Egoodat Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2026
- Last 24 months
- 13 permits filed
82 permits since 2000: 60 completed, 7 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 5 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 24 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | In progress issued Mar 2026 | 365 Hill St | remove (e) deck & stair to yard. replace with (n) deck & stair.Details
remove (e) deck & stair to yard. replace with (n) deck & stair. | $16,000 |
| Mar 25, 2025 | In progress issued Apr 2025 | 365 Hill St | kitchen remodel open wall between living room and kitchen. (n) steel beam, replace french doors and windows with (n) door remodel upper bath, no change to fixtures locations. remove and replace existing rear deck and stairs to yard.Details
kitchen remodel open wall between living room and kitchen. (n) steel beam, replace french doors and windows with (n) door remodel upper bath, no change to fixtures locations. remove and replace existing rear deck and stairs to yard. | $65,000 |
| Jun 17, 2024 | Completed final sign-off Feb 2025 | 541 Diamond St | add a new 185sf deck on the garage and add 28sf of landing to connect the stairs. apply variance for the deck in setback.Details
add a new 185sf deck on the garage and add 28sf of landing to connect the stairs. apply variance for the deck in setback. | $12,500 |
| Feb 28, 2023 | Expired or cancelled expired Mar 2026 | 525 Buena Vista West Av | exploratory demolition of drywall around the hallway and staircase at interior. ~250 sqftDetails
exploratory demolition of drywall around the hallway and staircase at interior. ~250 sqft | $2,000 |
| Sep 28, 2017 | Never finaled issued Dec 2018, no final | 717 Guerrero St | redesign of the rear yard stair. (n) decks at the 2nd & 3rd floor with alterations as needed for (n) doors on to deck and stair.Details
redesign of the rear yard stair. (n) decks at the 2nd & 3rd floor with alterations as needed for (n) doors on to deck and stair. | $25,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2018 | 1621 Castro St | construct 2 bedrooms, 2 bathrooms at g/f, relocate (e) kitchen to dining room, convert (e) kitchen space to bedroom & re-built interior staircase down to g/f, remove (e) wall in hallway & upgrade 2/f ceiling joists.Details
construct 2 bedrooms, 2 bathrooms at g/f, relocate (e) kitchen to dining room, convert (e) kitchen space to bedroom & re-built interior staircase down to g/f, remove (e) wall in hallway & upgrade 2/f ceiling joists. | $82,000 |
| Jul 27, 2017 | Completed final sign-off Sep 2019 | 4712 25th St | 2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per planDetails
2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per plan | $96,000 |
| Apr 7, 2017 | Completed final sign-off Jan 2019 | 171 03rd Av | expand 2nd floor unit into ground floor storage space with open stair,new bathroom. no change to exterior volume.** maher: n/a **Details
expand 2nd floor unit into ground floor storage space with open stair,new bathroom. no change to exterior volume.** maher: n/a ** | $75,000 |
| May 4, 2015 | Completed final sign-off Aug 2015 | 1441 Clay St | repair exterior stair in kind, replace damage portion of post, replace foundation, redo curb. n/a ordinance #155-13Details
repair exterior stair in kind, replace damage portion of post, replace foundation, redo curb. n/a ordinance #155-13 | $8,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 565 04th St | revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $68,000 |