Back to bathroom remodel contractors
Dowbuilt Inc.
- Based in
- Seattle
- On San Francisco permits
- Oct 2014 to Jun 2026
- Last 24 months
- 12 permits filed
44 permits since 2000: 31 completed, 7 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 16 days from filing to permit and 601 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2025 | In progress issued Oct 2025 | 490 Avila St | revision to pa # 2022-921-2892 & 2025-0124-9064: revise layout of primary suite and bathroom. revise steps into main level living room. no plumbing fixtures.Details
revision to pa # 2022-921-2892 & 2025-0124-9064: revise layout of primary suite and bathroom. revise steps into main level living room. no plumbing fixtures. | |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 2840 Broadway | reconfigeration of bathroom and kitchen. converting (e) lounge and office into pottery studio. no structural work or exterior work. interior partition , non-bearing. if any ext. sheet rock removed, to be replaced w/ 5/8" sheetrock/gyp sheathing.Details
reconfigeration of bathroom and kitchen. converting (e) lounge and office into pottery studio. no structural work or exterior work. interior partition , non-bearing. if any ext. sheet rock removed, to be replaced w/ 5/8" sheetrock/gyp sheathing. | $180,000 |
| Feb 14, 2025 | Completed final sign-off Apr 2026 | 2840 Broadway | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $100,000 |
| Jun 17, 2019 | Completed final sign-off Aug 2021 | 2500 Steiner St | apt #5: renovation of an extg apartment within the highrise residential bldg. nw interior partition walls to be provided for nw bathrooms, 2 additional bedrooms, a study, and louge area. nw finishes and fixtures throughout. new window to match (e) wood double hung windows.Details
apt #5: renovation of an extg apartment within the highrise residential bldg. nw interior partition walls to be provided for nw bathrooms, 2 additional bedrooms, a study, and louge area. nw finishes and fixtures throughout. new window to match (e) wood double hung windows. | $837,002 |
| Oct 22, 2014 | Completed final sign-off Dec 2023 | 660 Sanchez St | full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building.Details
full exterior & interior remodel, including bathrooms & kitchen excavation for garage & utiities/storage addition at rear of building. | $930,000 |