Back to bathroom remodel contractors
Douglas Gower Dba Mesa Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 10 permits filed
104 permits since 2000: 80 completed, 6 in progress, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 318 Chestnut St | unit # 318: kitchen and bathroom remodel like for like, top floor. new drywall in (e) rear living room due to water damage. keep 1hr fire rating @ all penetrations to horizontal separation between dwellings.Details
unit # 318: kitchen and bathroom remodel like for like, top floor. new drywall in (e) rear living room due to water damage. keep 1hr fire rating @ all penetrations to horizontal separation between dwellings. | $20,300 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 2257 Green St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 1226 08th Av | in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s). | $15,000 |
| May 13, 2022 | Completed final sign-off Feb 2023 | 1274 Guerrero St | interior remodel of 2/f bathroom / hallway. remodel of 3/f primary bedroom & bathroom.Details
interior remodel of 2/f bathroom / hallway. remodel of 3/f primary bedroom & bathroom. | $60,000 |
| Oct 27, 2020 | Completed final sign-off Apr 2021 | 2891 Jackson St | renovation of (3) (e) bathrooms, new fixturs, tile in 2 bathrooms, (e) powder room, renovation of (e) kitchen. new cabinets, plumbing & electrical fixtures, countertops, no strutural work. no work visible from street.Details
renovation of (3) (e) bathrooms, new fixturs, tile in 2 bathrooms, (e) powder room, renovation of (e) kitchen. new cabinets, plumbing & electrical fixtures, countertops, no strutural work. no work visible from street. | $35,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 1426 47th Av | remove of existing bathroom, replace tub with shower, reuse (e) toilet, new tile, plumbing fixtures. no structural work or changes.Details
remove of existing bathroom, replace tub with shower, reuse (e) toilet, new tile, plumbing fixtures. no structural work or changes. | $10,200 |
| Aug 31, 2016 | Expired or cancelled expired Jul 2018 | 1150 Sacramento St | unit# 603 kitchen & bathroom remodel. no structural work to be done. n/a for maher.Details
unit# 603 kitchen & bathroom remodel. no structural work to be done. n/a for maher. | $49,400 |
| May 19, 2015 | Completed final sign-off Oct 2015 | 3222 Jackson St | 2nd flr: remodel (e) south bath, change out (e) tub to shower, replace lav fixtures, toilet to 1.28 gpf. replce tile, drywall trim as necessary. no structural changes or work. maher naDetails
2nd flr: remodel (e) south bath, change out (e) tub to shower, replace lav fixtures, toilet to 1.28 gpf. replce tile, drywall trim as necessary. no structural changes or work. maher na | $7,500 |
| May 19, 2015 | Completed final sign-off Feb 2016 | 1150 Sacramento St | replace (e) tile floors in entry, living rm/dining, kitchen w/ (n) hardwood flrs over floating subfloor. entry to receive new tile, all other spaces except (e) bathrooms to receive new hardwood. add recessed led lighting to master bathrm. repair ceiling in master bath. replace 2 (e) toilets w/ 1.28Details
replace (e) tile floors in entry, living rm/dining, kitchen w/ (n) hardwood flrs over floating subfloor. entry to receive new tile, all other spaces except (e) bathrooms to receive new hardwood. add recessed led lighting to master bathrm. repair ceiling in master bath. replace 2 (e) toilets w/ 1.28 | $15,000 |
| May 19, 2014 | Completed final sign-off Jan 2015 | 650 Delancey St | remodel kitchen and bathroom on first floor. relocate the bathroom door per plan. remove non-bearing wall per plan. remodel 2nd floor bathroom. maher ordinance # 155-13 n/a.Details
remodel kitchen and bathroom on first floor. relocate the bathroom door per plan. remove non-bearing wall per plan. remodel 2nd floor bathroom. maher ordinance # 155-13 n/a. | $25,000 |
| Oct 7, 2013 | Completed final sign-off Nov 2013 | 1444 Pacific Av | repair, remodel existing bath in unit #6, new tub, toilet, electrical fixture to be replaced. vacancy sensor installed. new tile on floor wall. lighting to comply with cec 150(k)Details
