Back to kitchen remodel contractors
Egoodat Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2026
- Last 24 months
- 13 permits filed
82 permits since 2000: 60 completed, 7 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 20 completed, 2 in progress, 3 never finaled. Typically 15 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2026 | In progress issued Jun 2026 | 318 Scott St | unit 318- kitchen and bathroom remodel to include (n) skylights, window replacement in kind not visible from street.Details
unit 318- kitchen and bathroom remodel to include (n) skylights, window replacement in kind not visible from street. | $65,000 |
| Mar 25, 2025 | In progress issued Apr 2025 | 365 Hill St | kitchen remodel open wall between living room and kitchen. (n) steel beam, replace french doors and windows with (n) door remodel upper bath, no change to fixtures locations. remove and replace existing rear deck and stairs to yard.Details
kitchen remodel open wall between living room and kitchen. (n) steel beam, replace french doors and windows with (n) door remodel upper bath, no change to fixtures locations. remove and replace existing rear deck and stairs to yard. | $65,000 |
| Nov 25, 2024 | Completed final sign-off Jan 2025 | 888 Douglass St | (1) replacing kitchen cabinets. countertops and backsplash; replace 2 bathroom vanity cabinets. no change in rough electrical or plumbing; no wall demolition or construction; no change in plumbing fixture count;Details
(1) replacing kitchen cabinets. countertops and backsplash; replace 2 bathroom vanity cabinets. no change in rough electrical or plumbing; no wall demolition or construction; no change in plumbing fixture count; | $38,000 |
| Nov 17, 2023 | Completed final sign-off Feb 2024 | 1817 California St | unit 208: (1) kitchen remodeling: (1) bathroom remodeling: (3) installation recessed lights on ceilingDetails
unit 208: (1) kitchen remodeling: (1) bathroom remodeling: (3) installation recessed lights on ceiling | $25,000 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 2501 Ocean Av | t.i. for new cafe. interior remodel of partitions, plumbing fixturs, lighting and finihes. new kitchen, new counter, new finishes and fixtures througout (e) ada bathroom will remain.Details
t.i. for new cafe. interior remodel of partitions, plumbing fixturs, lighting and finihes. new kitchen, new counter, new finishes and fixtures througout (e) ada bathroom will remain. | $65,000 |
| Sep 13, 2021 | Completed final sign-off Jan 2022 | 598 Guerrero St | minor remodel of (e) restaurant: new counter prep area/seating. (e) accessible entry, kitchen, lighitng to remain unchanged. (e) ada restroom to remain. no structural work, no changes to doors/storefront. mep/life safety engineering shall be part of a sep permit if reqd.Details
minor remodel of (e) restaurant: new counter prep area/seating. (e) accessible entry, kitchen, lighitng to remain unchanged. (e) ada restroom to remain. no structural work, no changes to doors/storefront. mep/life safety engineering shall be part of a sep permit if reqd. | $15,000 |
| Aug 21, 2019 | Completed final sign-off May 2021 | 143 04th Av | create new studio dwelling unit a lower level. remodel kitchen, remodel upper level bath and add bath.Details
create new studio dwelling unit a lower level. remodel kitchen, remodel upper level bath and add bath. | $75,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2019 | 1817 California St | remodeling and restoring the existing kitchen 50sq ft and one full bathroom. another half bath 15 sqft. all plumbing and electrical rough in will be kept as is. wall patches for water damages. no changes to (e) floorplanDetails
remodeling and restoring the existing kitchen 50sq ft and one full bathroom. another half bath 15 sqft. all plumbing and electrical rough in will be kept as is. wall patches for water damages. no changes to (e) floorplan | $25,000 |
| Jul 18, 2018 | Never finaled issued Aug 2018, no final | 425 Upper Tr | unit 2: remove power room, add new full bath. expand kitchen. all work w/in unit, no work in common areas, no fire alarm/sprinkler work required.Details
unit 2: remove power room, add new full bath. expand kitchen. all work w/in unit, no work in common areas, no fire alarm/sprinkler work required. | $15,000 |
| Jul 18, 2018 | Completed final sign-off Mar 2019 | 2878 Jackson St | install (n) tile floors and counter tops in kitchen, keeping (e) cabinets. install (n) toilet, vanity w/ sink and tile in (e) bathroom, keeping (e) tub. replace plumbing fixtures at kitchen sink, bath sink and shower. no walls moved, removed, added or infilled. all (e) layouts to remain. maher n/aDetails
install (n) tile floors and counter tops in kitchen, keeping (e) cabinets. install (n) toilet, vanity w/ sink and tile in (e) bathroom, keeping (e) tub. replace plumbing fixtures at kitchen sink, bath sink and shower. no walls moved, removed, added or infilled. all (e) layouts to remain. maher n/a | $57,000 |
| Sep 29, 2017 | Completed final sign-off May 2019 | 365 Hill St | g/f: interior remodel: convert (e) space used as home gym to bedroomm, add bathroom and closet. remove post at garage, add steel beam. 2/f- open wall between kitchen & family room. 3rd flr: relocate toilet at master bathroom. add lavy, replace finishes.Details
