Back to bathroom remodel contractors
East Bay Construction
- Based in
- Richmond
- On San Francisco permits
- Jan 2000 to Jun 2023
- Last 24 months
- 0 permits filed
53 permits since 2000: 45 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 24 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2021 | Completed final sign-off Jun 2023 | 833 Duncan St | convert 1 car garage to family room. add play room, bathroom. legalize existing bathroom, bedroom & add tie beam between existing concrete pads.Details
convert 1 car garage to family room. add play room, bathroom. legalize existing bathroom, bedroom & add tie beam between existing concrete pads. | $26,000 |
| Jan 29, 2020 | Completed final sign-off Oct 2021 | 56 Dawnview Wy | provide new partition walls to create new hallway, bedroom, bath, den, laundry closet and separation from existing garage. provide new electrical and plumbing. new furnace.Details
provide new partition walls to create new hallway, bedroom, bath, den, laundry closet and separation from existing garage. provide new electrical and plumbing. new furnace. | $40,000 |
| Sep 16, 2019 | Completed final sign-off Jan 2021 | 101 Darien Wy | remodel kitchen, bath, remove e playroom structure, add closet in 2 rear bdrms window replacementDetails
remodel kitchen, bath, remove e playroom structure, add closet in 2 rear bdrms window replacement | $30,000 |
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 1637 Sacramento St | remodel existing small kitkchen &small bathroom in unit 14Details
remodel existing small kitkchen &small bathroom in unit 14 | $15,000 |
| Aug 20, 2012 | Completed final sign-off Oct 2012 | 544 Peralta Av | new bathroom and hall way on ground floor.Details
new bathroom and hall way on ground floor. | $15,000 |
| Jun 27, 2012 | Completed final sign-off Aug 2012 | 2039 Carroll Av | new social room, bedroom, and bath room on ground floor.Details
new social room, bedroom, and bath room on ground floor. | $10,000 |
| May 14, 2012 | Completed final sign-off Jun 2012 | 2430 39th Av | remodel existing bathroom, 2nd flr lighting to comply with cec 150kDetails
remodel existing bathroom, 2nd flr lighting to comply with cec 150k | $6,000 |
| Nov 17, 2011 | Completed final sign-off Oct 2012 | 50 Sadowa St | #2 - remodel existing kitchen & 2 existing bathrooms. ref. pa#201009070286Details
#2 - remodel existing kitchen & 2 existing bathrooms. ref. pa#201009070286 | $20,000 |
| Apr 21, 2010 | Completed final sign-off Feb 2011 | 50 Sadowa St | remove existing plaster and lath, replace 5/8" sheetrock in unit 1. remodel existing bath in unit 1. ref erence app 201002176630Details
remove existing plaster and lath, replace 5/8" sheetrock in unit 1. remodel existing bath in unit 1. ref erence app 201002176630 | $15,000 |
| Mar 2, 2010 | Expired or cancelled expired May 2025 | 349 Richland Av | remodel existing kitchen and bath in the front unitDetails
remodel existing kitchen and bath in the front unit | $20,000 |
| Dec 11, 2009 | Completed final sign-off Feb 2012 | 574 Peralta Av | new bathroom; new plumbing drain & copper pipes. new electrical outlets & light installation. new door and gypsum wall board and shower pan installed at ground floor.Details
new bathroom; new plumbing drain & copper pipes. new electrical outlets & light installation. new door and gypsum wall board and shower pan installed at ground floor. | $15,000 |
| Aug 5, 2008 | Completed final sign-off Nov 2008 | 230 Lowell St | correct violation3200838735. replace (3) type b vents. (b vents requires plumbing permit) at sides of building for bathroom & kitchen (to be 4 ft from prop. line)Details
correct violation3200838735. replace (3) type b vents. (b vents requires plumbing permit) at sides of building for bathroom & kitchen (to be 4 ft from prop. line) | $500 |
