Back to kitchen remodel contractors
Dowbuilt Inc.
- Based in
- Seattle
- On San Francisco permits
- Oct 2014 to Jun 2026
- Last 24 months
- 12 permits filed
44 permits since 2000: 31 completed, 7 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 13 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 2840 Broadway | reconfigeration of bathroom and kitchen. converting (e) lounge and office into pottery studio. no structural work or exterior work. interior partition , non-bearing. if any ext. sheet rock removed, to be replaced w/ 5/8" sheetrock/gyp sheathing.Details
reconfigeration of bathroom and kitchen. converting (e) lounge and office into pottery studio. no structural work or exterior work. interior partition , non-bearing. if any ext. sheet rock removed, to be replaced w/ 5/8" sheetrock/gyp sheathing. | $180,000 |
| Feb 14, 2025 | Completed final sign-off Apr 2026 | 2840 Broadway | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $100,000 |
| Aug 26, 2019 | Completed final sign-off Aug 2020 | 240 09th Av | partially remove (e) masonry chimney,install new spiral stair between 1st & 2nd fls. not a componant of egress) remove & replace (e) provider room, replace kitchen sink, faucet & counters, add closets, replace (4) windows & add (1) new window at rear of building, remove (e) gas appliance fire placeDetails
partially remove (e) masonry chimney,install new spiral stair between 1st & 2nd fls. not a componant of egress) remove & replace (e) provider room, replace kitchen sink, faucet & counters, add closets, replace (4) windows & add (1) new window at rear of building, remove (e) gas appliance fire place | $250,000 |
| Feb 19, 2016 | Expired or cancelled withdrawn May 2016 | 3248 17th St | ti - partition walls, 1 hc restroom, kitchenette with sink, dishwasher, refrig., replacement glazing, main entrance, exterior perforated metal panels, carpet, paint, conc floor finish. all mep work to be completed under seperate permit. n/a ordinance #155-13Details
ti - partition walls, 1 hc restroom, kitchenette with sink, dishwasher, refrig., replacement glazing, main entrance, exterior perforated metal panels, carpet, paint, conc floor finish. all mep work to be completed under seperate permit. n/a ordinance #155-13 | $50,000 |
| Oct 22, 2014 | Completed final sign-off Dec 2023 | 660 Sanchez St | full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building.Details
full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building. | $930,000 |