Block 3755, lot 049
32 Heron St
- City’s use
- Multi-Family Residential
- Stories
- 3
- Units
- 2
- Rooms
- 1 bedroom, 5 bathrooms
- Building
- 3,102 sq ft
- Lot
- 1,376 sq ft
- Zoning
- SLR
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2018 | Completed final sign-off Oct 2018 | 32 Heron St | Crime Watch Security Sys Llc | ref pa#3 201602018541 & 20170119778; installation of a new sprinkler monitoring system, includes facu wireless fa radio, (1) smoke detector (1) pull station and (3) monitor modulesDetails
ref pa#3 201602018541 & 20170119778; installation of a new sprinkler monitoring system, includes facu wireless fa radio, (1) smoke detector (1) pull station and (3) monitor modules | $3,500 |
| May 31, 2018 | Never finaled issued May 2018, no final | 32 Heron St | street spaceDetails
street space | ||
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 32 Heron St | street space permit - renewal of permit #m766728Details
street space permit - renewal of permit #m766728 | ||
| Mar 8, 2017 | Never finaled issued Mar 2017, no final | 32 Heron St | street spaceDetails
street space | ||
| Jan 19, 2017 | Completed final sign-off Nov 2018 | 32 Heron St | Jim Parr Dba Plumbing | install (35) new sprinklers per nfpa# 13 and underground per nfpa #24. ref. to pa#201602018541. n/a ordinance #155-13Details
install (35) new sprinklers per nfpa# 13 and underground per nfpa #24. ref. to pa#201602018541. n/a ordinance #155-13 | $12,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 32 Heron St | street spaceDetails
street space | ||
| Jun 17, 2016 | Completed final sign-off Dec 2018 | 32 Heron St | Durkin Inc. | exploratory demo to determine structural conditions in advance of bldg upgrades. scope is one small pit on each side of interior bldg. down to base of (e) foundation, to determine type, depth & width of foundation. compliance with maher ordinance 155-13 not required.Details
exploratory demo to determine structural conditions in advance of bldg upgrades. scope is one small pit on each side of interior bldg. down to base of (e) foundation, to determine type, depth & width of foundation. compliance with maher ordinance 155-13 not required. | $2,500 |
| Feb 1, 2016 | Completed final sign-off Jan 2020 | 32 Heron St | Durkin Inc. | vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom.Details
vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom. | $285,000 |
| Apr 20, 2006 | Expired or cancelled cancelled Mar 2009 | 32 Heron St | bathroom modifications, plumbing, electrical. change of occpancy from b to a-3. no structural work.Details
bathroom modifications, plumbing, electrical. change of occpancy from b to a-3. no structural work. | $35,000 | |
| May 14, 2002 | Completed final sign-off Dec 2002 | 32 Heron St | Nabi Construction & Engineering Inc | seismic retrofit of unreinforced masonry bldg as per special procedure of sfbcDetails
seismic retrofit of unreinforced masonry bldg as per special procedure of sfbc | $40,000 |
| May 11, 2001 | Expired or cancelled cancelled Mar 2004 | 32 Heron St | rev. to appl#200012077402 sumit 2 structural, 2 calculation, 2 soils/geotechnical report, 2 title 24Details
rev. to appl#200012077402 sumit 2 structural, 2 calculation, 2 soils/geotechnical report, 2 title 24 | $90,000 | |
| Dec 7, 2000 | Expired or cancelled expired Sep 2001 | 32 Heron St | 360 s,f vertical addition of mezzanine & roof deck. parking garage (263) s,f adition w/curb cut. addDetails
360 s,f vertical addition of mezzanine & roof deck. parking garage (263) s,f adition w/curb cut. add | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Durkin Inc. (2), Crime Watch Security Sys Llc, Jim Parr Dba Plumbing, Nabi Construction & Engineering Inc
- Architects
- David Ramer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.