| May 19, 2008 | Completed final sign-off Aug 2008 | 239 Talbert St | new social rm, study rm, bathroom and storage rm on g/fDetails
new social rm, study rm, bathroom and storage rm on g/f | $20,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 140 Terra Vista Av | remodel bathroom. change tile, replace toilet.Details
remodel bathroom. change tile, replace toilet. | $2,000 |
| Aug 22, 2006 | Completed final sign-off Jun 2007 | 87 Wawona St | interior remodeling to existing building remodeling ground floor per plans relocating family room bath guest room laundry room and adding home office on ground floorDetails
interior remodeling to existing building remodeling ground floor per plans relocating family room bath guest room laundry room and adding home office on ground floor | $65,000 |
| Jun 21, 2006 | Completed final sign-off Oct 2006 | 4245 Kirkham St | renovation 1 kitchen, repair 1 bathroom, tile floor (retile floor only), new counter top.Details
renovation 1 kitchen, repair 1 bathroom, tile floor (retile floor only), new counter top. | $5,000 |
| May 31, 2006 | Completed final sign-off Jun 2008 | 2173 17th Av | master bedroom with bathroom (upper level). social room with bathroom (ground level).Details
master bedroom with bathroom (upper level). social room with bathroom (ground level). | $80,000 |
| May 26, 2006 | Completed final sign-off May 2008 | 225 Wawona St | second story addition with new master bedroom, new bedroom, new bathroom, new relocated first floor bathroom and new storage/shop area in (e0 basementDetails
second story addition with new master bedroom, new bedroom, new bathroom, new relocated first floor bathroom and new storage/shop area in (e0 basement | $150,000 |
| Sep 1, 2005 | Completed final sign-off Nov 2005 | 865 44th Av | replace kitchen caginets, bathroom floor tile 30 sf wall tile 70 sf and window @ gr floor. totalDetails
replace kitchen caginets, bathroom floor tile 30 sf wall tile 70 sf and window @ gr floor. total | $11,000 |
| Aug 25, 2005 | Completed final sign-off Oct 2007 | 1368 20th Av | to extend the rear of (e) building (all level). on 1st floor with 2 bedroom, 1 bath, laundry. on 2nd floor with 2 bedroom, 1 bath, 1 family room. on 3rd floor with 2 bedroom & 1 bathroom. (convert a single family dwelling into 2 units dwelling.Details
to extend the rear of (e) building (all level). on 1st floor with 2 bedroom, 1 bath, laundry. on 2nd floor with 2 bedroom, 1 bath, 1 family room. on 3rd floor with 2 bedroom & 1 bathroom. (convert a single family dwelling into 2 units dwelling. | $150,000 |
| Nov 22, 2004 | Completed final sign-off Jun 2005 | 342 Wayland St | convert (e) storage area to bath, bedroom & family room.Details
convert (e) storage area to bath, bedroom & family room. | $25,000 |
| Mar 15, 2004 | Completed final sign-off Feb 2005 | 534 Munich St | convert storage to bed rooms & bath roomDetails
convert storage to bed rooms & bath room | $16,800 |
| Dec 26, 2003 | Never finaled issued Dec 2003, no final | 2374 27th Av | add bath repair wall framing and foundation @first floor @ new playroomDetails
add bath repair wall framing and foundation @first floor @ new playroom | $11,000 |
| Nov 30, 2000 | Completed final sign-off Mar 2001 | 1550 24th Av | replace kitchen cabinets counter top & re-tile & bathroom.Details
replace kitchen cabinets counter top & re-tile & bathroom. | $10,000 |
| Jan 15, 2000 | Completed final sign-off Jul 2000 | 2428 14th Av | add bath &2 bedroom at ground floorDetails
add bath &2 bedroom at ground floor | $17,000 |
| Jan 5, 2000 | Completed final sign-off Apr 2000 | 343 Winding Wy | add bath & bedrm at ground floorDetails
add bath & bedrm at ground floor | $7,000 |