Back to bathroom remodel contractors
Durkin Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Aug 2026
- Last 24 months
- 7 permits filed
68 permits since 2000: 48 completed, 11 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 130 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2026 | In progress issued May 2026 | 46 Saint Germain Av | new skylight and bathroom enlargement.Details
new skylight and bathroom enlargement. | $50,000 |
| Jun 28, 2024 | Completed final sign-off Jul 2024 | 3640 21st St | revision to pa# 2019-0718-6277 change in bathroom layout no additional work. change from 2 bathroom to one bathroom.Details
revision to pa# 2019-0718-6277 change in bathroom layout no additional work. change from 2 bathroom to one bathroom. | |
| Feb 26, 2024 | In progress issued Aug 2024 | 46 Saint Germain Av | interior alterations of kitchen, bedroom, bathrooms and exterior elevations alterations. relocated laundry room & expanded mech room, new office on 2/f.Details
interior alterations of kitchen, bedroom, bathrooms and exterior elevations alterations. relocated laundry room & expanded mech room, new office on 2/f. | $1,500,000 |
| Dec 19, 2017 | Completed final sign-off Aug 2018 | 2980 California St | convert (e) unconditioned attic space ot (n) conditioned as a game room. no bldg expansion. int renovation to (e) s. f. d. upgrade to electrical, plumbing & mechanical system. renovate ktichen & bathroom w/(n) fixture & finishes throughout.(n) skylights,(n) 8x8 dormer,(n) bathroom,(n) window.Details
convert (e) unconditioned attic space ot (n) conditioned as a game room. no bldg expansion. int renovation to (e) s. f. d. upgrade to electrical, plumbing & mechanical system. renovate ktichen & bathroom w/(n) fixture & finishes throughout.(n) skylights,(n) 8x8 dormer,(n) bathroom,(n) window. | $70,000 |
| Jan 19, 2017 | Completed final sign-off Jun 2017 | 2217 Pacific Av | remodel (1) kitchen & (1) bathroom in kind. new cabinets, countertop, tiles, sinks, dishwasher, vanity and toilets. replace all windows (front and back) in kind; front windows to be same size and in wood.Details
remodel (1) kitchen & (1) bathroom in kind. new cabinets, countertop, tiles, sinks, dishwasher, vanity and toilets. replace all windows (front and back) in kind; front windows to be same size and in wood. | $40,000 |
| Feb 1, 2016 | Completed final sign-off Jan 2020 | 32 Heron St | vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom.Details
vertical addition: 3rd story addition to 2 story bldg., change of use from office/storage to art studio on ground floor. 2nd flr and 3/f new dwelling unit with kitchen on 2/f. 3rd flr: roof deck, master suite and bathroom. | $285,000 |
| Jun 19, 2014 | Completed final sign-off Jun 2019 | 1350 Jones St | horizontal and vertical addition. remodel interior @ 3 levels, horizontal addition @ rear yard, vertical addition to include kitchen, dining, 1/2 bath, deck. install 4 story elevator, install total sprinler system. maher- compliance with ordinance no. 155-13. not required.Details
horizontal and vertical addition. remodel interior @ 3 levels, horizontal addition @ rear yard, vertical addition to include kitchen, dining, 1/2 bath, deck. install 4 story elevator, install total sprinler system. maher- compliance with ordinance no. 155-13. not required. | $425,000 |