Block 2721, lot 016
100 Palo Alto Ave
- City’s use
- Single Family Residential
- Built
- 1952
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 5,177 sq ft
- Lot
- 5,000 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2025 | Completed final sign-off Feb 2025 | 100 Palo Alto Av | Dowbuilt Inc. | to obtain final inspection for work approved under pa# 9824708. all work is complete.Details
to obtain final inspection for work approved under pa# 9824708. all work is complete. | |
| Aug 21, 2024 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | as built revision to bpa# 201604296200, 202108045817, 202212057648: revision to t24 report. revision to remove battery system from underground bunker.Details
as built revision to bpa# 201604296200, 202108045817, 202212057648: revision to t24 report. revision to remove battery system from underground bunker. | |
| Apr 13, 2023 | Completed final sign-off Feb 2024 | 100 Palo Alto Av | Dowbuilt Inc. | to obtain final inspection for work approved under pa# 201711214543 & 201709137870. all work is complete.Details
to obtain final inspection for work approved under pa# 201711214543 & 201709137870. all work is complete. | |
| Dec 5, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | full subgrade enclosure for battery storage in rear yard. tesla solar roof & battery storage( >20 kw/h)Details
full subgrade enclosure for battery storage in rear yard. tesla solar roof & battery storage( >20 kw/h) | $100,000 |
| Nov 3, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | revision to pa 202010307876 renovation of (e) exterior front courtyard of an existing single family dwelling.no change or constructoin to building envelope. for landscape/hardscape onlyDetails
revision to pa 202010307876 renovation of (e) exterior front courtyard of an existing single family dwelling.no change or constructoin to building envelope. for landscape/hardscape only | $1,000 |
| Sep 13, 2022 | Completed final sign-off Nov 2024 | 100 Palo Alto Av | Control Fire Inc. | 2" underground piping 56 feet, underground work. ref app#202207198775 for sprinkler.includes revision to approved sprinkler permit202207198775Details
2" underground piping 56 feet, underground work. ref app#202207198775 for sprinkler.includes revision to approved sprinkler permit202207198775 | |
| Aug 26, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | revision to 202204122047 demo demo planters and brick wall build (n) concrete wall in driveway.Details
revision to 202204122047 demo demo planters and brick wall build (n) concrete wall in driveway. | |
| Jul 19, 2022 | Completed final sign-off Feb 2025 | 100 Palo Alto Av | Control Fire Inc. | sprinklers to be installed in entire structure per approved permit 202204122047. work includes fire only service back flow... 2" underground under seperate permit.Details
sprinklers to be installed in entire structure per approved permit 202204122047. work includes fire only service back flow... 2" underground under seperate permit. | $31,695 |
| May 25, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | revision to pa# 202204122047 & 201604296200. changes include revised design for exterior stairs in side yard. not visible from street.Details
revision to pa# 202204122047 & 201604296200. changes include revised design for exterior stairs in side yard. not visible from street. | |
| Apr 12, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. revise exterior finish at siding. revise interior doors. stair reconfiguration. window heights revised at 3 locations. tesla solar roof on deferred permit submittal.Details
revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. revise exterior finish at siding. revise interior doors. stair reconfiguration. window heights revised at 3 locations. tesla solar roof on deferred permit submittal. | $20,000 |
| Dec 7, 2021 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detailDetails
structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detail | |
| Aug 4, 2021 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. work includes changes to interior layout, new stairs, new trash enclosure. reconfigure exterior window openings. new skylights. new roofing finishes.Details
revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. work includes changes to interior layout, new stairs, new trash enclosure. reconfigure exterior window openings. new skylights. new roofing finishes. | $50,000 |
| Oct 30, 2020 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | remove & replace (e) front entry door & (e) sliding glass doors. rebuild (e) stairs at front yard. (n) stone pavers over (e) concrete patio. (n) bb q counter. window infill at front facade. (n) garage door. (n) stone pavers at driveway & entry walkway.Details
remove & replace (e) front entry door & (e) sliding glass doors. rebuild (e) stairs at front yard. (n) stone pavers over (e) concrete patio. (n) bb q counter. window infill at front facade. (n) garage door. (n) stone pavers at driveway & entry walkway. | $30,000 |
| Mar 2, 2020 | Completed final sign-off Feb 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to app#201604296200, 201709137870, & 201711214543 to incorporate minor interior and structural changes. no exterior work.Details
revision to app#201604296200, 201709137870, & 201711214543 to incorporate minor interior and structural changes. no exterior work. | |
| Jan 27, 2020 | Never finaled issued Jan 2020, no final | 100 Palo Alto Av | street spaceDetails
street space | ||
| May 7, 2019 | Completed final sign-off May 2019 | 100 Palo Alto Av | Sun Roofing & Constr. Company, Inc. | reroofingDetails
reroofing | $15,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 100 Palo Alto Av | street spaceDetails
street space | ||
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 100 Palo Alto Av | street spaceDetails
street space | ||
| Nov 21, 2017 | Expired or cancelled expired Feb 2024 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to app#201604296200. addition of moment frame at rear yard wall. window configuration change. stair change to retangular stair. (previous submittal circular)Details
revision to app#201604296200. addition of moment frame at rear yard wall. window configuration change. stair change to retangular stair. (previous submittal circular) | $10,000 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 100 Palo Alto Av | street spaceDetails
street space | ||
| Sep 13, 2017 | Expired or cancelled expired Feb 2024 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to #201604296200. relocate 1 hr wall at garage - reconfigure layout of 2nd fl. demo diagram- minor changes to structural as noted foundation, 1st fl framing - 2nd fl lower roof.Details
revision to #201604296200. relocate 1 hr wall at garage - reconfigure layout of 2nd fl. demo diagram- minor changes to structural as noted foundation, 1st fl framing - 2nd fl lower roof. | |
| Apr 29, 2016 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | lower finished floor level at 1st story to increase ceiling hgt.reframe ceiling at living rm/master bedrm.n/elptical stair fr 1st/2ndstory.remodel & reconfigure internal spaces on 1st & 2nd.replace(e)single pane wndw w/double pane.replace wndws in kind at front facade.no changes to footprint/sq. ftgDetails
lower finished floor level at 1st story to increase ceiling hgt.reframe ceiling at living rm/master bedrm.n/elptical stair fr 1st/2ndstory.remodel & reconfigure internal spaces on 1st & 2nd.replace(e)single pane wndw w/double pane.replace wndws in kind at front facade.no changes to footprint/sq. ftg | $800,000 |
| Apr 29, 2016 | Never finaled issued Apr 2016, no final | 100 Palo Alto Av | Dowbuilt Inc. | to obtain final inspection for work approved under pa # 9824708. all work is complete.Details
to obtain final inspection for work approved under pa # 9824708. all work is complete. |