44 permits since 2000: 31 completed, 7 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 36 days from filing to permit and 1068 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2021 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detailDetails
structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detail | |
| Jun 26, 2019 | Completed final sign-off May 2022 | 2740 Green St | revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maherDetails
revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maher |