East Bay Construction
- Based in
- Richmond
- On San Francisco permits
- Jan 2000 to Jun 2023
- Last 24 months
- 0 permits filed
53 permits since 2000: 45 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2005 | Completed final sign-off Aug 2005 | 2440 14th Av | replace tile, dry rot repair about 100 sf and reinforce structure at front stairway less than 50 perDetails
replace tile, dry rot repair about 100 sf and reinforce structure at front stairway less than 50 per | $6,000 |