Back to kitchen remodel contractors
Ehj Construction,Inc.
- Based in
- San Francscico
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 11 permits filed
106 permits since 2000: 91 completed, 3 in progress, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 23 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 1671 Church St | house remodel and new bath addition. removeal of some interior walls, non load bearing. build some interior walls. remodel e master bedrom and kitchen. relate e bath and add powder room.Details
house remodel and new bath addition. removeal of some interior walls, non load bearing. build some interior walls. remodel e master bedrom and kitchen. relate e bath and add powder room. | $27,000 |
| Sep 9, 2025 | Completed final sign-off Nov 2025 | 300 Niagara Av | kitchen remodel, replace kitchen cabintry, existing layout to remain. like for like repair.Details
kitchen remodel, replace kitchen cabintry, existing layout to remain. like for like repair. | $20,000 |
| May 21, 2025 | Completed final sign-off Aug 2025 | 3726 21st St | remodel (e) kitchen on the 2/f. remove bearing wall between kitchen and dining room.Details
remodel (e) kitchen on the 2/f. remove bearing wall between kitchen and dining room. | $60,000 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 561 Greenwich St | unit # 5: remodel (e) kitchen no layout change, remodel (e) bathroom no layout change, convert (e) tub to stand up shower using pre fab shower trayDetails
unit # 5: remodel (e) kitchen no layout change, remodel (e) bathroom no layout change, convert (e) tub to stand up shower using pre fab shower tray | $30,000 |
| Sep 1, 2022 | Completed final sign-off Jan 2023 | 3726 Broderick St | unit #3: patch amd replace drywall in hallway, bedroom and bathroomand kitchen due to water damage and remediation tear out replace bathroom remodel bathroom, remodel kitchenDetails
unit #3: patch amd replace drywall in hallway, bedroom and bathroomand kitchen due to water damage and remediation tear out replace bathroom remodel bathroom, remodel kitchen | $40,000 |
| Feb 23, 2022 | Completed final sign-off Mar 2022 | 455 07th Av | unit #3. replace countertops in kitchen. modify one existing cabinetry to accomodate (n) 18" dishwasher. run new electrical circuit for dishwasher.Details
unit #3. replace countertops in kitchen. modify one existing cabinetry to accomodate (n) 18" dishwasher. run new electrical circuit for dishwasher. | $5,000 |
| Apr 6, 2021 | Completed final sign-off Oct 2021 | 1175 Union St | remodel kitchen: replace cabinety & counter top. remodel full bath:replace (e) tub/tile flr & around tub. remodel 1/2 bath: replace (e) toliet/replace lavatory. no change to layout of walls & openings.Details
remodel kitchen: replace cabinety & counter top. remodel full bath:replace (e) tub/tile flr & around tub. remodel 1/2 bath: replace (e) toliet/replace lavatory. no change to layout of walls & openings. | $30,000 |
| May 27, 2020 | Completed final sign-off Oct 2020 | 2225 23rd St | unit 304: remodel kitchen. replace extg cabinetry and countertops. install new tile floor and tile back splash. all work in-kind.Details
unit 304: remodel kitchen. replace extg cabinetry and countertops. install new tile floor and tile back splash. all work in-kind. | $13,000 |
| Feb 25, 2020 | Completed final sign-off Jun 2020 | 1200 Rhode Island St | kitchen remodel: remove(e) cabinets & countertops and back splash and install new.Details
kitchen remodel: remove(e) cabinets & countertops and back splash and install new. | $12,000 |
| Feb 25, 2020 | Completed final sign-off Dec 2020 | 542 Wisconsin St | remodel kitchen: remove (e) cabinetry, counters, and backsplash. install new in kind.Details
remodel kitchen: remove (e) cabinetry, counters, and backsplash. install new in kind. | $12,000 |
| Jan 15, 2020 | Completed final sign-off Jun 2020 | 1254 Rhode Island St | apt 14: replace all kitchen cabinetry and count top. lay out to remain the same. replace flooringwith engineered floating floor throughout unit.Details
