Douglas Gower Dba Mesa Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 10 permits filed
104 permits since 2000: 80 completed, 6 in progress, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 2 never finaled. Typically 7 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 314 Chestnut St | revision to 202510278163. framing modifications due to constraints of existing lightwell to reconstruct exterior egress stairDetails
revision to 202510278163. framing modifications due to constraints of existing lightwell to reconstruct exterior egress stair | |
| Oct 27, 2025 | Completed final sign-off Sep 2026 | 314 Chestnut St | reconstruct (e) 4 story east lightwell egress stair in-kind; replace all wood framing & foundations; comply with section 604 item 2 of sf housing code nov 201580623Details
reconstruct (e) 4 story east lightwell egress stair in-kind; replace all wood framing & foundations; comply with section 604 item 2 of sf housing code nov 201580623 | $21,000 |
| Apr 4, 2024 | Completed final sign-off Oct 2024 | 16 College Tr | nov 202317484- vechile damamge- repair and replace front entry stair, landing and garage door in kind. no interior work, no change to facade.Details
nov 202317484- vechile damamge- repair and replace front entry stair, landing and garage door in kind. no interior work, no change to facade. | $25,000 |
| Dec 30, 2019 | Never finaled issued Dec 2020, no final | 316 Chestnut St | interior renovation of unit #316 and 318(no work at basement). new roof details including parapet set back 15+ feet. new windows throughout, with wood replacement windows in front. repair extg exterior stair in kind. seismic upgrades.Details
interior renovation of unit #316 and 318(no work at basement). new roof details including parapet set back 15+ feet. new windows throughout, with wood replacement windows in front. repair extg exterior stair in kind. seismic upgrades. | $450,000 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 1150 Sacramento St | unit 101: 2 story interior renovation. relocate (e) interior stair. relocate entry door at lower level elevator lobby. upgrade fixtures, finishes and fitting througout unit. partial rewiring and new plumibng in selected areas. maher naDetails
unit 101: 2 story interior renovation. relocate (e) interior stair. relocate entry door at lower level elevator lobby. upgrade fixtures, finishes and fitting througout unit. partial rewiring and new plumibng in selected areas. maher na | $175,000 |
| Aug 8, 2013 | Completed final sign-off Aug 2015 | 1535 Oak St | (rear bldg)covert/legal(e)struc currently permitted as a garage into(1)res'd unit.add a new stairwy.new stair enclosure&(n)roof deck incl 1-hr rated guardrail along the prop line, new steel cable guardrails. new res'd unit to be fully sprinkler under sep permit.frt bldg see 2014-0411-3016.Details
(rear bldg)covert/legal(e)struc currently permitted as a garage into(1)res'd unit.add a new stairwy.new stair enclosure&(n)roof deck incl 1-hr rated guardrail along the prop line, new steel cable guardrails. new res'd unit to be fully sprinkler under sep permit.frt bldg see 2014-0411-3016. | $100,000 |
| Jun 28, 2012 | Completed final sign-off Mar 2013 | 1334 45th Av | replace (e) front entry stair. replace front brick facade with wood sidingDetails
replace (e) front entry stair. replace front brick facade with wood siding | $10,000 |
| Feb 5, 2008 | Completed final sign-off Apr 2008 | 156 27th Av | front entry stairs and landing to be replaced in kind with new conforming hand rail and guard rails. replace ex. garage door.Details
front entry stairs and landing to be replaced in kind with new conforming hand rail and guard rails. replace ex. garage door. | $5,600 |
| Aug 20, 2004 | Never finaled issued Aug 2004, no final | 437 Liberty St | revision to apprvd app 200305295776-interior revision to room & stair location; delete window; strucDetails
revision to apprvd app 200305295776-interior revision to room & stair location; delete window; struc |