repair, remodel existing bath in unit #6, new tub, toilet, electrical fixture to be replaced. vacancy sensor installed. new tile on floor wall. lighting to comply with cec 150(k) | $3,800 |
| May 11, 2012 | Completed final sign-off Feb 2013 | 3683 Sacramento St | remove wall on 2nd fl and replce with ceiling beam. renovate e bathroom. renovate kitchen, add 2 skylights, new washer/dryer.Details
remove wall on 2nd fl and replce with ceiling beam. renovate e bathroom. renovate kitchen, add 2 skylights, new washer/dryer. | $35,000 |
| Mar 21, 2011 | Completed final sign-off May 2011 | 650 Delancey St | upper 1 level bath & closet remodel - non structural cosmetic remodel, replace existing lav, lav fixtures, replace tub/shower with shower, new vanity, new tile, new closset handing/shelving layout. light to comply with cec 150(k) no change to door or window.Details
upper 1 level bath & closet remodel - non structural cosmetic remodel, replace existing lav, lav fixtures, replace tub/shower with shower, new vanity, new tile, new closset handing/shelving layout. light to comply with cec 150(k) no change to door or window. | $9,500 |
| Jul 15, 2009 | Completed final sign-off Jun 2010 | 3222 Jackson St | chg out 3 (e)windows same width in rear yd.comestic non structural remocal 2 (e)adjoining bathrms, infill doorway&infill adjoining shower entry to indivicuate bathrms.add new shower to (e) bath, chg out tub,expand bath/dressing area into (e) laundry area by remov door.new tile each bath/shower......Details
chg out 3 (e)windows same width in rear yd.comestic non structural remocal 2 (e)adjoining bathrms, infill doorway&infill adjoining shower entry to indivicuate bathrms.add new shower to (e) bath, chg out tub,expand bath/dressing area into (e) laundry area by remov door.new tile each bath/shower...... | $27,000 |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 1150 Sacramento St | work @ unit# 601 & # 602 only. remodel of kitchen & master bath. re-use (e) appliances (except referg), new fixtures in same locations. cosmetic remodel with no changes in room configurations. 50% wattage of kitchen lighting to be fluorescant. bathrm lighting to be fluorescant or on occupant sensor.Details
work @ unit# 601 & # 602 only. remodel of kitchen & master bath. re-use (e) appliances (except referg), new fixtures in same locations. cosmetic remodel with no changes in room configurations. 50% wattage of kitchen lighting to be fluorescant. bathrm lighting to be fluorescant or on occupant sensor. | $18,000 |
| Jan 18, 2006 | Completed final sign-off Apr 2006 | 164 Avila St | remodel of (e) bathroom, removing (e) tub / shower & replacing with showers. new fixtures, new tile, vanity. add closet in master bedroom adjacent to (e) closet, by expanding into (e) pantry space on kitchen side. no structural changes, work within (e) space.Details
remodel of (e) bathroom, removing (e) tub / shower & replacing with showers. new fixtures, new tile, vanity. add closet in master bedroom adjacent to (e) closet, by expanding into (e) pantry space on kitchen side. no structural changes, work within (e) space. | $4,500 |
| May 16, 2005 | Expired or cancelled expired Jun 2006 | 650 Delancey St | upper level bath remodel.non structural cosmetic remodel replacing (e)lav,tub,toilet with new fixturDetails
upper level bath remodel.non structural cosmetic remodel replacing (e)lav,tub,toilet with new fixtur | $7,500 |
| Nov 9, 2000 | Completed final sign-off Feb 2001 | 1070 Treat Av | remodel existing bathDetails
remodel existing bath | $4,500 |
| Sep 1, 2000 | Completed final sign-off Feb 2001 | 110 San Felipe Av | rmdl ex kitch bath no struct rmv e nonbear clostwall reframe for frig rplce e appl/fix rmv nonbear pDetails
rmdl ex kitch bath no struct rmv e nonbear clostwall reframe for frig rplce e appl/fix rmv nonbear p | $35,000 |
| Aug 2, 2000 | Completed final sign-off Sep 2001 | 1415 Indiana St | remodel existing mezzanine bathroom changing tub and showerDetails
remodel existing mezzanine bathroom changing tub and shower | $2,500 |