- 11 permits filed
106 permits since 2000: 91 completed, 3 in progress, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 33 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 1671 Church St | house remodel and new bath addition. removeal of some interior walls, non load bearing. build some interior walls. remodel e master bedrom and kitchen. relate e bath and add powder room.Details
house remodel and new bath addition. removeal of some interior walls, non load bearing. build some interior walls. remodel e master bedrom and kitchen. relate e bath and add powder room. | $27,000 |
| Dec 16, 2025 | Completed final sign-off Jul 2026 | 1349 17th Av | remodel to install (n) bathroom in (e) walk in closet remodel (e) 2 bathrooms, relocate washer and dryer , and window replace in kind facing street. electrical to replace main panel to 200amps and rewireDetails
remodel to install (n) bathroom in (e) walk in closet remodel (e) 2 bathrooms, relocate washer and dryer , and window replace in kind facing street. electrical to replace main panel to 200amps and rewire | $18,000 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 561 Greenwich St | unit # 5: remodel (e) kitchen no layout change, remodel (e) bathroom no layout change, convert (e) tub to stand up shower using pre fab shower trayDetails
unit # 5: remodel (e) kitchen no layout change, remodel (e) bathroom no layout change, convert (e) tub to stand up shower using pre fab shower tray | $30,000 |
| Sep 1, 2022 | Completed final sign-off Jan 2023 | 3726 Broderick St | unit #2: patch and replace drywall in hallway, bedroom, bathroom due to water damage and remediation tear off.Details
unit #2: patch and replace drywall in hallway, bedroom, bathroom due to water damage and remediation tear off. | $5,000 |
| Sep 1, 2022 | Completed final sign-off Jan 2023 | 3726 Broderick St | unit #3: patch amd replace drywall in hallway, bedroom and bathroomand kitchen due to water damage and remediation tear out replace bathroom remodel bathroom, remodel kitchenDetails
unit #3: patch amd replace drywall in hallway, bedroom and bathroomand kitchen due to water damage and remediation tear out replace bathroom remodel bathroom, remodel kitchen | $40,000 |
| Sep 1, 2022 | Completed final sign-off Dec 2022 | 3726 Broderick St | unit #6: patch amd replace drywall in hallway, bedroom and bathroom, due to water damage and remediation tear out replace bathroom floorDetails
unit #6: patch amd replace drywall in hallway, bedroom and bathroom, due to water damage and remediation tear out replace bathroom floor | $20,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 55 Linares Av | remodel two existing bathrooms.Details
remodel two existing bathrooms. | $30,000 |
| Apr 6, 2021 | Completed final sign-off Oct 2021 | 1175 Union St | remodel kitchen: replace cabinety & counter top. remodel full bath:replace (e) tub/tile flr & around tub. remodel 1/2 bath: replace (e) toliet/replace lavatory. no change to layout of walls & openings.Details
remodel kitchen: replace cabinety & counter top. remodel full bath:replace (e) tub/tile flr & around tub. remodel 1/2 bath: replace (e) toliet/replace lavatory. no change to layout of walls & openings. | $30,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 898 Union St | update/remodel bathroom; replace (e) bath tub; install new tile floor; install new tiles in bathtub /showerDetails
update/remodel bathroom; replace (e) bath tub; install new tile floor; install new tiles in bathtub /shower | $10,000 |
| Feb 10, 2020 | Completed final sign-off Jun 2020 | 808 Red Leaf Ct | remodel 2 bathrooms - replace vanity tub shower, lights fixtures, fan / ligth, tile floor, sinks, toilets, mirror and repaint. n o change in walls & opening layoutDetails
remodel 2 bathrooms - replace vanity tub shower, lights fixtures, fan / ligth, tile floor, sinks, toilets, mirror and repaint. n o change in walls & opening layout | $29,868 |
| Jul 3, 2018 | Completed final sign-off Oct 2018 | 440 Grove St | remodel (2) bathrooms including fabricating a new shower pan for master bath & replacing bath tub in hall bath, retiling floor & tub/shower wlls, replace toilets & vanities, same size/locationDetails
remodel (2) bathrooms including fabricating a new shower pan for master bath & replacing bath tub in hall bath, retiling floor & tub/shower wlls, replace toilets & vanities, same size/location | $18,000 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 2225 23rd St | bathroom remodel, install new vanity, install new tub, tile floor and shower walls. maher naDetails
bathroom remodel, install new vanity, install new tub, tile floor and shower walls. maher na | $10,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 119 Alhambra St | replace faulty tiles and grout with new tiles around the bath bathtub and bathroom floor.Details
replace faulty tiles and grout with new tiles around the bath bathtub and bathroom floor. | $8,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2016 | 95 Clarendon Av | remodel bathroom (master bathroom). remove partition walls between toilet & sink. remove partition between master bedroom and small room to convert to closet.Details
remodel bathroom (master bathroom). remove partition walls between toilet & sink. remove partition between master bedroom and small room to convert to closet. | $26,000 |
| Mar 14, 2016 | Completed final sign-off Apr 2016 | 2250 24th St | replace bath tub and re-tile bath tub around. n/a maher ord. 155-13Details
replace bath tub and re-tile bath tub around. n/a maher ord. 155-13 | $6,000 |
| Mar 3, 2016 | Completed final sign-off Aug 2016 | 2592 38th Av | interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room.Details
interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room. | $40,000 |
