Earth Development
- Based in
- San Ramon
- On San Francisco permits
- Jul 2006 to Feb 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 454 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2014 | Expired or cancelled withdrawn Dec 2014 | 659 07th Av | rear yard only: remove (e) planters, stairs & hardscape as noted; (n) retaining walls and concrete stairs as noted, (n) redwood decking with concrete slabDetails
rear yard only: remove (e) planters, stairs & hardscape as noted; (n) retaining walls and concrete stairs as noted, (n) redwood decking with concrete slab | $10,000 |
| Sep 24, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | replace existing slab at garage level. new slab and perimeter footing under existing pop out at rear of bldg. remove rear deck and canopyDetails
replace existing slab at garage level. new slab and perimeter footing under existing pop out at rear of bldg. remove rear deck and canopy | $25,000 |