apt 14: replace all kitchen cabinetry and count top. lay out to remain the same. replace flooringwith engineered floating floor throughout unit. | $15,000 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 2250 24th St | remodel kitchen in studio condo. replace all cabinetry and countertops. also replace flooring in kitchen. same layout. maintain same adaptable heights & clearances.Details
remodel kitchen in studio condo. replace all cabinetry and countertops. also replace flooring in kitchen. same layout. maintain same adaptable heights & clearances. | $11,000 |
| Mar 1, 2019 | Completed final sign-off May 2019 | 2225 23rd St | replace kitchen cabinets and countertop. layout to remain the same. no change to walls and openings.Details
replace kitchen cabinets and countertop. layout to remain the same. no change to walls and openings. | $7,500 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 1816 20th St | remove existing sheetrock in the cieling from bedroom,kitchen, dining rm, living, rm and replace with quiterockDetails
remove existing sheetrock in the cieling from bedroom,kitchen, dining rm, living, rm and replace with quiterock | $11,000 |
| Mar 3, 2016 | Completed final sign-off Aug 2016 | 2592 38th Av | interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room.Details
interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room. | $40,000 |
| Nov 20, 2014 | Completed final sign-off Apr 2015 | 3669 23rd St | interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replaceDetails
interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replace | $50,000 |
| Mar 18, 2013 | Completed final sign-off Jun 2013 | 2121 Laguna St | replace kitchen cabinets in kitchen. replace tiles in two bathrooms.Details
replace kitchen cabinets in kitchen. replace tiles in two bathrooms. | $19,000 |
| Mar 25, 2011 | Never finaled issued Mar 2011, no final | 542 Wisconsin St | unit #12: enlarge opening in bearing wall at kitchen to create a pass-through. existing wall have no plywood sheathing.Details
unit #12: enlarge opening in bearing wall at kitchen to create a pass-through. existing wall have no plywood sheathing. | $5,000 |
| May 2, 2008 | Completed final sign-off May 2008 | 625 Divisadero St | painting, repair window trim replacement in kind. @ kitchen cabinet and sink, new. countertop, replace toilet + vanity, floor corvering vinyl + carpet in living room.Details
painting, repair window trim replacement in kind. @ kitchen cabinet and sink, new. countertop, replace toilet + vanity, floor corvering vinyl + carpet in living room. | $11,811 |
| Apr 19, 2007 | Completed final sign-off Dec 2007 | 4441 20th St | replace/rmodel kitchen, replace existing rear door, replace existing bath window.Details
replace/rmodel kitchen, replace existing rear door, replace existing bath window. | $35,000 |
| Mar 5, 2007 | Completed final sign-off May 2007 | 152 Lombard St | demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changesDetails
demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changes | $13,950 |
| Feb 15, 2006 | Completed final sign-off Aug 2006 | 150 Lombard St | replacement of (3) bathroom tiles, replacement of (1) kitchen cabinets, countertopDetails
replacement of (3) bathroom tiles, replacement of (1) kitchen cabinets, countertop | $40,000 |
| Nov 9, 2004 | Completed final sign-off May 2005 | 333 Bush St | replace (e) kitchen cabinets & appliances, modify (e) non load bearing parthions; replace (e) floorDetails
replace (e) kitchen cabinets & appliances, modify (e) non load bearing parthions; replace (e) floor | $50,000 |
| Feb 14, 2003 | Completed final sign-off May 2003 | 2 Fallon Pl | rev#200212203978 enchorage for (e) cantilener beam for kitchen remodel in handa residenDetails
rev#200212203978 enchorage for (e) cantilener beam for kitchen remodel in handa residen | $3,000 |
| Dec 20, 2002 | Completed final sign-off May 2003 | 2 Fallon Pl | #43- install water heater & kitchen appliances/cabinets remodelingDetails
#43- install water heater & kitchen appliances/cabinets remodeling | $10,000 |