Block 1363, lot 015
165 03rd Ave
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 4
- Rooms
- 10 bedrooms, 5 bathrooms
- Building
- 4,691 sq ft
- Lot
- 2,898 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2026 | Completed final sign-off Mar 2026 | 165 03rd Av | Property Renovation Experts Llc | like to like 100/% siding replacement without any change or alteration in the structure at the back of the house. like to like replacement of 12 door trims at rear. apply waterproofing on the entire contour of the roof to cover (e) cracks. all work not visible from street.Details
like to like 100/% siding replacement without any change or alteration in the structure at the back of the house. like to like replacement of 12 door trims at rear. apply waterproofing on the entire contour of the roof to cover (e) cracks. all work not visible from street. | $20,350 |
| Dec 17, 2018 | Never finaled issued Dec 2018, no final | 171 03rd Av | street spaceDetails
street space | ||
| Apr 7, 2017 | Completed final sign-off Jan 2019 | 171 03rd Av | Egoodat Inc | expand 2nd floor unit into ground floor storage space with open stair,new bathroom. no change to exterior volume.** maher: n/a **Details
expand 2nd floor unit into ground floor storage space with open stair,new bathroom. no change to exterior volume.** maher: n/a ** | $75,000 |
| Nov 4, 2016 | Expired or cancelled withdrawn Feb 2017 | 171 03rd Av | add (1) new unit at first floor per ord 162-16Details
add (1) new unit at first floor per ord 162-16 | $50,000 | |
| Nov 10, 2010 | Completed final sign-off May 2011 | 165 03rd Av | Ward Alan Emery Construction Inc. | replace (e) dry rot structural unstable back staircase per nov dated 5-25-10. scope includes repair stairs, treads, stringer, column/post & handrails as requiredDetails
replace (e) dry rot structural unstable back staircase per nov dated 5-25-10. scope includes repair stairs, treads, stringer, column/post & handrails as required | $51,000 |
| Nov 1, 2010 | Expired or cancelled cancelled Jan 2026 | 165 03rd Av | Ward Alan Emery Construction Inc. | repair existing dry rot structuraly unstable back staircase per nov dated 5/25/10. scope includes in kind replacement of stair access to roof with alum ladder for safety reasons and any damaged tread, handrail, stringers column/postDetails
repair existing dry rot structuraly unstable back staircase per nov dated 5/25/10. scope includes in kind replacement of stair access to roof with alum ladder for safety reasons and any damaged tread, handrail, stringers column/post | $51,000 |
| Oct 21, 2009 | Completed final sign-off Nov 2009 | 165 03rd Av | New High Protection Roofing | reroofingDetails
reroofing | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ward Alan Emery Construction Inc. (2), Egoodat Inc, New High Protection Roofing, Property Renovation Experts Llc
- Architects
- Daniel Paris
- Engineers
- Lou Xiao, Nilgun A Wolpe
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.