Durkin Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Aug 2026
- Last 24 months
- 7 permits filed
68 permits since 2000: 48 completed, 11 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 2 completed, 1 in progress. Typically 119 days from filing to permit and 900 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Aug 2026 | 2417 Green St | the proposed project generally consists of the addition of a roof deck to the rear 4th sloor and motarized operable skylight assembly to an existing 4 story over basement single family residence. revision to bpa 201704285244 addendum 1 & 2.Details
the proposed project generally consists of the addition of a roof deck to the rear 4th sloor and motarized operable skylight assembly to an existing 4 story over basement single family residence. revision to bpa 201704285244 addendum 1 & 2. | $25,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2020 | 1072 Filbert St | construct new roof deck above extg fourth floor. construct new interior stair and sliding hatch to roof deck. replace garage door and windows at the front in kind.Details
construct new roof deck above extg fourth floor. construct new interior stair and sliding hatch to roof deck. replace garage door and windows at the front in kind. | $20,000 |
| Feb 1, 2016 | Completed final sign-off Jan 2020 | 32 Heron St | vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom.Details
vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom. | $285,000 |