| Feb 18, 2016 | Never finaled issued Jul 2016, no final | 3669 23rd St | add a 3rd unit by remodel part of ground level garage & utility space into 3rd dwelling unit, 1 bedroom & 1 bathroom. see notice of special restrictions 2016-k239841-00.Details
add a 3rd unit by remodel part of ground level garage & utility space into 3rd dwelling unit, 1 bedroom & 1 bathroom. see notice of special restrictions 2016-k239841-00. | $35,000 |
| Nov 20, 2014 | Completed final sign-off Apr 2015 | 3669 23rd St | interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replaceDetails
interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replace | $50,000 |
| Apr 7, 2014 | Completed final sign-off Jul 2014 | 1200 Rhode Island St | replace pre fabricated shower pan and retile bathrooms. 2 bathrooms total - retile of shower area only and floor areaDetails
replace pre fabricated shower pan and retile bathrooms. 2 bathrooms total - retile of shower area only and floor area | $8,000 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 380 10th St | interior remodel; no structural. add new shower stall at extg powder room; relocate lavatore. rearrangement within existing bathroom walls. n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
interior remodel; no structural. add new shower stall at extg powder room; relocate lavatore. rearrangement within existing bathroom walls. n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $11,000 |
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 2225 23rd St | tile bathroom walls & install/anchor bath tub. all work to be performed within unit #211 only.Details
tile bathroom walls & install/anchor bath tub. all work to be performed within unit #211 only. | $5,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2013 | 2250 24th St | unit 123 - to nremove existing tiles and grouting and install new tiles and grouting throughout bathroom.Details
unit 123 - to nremove existing tiles and grouting and install new tiles and grouting throughout bathroom. | $4,800 |
| Jun 5, 2013 | Completed final sign-off Jul 2013 | 2225 23rd St | remove existing tiles from bathroom walls and floor, re-tile shower walls and floorDetails
remove existing tiles from bathroom walls and floor, re-tile shower walls and floor | $4,500 |
| Mar 18, 2013 | Completed final sign-off Jun 2013 | 2121 Laguna St | replace kitchen cabinets in kitchen. replace tiles in two bathrooms.Details
replace kitchen cabinets in kitchen. replace tiles in two bathrooms. | $19,000 |
| Feb 21, 2012 | Completed final sign-off Mar 2012 | 2250 24th St | remove and repair tiles in bathroom. bathroom remodelDetails
remove and repair tiles in bathroom. bathroom remodel | $4,000 |
| Apr 19, 2011 | Completed final sign-off Sep 2011 | 1532 Pacific Av | in rear. installing electrical heating floor matte in matter bedroom at bathroom. also work under appl#200910138822Details
in rear. installing electrical heating floor matte in matter bedroom at bathroom. also work under appl#200910138822 | $2,500 |
| Mar 24, 2010 | Completed final sign-off Apr 2010 | 650 02nd St | in unit #305: replacing shower wall tile, floor, shower pan & shower valve in the bathroom. no windows and no doors on this permit.Details
in unit #305: replacing shower wall tile, floor, shower pan & shower valve in the bathroom. no windows and no doors on this permit. | $10,000 |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 152 Lombard St | work @ unit# 307c only. replace shower pan with new tile and pan in bathroom shower.Details
work @ unit# 307c only. replace shower pan with new tile and pan in bathroom shower. | $10,000 |
| Apr 19, 2007 | Completed final sign-off Dec 2007 | 4441 20th St | replace/rmodel kitchen, replace existing rear door, replace existing bath window.Details
replace/rmodel kitchen, replace existing rear door, replace existing bath window. | $35,000 |
| Mar 5, 2007 | Completed final sign-off May 2007 | 152 Lombard St | demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changesDetails
demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1 kitchen & 1 bath (one in unit 40 & 39) plumbing repairs . no structural changes | $13,950 |
| Jan 11, 2007 | Completed final sign-off Mar 2007 | 536 Wisconsin St | remodel 2 bathrooms. install new plumbing valves in (e) locations. new shower pan. tile pan & walls & floor. shower drain in (e) location. no change.Details
remodel 2 bathrooms. install new plumbing valves in (e) locations. new shower pan. tile pan & walls & floor. shower drain in (e) location. no change. | $6,000 |
| Jun 20, 2006 | Expired or cancelled expired Dec 2007 | 601 04th St | sheetrock repair in bathroom from water damage.Details
sheetrock repair in bathroom from water damage. | $1,600 |
| Apr 25, 2006 | Completed final sign-off May 2006 | 1591 Jackson St | replace tiles on thress walls around the bath tub.Details
replace tiles on thress walls around the bath tub. | $3,700 |
| Feb 21, 2006 | Completed final sign-off Sep 2006 | 3685 19th St | remove (e) lath & plaster in two room and bathroom & replace with sheetrock. remove (e) tile & shower pan in bathroom & replace shower panDetails
remove (e) lath & plaster in two room and bathroom & replace with sheetrock. remove (e) tile & shower pan in bathroom & replace shower pan | $3,000 |
| Feb 15, 2006 | Completed final sign-off Aug 2006 | 150 Lombard St | replacement of (3) bathroom tiles, replacement of (1) kitchen cabinets, countertopDetails
replacement of (3) bathroom tiles, replacement of (1) kitchen cabinets, countertop | $40,000 |
| Jan 11, 2006 | Completed final sign-off Mar 2006 | 538 Wisconsin St | replace tiles in the master bathroom. small bathroom.Details
replace tiles in the master bathroom. small bathroom. | $5,000 |
| Nov 18, 2005 | Completed final sign-off Aug 2018 | 345 Church St | replace tub with shower with tile in bathroomDetails
replace tub with shower with tile in bathroom | $7,600 |