Back to kitchen remodel contractors
Earth Development
- Based in
- San Ramon
- On San Francisco permits
- Jul 2006 to Feb 2015
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 451 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | interior remodel @1,2,3 fl/1st flr: convert into habitable space, add 1.5 baths, 2nd fl: remodel (e) kitchen, relocate & remodel (e) bath, relocate & rebuild rear ext. stairs, 3rd flr: remodel, add one bath, replace all windows, repl garage & main entry door, replace f&r siding w/redwood sidingDetails
interior remodel @1,2,3 fl/1st flr: convert into habitable space, add 1.5 baths, 2nd fl: remodel (e) kitchen, relocate & remodel (e) bath, relocate & rebuild rear ext. stairs, 3rd flr: remodel, add one bath, replace all windows, repl garage & main entry door, replace f&r siding w/redwood siding | $125,000 |
| Sep 15, 2014 | Completed final sign-off Dec 2015 | 659 07th Av | demo lath & plaster from all interior walls & ceilings on all floors, demo all non-structural interiors as noted in plans, demo all kitchen & bath fixtures, demo internal stairs to garage.Details
demo lath & plaster from all interior walls & ceilings on all floors, demo all non-structural interiors as noted in plans, demo all kitchen & bath fixtures, demo internal stairs to garage. | $8,500 |