Back to bathroom remodel contractors
Essa's Remodeling
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Jun 2026
- Last 24 months
- 7 permits filed
88 permits since 2000: 67 completed, 5 in progress, 13 never finaled, 3 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 30 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2025 | In progress issued Aug 2025 | 2368 Vallejo St | split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior workDetails
split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior work | $17,000 |
| Dec 6, 2019 | Completed final sign-off Jun 2021 | 464 11th Av | construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headersDetails
construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headers | $105,000 |
| Oct 25, 2018 | Completed final sign-off Mar 2019 | 175 06th St | to replace (3) bathroom windows, waterproof, dispose of old windows to comply with nov # 201876652 item 2.Details
to replace (3) bathroom windows, waterproof, dispose of old windows to comply with nov # 201876652 item 2. | $1,650 |
| Nov 15, 2017 | Completed final sign-off Jan 2018 | 757 Sutter St | #200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13Details
#200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13 | $5,000 |
| Aug 28, 2017 | Completed final sign-off Dec 2017 | 1612 Fulton St | full bathroom remodeling: relocate plumbing fixtures. add new toilet,, no walls added or removed.Details
full bathroom remodeling: relocate plumbing fixtures. add new toilet,, no walls added or removed. | $15,000 |
| Jul 13, 2017 | Completed final sign-off Nov 2018 | 1610 40th Av | convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat)Details
convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat) | $43,000 |
| Feb 10, 2017 | Never finaled issued Feb 2017, no final | 863 Fillmore St | unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout.Details
unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout. | $15,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2017 | 540 29th St | remodel existing bathroom on 3rd level. no change in walls and openings and replace existing bathtub with shower pan. replace lighting fixtures. use high efficacy lighting or controlled by manual on sensor with high efficacy main light.Details
remodel existing bathroom on 3rd level. no change in walls and openings and replace existing bathtub with shower pan. replace lighting fixtures. use high efficacy lighting or controlled by manual on sensor with high efficacy main light. | $12,000 |
| Sep 1, 2016 | Completed final sign-off Dec 2018 | 31 Miramar Av | revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroomDetails
revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroom | $50,000 |
| Jun 3, 2016 | Completed final sign-off Apr 2018 | 627 Lyon St | kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires.Details
kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires. | $7,300 |
| Dec 2, 2015 | Completed final sign-off Apr 2016 | 47 Inverness Dr | bathroom remodel: remove all the sheetrock, new electrical and plumbing fixtures. install a new laundry hook.Details
bathroom remodel: remove all the sheetrock, new electrical and plumbing fixtures. install a new laundry hook. | $7,900 |
| Oct 26, 2015 | Completed final sign-off Apr 2016 | 2208 Mission St | 2 bathrooms remodeling: install electrical and plumbing. no structural work. no wall modification.Details
2 bathrooms remodeling: install electrical and plumbing. no structural work. no wall modification. | $34,800 |
| Oct 9, 2015 | Expired or cancelled withdrawn Oct 2018 | 2651 Baker St | revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows.Details
revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows. | $50,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 937 Judah St | kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink.Details
kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink. | $18,000 |
| Jul 13, 2015 | Completed final sign-off Feb 2016 | 436 Gold Mine Dr | remodel (2) upstairs bathrooms, all plubming & electrical work, reinstall sheetrock & tiles.Details
remodel (2) upstairs bathrooms, all plubming & electrical work, reinstall sheetrock & tiles. | $16,000 |
| Jun 26, 2015 | Completed final sign-off Aug 2016 | 1166 Green St | non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryerDetails
non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryer | $15,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side.Details
rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side. | $120,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel.Details
complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel. | $30,000 |
| Nov 12, 2014 | Completed final sign-off Dec 2014 | 422 Valencia St | to install grab bars in all common use bathrooms of the hotel. to comply with grab bar ordinance. n/a for maher ordinance.Details
to install grab bars in all common use bathrooms of the hotel. to comply with grab bar ordinance. n/a for maher ordinance. | $9,800 |
| Sep 16, 2014 | Completed final sign-off Jun 2015 | 116 Everson St | remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house.Details
remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house. | $38,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spacesDetails
3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spaces | $30,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces.Details
3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces. | $30,000 |
| Aug 1, 2014 | Completed final sign-off Feb 2015 | 1519 Mckinnon Av | reconfigure floor plan on 1st and 2nd floor and new bathroom on 1st floor.Details
reconfigure floor plan on 1st and 2nd floor and new bathroom on 1st floor. | $10,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2014 | 2442 15th St | remodel kitchen and bath; to comply with cec150(k) 8 & 10Details
remodel kitchen and bath; to comply with cec150(k) 8 & 10 | $18,000 |
| May 23, 2014 | Completed final sign-off Jun 2014 | 3048 16th St | install grab bars in all bathrooms comply with nov 201323152 item #2Details
install grab bars in all bathrooms comply with nov 201323152 item #2 | $1,200 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 474 Valencia St | install grab bars in all bathrooms; compliance with ord 155-13 not requiredDetails
install grab bars in all bathrooms; compliance with ord 155-13 not required | $1,200 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 2579 35th Av | kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tilesDetails
kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tiles | $18,000 |
| Jan 16, 2014 | Completed final sign-off May 2014 | 1470 20th Av | relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom.Details
relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom. | $38,000 |
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 1379 42nd Av | remove tiles in bathroom install new bathtub, new vanity, new toilet install new tiles around bathtub and floor. no change of wall, window and door.Details
remove tiles in bathroom install new bathtub, new vanity, new toilet install new tiles around bathtub and floor. no change of wall, window and door. | $5,400 |
| Oct 1, 2013 | Completed final sign-off Oct 2013 | 615 Noe St | to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub.Details
to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub. | $3,500 |
| Jun 5, 2013 | Completed final sign-off Jun 2013 | 51 06th St | to comply with ordiance 029-13 only; installation of grab bars in sro at the following locations: -all 7 floors; each floor have 3 bathroomsDetails
to comply with ordiance 029-13 only; installation of grab bars in sro at the following locations: -all 7 floors; each floor have 3 bathrooms | $1,200 |
| May 28, 2013 | Completed final sign-off Jun 2013 | 175 06th St | to install new grab bar in all bathrooms: 5th floor 4 shower rooms with bathtub, 8 toilets, 4th floor: same amount, 3rd floor, same amount, 2nd floor: same amount. based on ordinance #029-13 load rating 250 pound. grab bar comply cbc chapter 11b.Details
to install new grab bar in all bathrooms: 5th floor 4 shower rooms with bathtub, 8 toilets, 4th floor: same amount, 3rd floor, same amount, 2nd floor: same amount. based on ordinance #029-13 load rating 250 pound. grab bar comply cbc chapter 11b. | $800 |
| May 22, 2013 | Completed final sign-off May 2013 | 516 Ofarrell St | to install new grab bar in all bathrooms to comply with the new city code, 3 bathrm in each floor, 2nd, 3rd, 4th and 5th flr, grab bar min load rating of 250 lbs.Details
to install new grab bar in all bathrooms to comply with the new city code, 3 bathrm in each floor, 2nd, 3rd, 4th and 5th flr, grab bar min load rating of 250 lbs. | $800 |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 373 Ellis St | replace tiles in bathroom in 2nd and 3rd flrsDetails
replace tiles in bathroom in 2nd and 3rd flrs | $1,500 |