Earth Development
- Based in
- San Ramon
- On San Francisco permits
- Jul 2006 to Feb 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 402 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | new dormers @ n.w.s. quadrants of (e) roof. convert (e) attic into habitable to create 1 new bath, office & bedroom. new staircase form 3rd to 4th floor. new conc retain walls & conc slab in rear yard.Details
new dormers @ n.w.s. quadrants of (e) roof. convert (e) attic into habitable to create 1 new bath, office & bedroom. new staircase form 3rd to 4th floor. new conc retain walls & conc slab in rear yard. | $25,000 |
| Dec 9, 2014 | Expired or cancelled withdrawn Dec 2014 | 659 07th Av | rear yard only: remove (e) planters, stairs & hardscape as noted; (n) retaining walls and concrete stairs as noted, (n) redwood decking with concrete slabDetails
rear yard only: remove (e) planters, stairs & hardscape as noted; (n) retaining walls and concrete stairs as noted, (n) redwood decking with concrete slab | $10,000 |
| Oct 16, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | interior remodel @1,2,3 fl/1st flr: convert into habitable space, add 1.5 baths, 2nd fl: remodel (e) kitchen, relocate & remodel (e) bath, relocate & rebuild rear ext. stairs, 3rd flr: remodel, add one bath, replace all windows, repl garage & main entry door, replace f&r siding w/redwood sidingDetails
interior remodel @1,2,3 fl/1st flr: convert into habitable space, add 1.5 baths, 2nd fl: remodel (e) kitchen, relocate & remodel (e) bath, relocate & rebuild rear ext. stairs, 3rd flr: remodel, add one bath, replace all windows, repl garage & main entry door, replace f&r siding w/redwood siding | $125,000 |
| Sep 15, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | demo lath & plaster from all interior walls & ceilings on all floors, demo all non-structural interiors as noted in plans, demo all kitchen & bath fixtures, demo internal stairs to garage.Details
demo lath & plaster from all interior walls & ceilings on all floors, demo all non-structural interiors as noted in plans, demo all kitchen & bath fixtures, demo internal stairs to garage. | $8,500 |
| Jun 17, 2014 | Completed final sign-off Nov 2014 | 53 Sussex St | interior remodel to 1st & 2nd floor - add two baths & two new bedrooms on 1st floor, lower floor @ 1st floor level, replace interior stair. replace (e) rear facade vinyl siding with fiber cement siding, replace in kind front facade windows & replace rear facade windows.Details
interior remodel to 1st & 2nd floor - add two baths & two new bedrooms on 1st floor, lower floor @ 1st floor level, replace interior stair. replace (e) rear facade vinyl siding with fiber cement siding, replace in kind front facade windows & replace rear facade windows. | $50,000 |