St | abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupantDetails
abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupant | $20,000 |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 1047 Fell St | to demolish all kitchen cabinets and coutner top, install electrical gfci and recessed lights, install new cabinets and counter in same layout before, reiwre electrical in the whole apartment. kitchen is (6x10)Details
to demolish all kitchen cabinets and coutner top, install electrical gfci and recessed lights, install new cabinets and counter in same layout before, reiwre electrical in the whole apartment. kitchen is (6x10) | $20,000 |
| Jun 9, 2020 | Completed final sign-off Aug 2020 | 1053 Fell St | in-kind kitchen remodel: remove old kitchen cabinets and counter top, redo electrical, install new light fixtures, install new cabinets in same location, install new counter top and tiles, re wire electrical in whole apartment and install outlets.Details
in-kind kitchen remodel: remove old kitchen cabinets and counter top, redo electrical, install new light fixtures, install new cabinets in same location, install new counter top and tiles, re wire electrical in whole apartment and install outlets. | $20,000 |
| Jun 3, 2020 | Completed final sign-off Aug 2020 | 1049 Fell St | kitchen remodeling: remove and replace all cabinets, countertop and sink in kind, same location, install new electrical gfi, install recset lights, replace sheetrock, replace tiles on kitchen floor. replace appliances. all work in kind.Details
kitchen remodeling: remove and replace all cabinets, countertop and sink in kind, same location, install new electrical gfi, install recset lights, replace sheetrock, replace tiles on kitchen floor. replace appliances. all work in kind. | $20,000 |
| Dec 6, 2019 | Completed final sign-off Jun 2021 | 464 11th Av | construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headersDetails
construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headers | $105,000 |
| Nov 15, 2017 | Completed final sign-off Jan 2018 | 757 Sutter St | #200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13Details
#200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13 | $5,000 |
| Feb 10, 2017 | Never finaled issued Feb 2017, no final | 863 Fillmore St | unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout.Details
unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout. | $15,000 |
| Jun 3, 2016 | Completed final sign-off Apr 2018 | 627 Lyon St | kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires.Details
kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires. | $7,300 |
| Oct 9, 2015 | Expired or cancelled withdrawn Oct 2018 | 2651 Baker St | revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows.Details
revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows. | $50,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 937 Judah St | kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink.Details
kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink. | $18,000 |
| Jun 26, 2015 | Completed final sign-off Aug 2016 | 1166 Green St | non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryerDetails
non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryer | $15,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side.Details
rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side. | $120,000 |
| Apr 30, 2015 | Never finaled issued Jun 2015, no final | 1830 Fillmore St | reconfigure kitchen floor plan. move non-load partition at kitchen area. ansul fire suppression system and fire alarm system under seperate permit. reconnect to fire alarm system under separate permit. n/a for maher.Details
reconfigure kitchen floor plan. move non-load partition at kitchen area. ansul fire suppression system and fire alarm system under seperate permit. reconnect to fire alarm system under separate permit. n/a for maher. | $5,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel.Details
complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel. | $30,000 |
| Sep 16, 2014 | Completed final sign-off Jun 2015 | 116 Everson St | remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house.Details
remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house. | $38,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spacesDetails
3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spaces | $30,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces.Details
3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces. | $30,000 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 286 Polaris Wy | remodel kitchen, 2 existing bathrms on 2nd flr per plan, add (n) entertainment rm on 1st flr, upgrade new electrical panel, repl windows, & furnace/ductwork, install new recessed light at 1st and 2nd flr per plan, replace front windows glass inkind no change to window frame.Details
remodel kitchen, 2 existing bathrms on 2nd flr per plan, add (n) entertainment rm on 1st flr, upgrade new electrical panel, repl windows, & furnace/ductwork, install new recessed light at 1st and 2nd flr per plan, replace front windows glass inkind no change to window frame. | $21,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2014 | 2442 15th St | remodel kitchen and bath; to comply with cec150(k) 8 & 10Details
remodel kitchen and bath; to comply with cec150(k) 8 & 10 | $18,000 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 2579 35th Av | kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tilesDetails
kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tiles | $18,000 |
| Jan 16, 2014 | Completed final sign-off May 2014 | 1470 20th Av | relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom.Details
relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom. | $38,000 |
| Oct 1, 2013 | Completed final sign-off Oct 2013 | 615 Noe St | to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub.Details
to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub. | $3,500 |