g/f: interior remodel: convert (e) space used as home gym to bedroomm, add bathroom and closet. remove post at garage, add steel beam. 2/f- open wall between kitchen & family room. 3rd flr: relocate toilet at master bathroom. add lavy, replace finishes. | $65,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2018 | 1621 Castro St | construct 2 bedrooms, 2 bathrooms at g/f, relocate (e) kitchen to dining room, convert (e) kitchen space to bedroom & re-built interior staircase down to g/f, remove (e) wall in hallway & upgrade 2/f ceiling joists.Details
construct 2 bedrooms, 2 bathrooms at g/f, relocate (e) kitchen to dining room, convert (e) kitchen space to bedroom & re-built interior staircase down to g/f, remove (e) wall in hallway & upgrade 2/f ceiling joists. | $82,000 |
| Jul 27, 2017 | Completed final sign-off Sep 2019 | 4712 25th St | 2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per planDetails
2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per plan | $96,000 |
| Dec 19, 2016 | Completed final sign-off Apr 2019 | 425 Upper Tr | replace all windows - all visible fron street to replace in kind with original alumi window. replace (e) door by new one. replace lighting fixtures. upgrade all (e) plumbing fixtures. kitchen and bath remodel. remove (e) fireplace and new interio finishesDetails
replace all windows - all visible fron street to replace in kind with original alumi window. replace (e) door by new one. replace lighting fixtures. upgrade all (e) plumbing fixtures. kitchen and bath remodel. remove (e) fireplace and new interio finishes | $50,000 |
| Aug 24, 2016 | Completed final sign-off Jul 2018 | 671 Connecticut St | #671- removal of (e) non compliant 1/f bathroom and select (n) finishes. #673- remodel kitchen and add bathroom on 3/f. exterior work- new front doors and rear balcony doors in both units, new front window to replace (e) front windows in #673. water heater in both units.Details
#671- removal of (e) non compliant 1/f bathroom and select (n) finishes. #673- remodel kitchen and add bathroom on 3/f. exterior work- new front doors and rear balcony doors in both units, new front window to replace (e) front windows in #673. water heater in both units. | $50,000 |
| Jun 3, 2016 | Completed final sign-off Mar 2017 | 719 Guerrero St | interior renovation at 719 guerrero (2nd floor): remodel existing kitchen, open kitchen to existing dining, remove pantry, create new bathroom from existing closet & hallway, new shearwall and footings at first story.Details
interior renovation at 719 guerrero (2nd floor): remodel existing kitchen, open kitchen to existing dining, remove pantry, create new bathroom from existing closet & hallway, new shearwall and footings at first story. | $47,000 |
| Nov 13, 2015 | Completed final sign-off Jun 2016 | 1587 08th Av | remodel (e) kitchen, bathroom & construct one new bathroom at 2/f & 3/f, remove/replace partial (e) foundation with new.Details
remodel (e) kitchen, bathroom & construct one new bathroom at 2/f & 3/f, remove/replace partial (e) foundation with new. | $68,000 |
| Nov 6, 2015 | Completed final sign-off Apr 2016 | 1432 24th Av | remodeling for 1 kitchen, 2 bathrooms, siding repair. no structural work.Details
remodeling for 1 kitchen, 2 bathrooms, siding repair. no structural work. | $20,000 |
| Sep 10, 2015 | Completed final sign-off Jun 2016 | 1085 Washington St | 2nd flr; apt 102: add bedroom. remodel kitchen (partial) in interior, maher naDetails
2nd flr; apt 102: add bedroom. remodel kitchen (partial) in interior, maher na | $15,000 |
| Sep 10, 2015 | Completed final sign-off Jun 2016 | 1085 Washington St | 4th flr, unit #404, #405: add bedrooms, remodel kitchens in both units. maher naDetails
4th flr, unit #404, #405: add bedrooms, remodel kitchens in both units. maher na | $40,000 |
| May 27, 2015 | Completed final sign-off Mar 2016 | 4541 18th St | interior remodel: bathroom, kitchen, & fireplace. replacement of windows not visible from the street and skylights (3 windows, 3 skylights)Details
interior remodel: bathroom, kitchen, & fireplace. replacement of windows not visible from the street and skylights (3 windows, 3 skylights) | $75,000 |
| May 13, 2015 | Never finaled issued Jun 2015, no final | 198 Waterville St | alter bathroom (hear office) with new wall + 1 (n) toilet + 1 (n) sinks. demo: brick planter and patch flooring; built-in wood bench; alter kitchen wall. install exterior window grates @ north coutyard; fireplace screen; (n) wood & tile flrng electr: (n) bathrm fan, replace lights & switches,Details
alter bathroom (hear office) with new wall + 1 (n) toilet + 1 (n) sinks. demo: brick planter and patch flooring; built-in wood bench; alter kitchen wall. install exterior window grates @ north coutyard; fireplace screen; (n) wood & tile flrng electr: (n) bathrm fan, replace lights & switches, | $18,500 |
| Apr 2, 2015 | Completed final sign-off Jul 2015 | 885 Franklin St | apt #205: remodel of interior: relocate kitchen, build wall/door for new bedroom. all exit egress paths reamin the same.Details
apt #205: remodel of interior: relocate kitchen, build wall/door for new bedroom. all exit egress paths reamin the same. | $15,000 |
| Mar 25, 2015 | Completed final sign-off Jul 2015 | 885 Franklin St | remodel apt 206 interior, relocate kitchen, build wall for study and bedroomDetails
remodel apt 206 interior, relocate kitchen, build wall for study and bedroom | $25,000 |
| Mar 11, 2015 | Completed final sign-off May 2015 | 885 Franklin St | #103- relocate kitchen, install wall for new bedroom.Details
#103- relocate kitchen, install wall for new bedroom. | $25,000 |