Back to kitchen remodel contractors
East Bay Construction
- Based in
- Richmond
- On San Francisco permits
- Jan 2000 to Jun 2023
- Last 24 months
- 0 permits filed
53 permits since 2000: 45 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2019 | Completed final sign-off Jan 2021 | 101 Darien Wy | remodel kitchen, bath, remove e playroom structure, add closet in 2 rear bdrms window replacementDetails
remodel kitchen, bath, remove e playroom structure, add closet in 2 rear bdrms window replacement | $30,000 |
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| Apr 29, 2013 | Completed final sign-off Jun 2013 | 1742 33rd Av | remodel (e) small kitchen. min. 50% of total wattage of permanently installed lighting shall be high efficiency cec 150(k)Details
remodel (e) small kitchen. min. 50% of total wattage of permanently installed lighting shall be high efficiency cec 150(k) | $9,000 |
| Jul 16, 2012 | Completed final sign-off Oct 2012 | 1843 30th Av | remodel existing kitchenDetails
remodel existing kitchen | $10,000 |
| Nov 17, 2011 | Completed final sign-off Oct 2012 | 50 Sadowa St | #2 - remodel existing kitchen & 2 existing bathrooms. ref. pa#201009070286Details
#2 - remodel existing kitchen & 2 existing bathrooms. ref. pa#201009070286 | $20,000 |
| May 3, 2010 | Completed final sign-off Jun 2010 | 50 Farragut Av | remodel (e) kitchen, new fixtures, cabs, tiles in same location. no wall removal. atleast 50% high efficacy lighting (by wattage).Details
remodel (e) kitchen, new fixtures, cabs, tiles in same location. no wall removal. atleast 50% high efficacy lighting (by wattage). | $9,000 |
| Mar 2, 2010 | Expired or cancelled expired May 2025 | 349 Richland Av | remodel existing kitchen and bath in the front unitDetails
remodel existing kitchen and bath in the front unit | $20,000 |
| Feb 17, 2010 | Completed final sign-off Feb 2011 | 50 Sadowa St | remodel existing kitchen on the first floor front (no relocation of utilities) cabinets, tiles and floor.Details
remodel existing kitchen on the first floor front (no relocation of utilities) cabinets, tiles and floor. | $10,000 |
| Aug 5, 2008 | Completed final sign-off Nov 2008 | 230 Lowell St | correct violation3200838735. replace (3) type b vents. (b vents requires plumbing permit) at sides of building for bathroom & kitchen (to be 4 ft from prop. line)Details
correct violation3200838735. replace (3) type b vents. (b vents requires plumbing permit) at sides of building for bathroom & kitchen (to be 4 ft from prop. line) | $500 |
| Oct 3, 2006 | Completed final sign-off Feb 2007 | 2825 Lawton St | replace kitchen cabinets and sink. new kchn lighting to be high efficiency. no structural changesDetails
replace kitchen cabinets and sink. new kchn lighting to be high efficiency. no structural changes | $8,000 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 4245 Kirkham St | renovation 1 kitchen, repair 1 bathroom, tile floor (retile floor only), new counter top.Details
renovation 1 kitchen, repair 1 bathroom, tile floor (retile floor only), new counter top. | $5,000 |
| Sep 1, 2005 | Completed final sign-off Nov 2005 | 865 44th Av | replace kitchen caginets, bathroom floor tile 30 sf wall tile 70 sf and window @ gr floor. totalDetails
replace kitchen caginets, bathroom floor tile 30 sf wall tile 70 sf and window @ gr floor. total | $11,000 |
| Feb 11, 2002 | Completed final sign-off Mar 2002 | 1462 31st Av | replace cabinets at kitchen tile floor, no structural changesDetails
replace cabinets at kitchen tile floor, no structural changes | $5,000 |
| Feb 11, 2002 | Expired or cancelled expired Oct 2003 | 7 Santa Fe Av | repair cabinets at kitchen (no structural changes)Details
repair cabinets at kitchen (no structural changes) | $3,000 |
| Nov 30, 2000 | Completed final sign-off Mar 2001 | 1550 24th Av | replace kitchen cabinets counter top & re-tile & bathroom.Details
replace kitchen cabinets counter top & re-tile & bathroom. | $10,000 |
| Feb 26, 2000 | Expired or cancelled expired Jan 2001 | 2654 21st Av | re-sheetrock at kitchen ceiling & dining room.Details
re-sheetrock at kitchen ceiling & dining room. | $3,000 |