Essa's Remodeling
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Jun 2026
- Last 24 months
- 7 permits filed
88 permits since 2000: 67 completed, 5 in progress, 13 never finaled, 3 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 completed, 1 in progress, 1 never finaled. Typically 22 days from filing to permit and 11 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2025 | In progress issued Sep 2025 | 669 Geary St | abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupantDetails
abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupant | $20,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side.Details
rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side. | $120,000 |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 680 48th Av | expand front deck per plans within current building envelope, this is a revision to approved permit 201411040635.Details
expand front deck per plans within current building envelope, this is a revision to approved permit 201411040635. | $25,000 |
| May 11, 2011 | Completed final sign-off May 2011 | 374 Moultrie St | some additional dry rot work need to be done on different parts of the decks and some work that was done before by other. to have it incorporated and included in the same permit; to comply with nov 201185848; total work on the deck is less than 50%; repair in kindDetails
some additional dry rot work need to be done on different parts of the decks and some work that was done before by other. to have it incorporated and included in the same permit; to comply with nov 201185848; total work on the deck is less than 50%; repair in kind | $500 |
| May 5, 2011 | Completed final sign-off May 2011 | 374 Moultrie St | repair dry rot wood in the back deck, 1 4x4 post need to be repaired, replace in kind. this permit is only for the dry rot repair. it does not include any other work on the property such as violation #201185848Details
repair dry rot wood in the back deck, 1 4x4 post need to be repaired, replace in kind. this permit is only for the dry rot repair. it does not include any other work on the property such as violation #201185848 | $800 |