Block 0154, lot 014
1448 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 11
- Rooms
- 12 bathrooms
- Building
- 6,288 sq ft
- Lot
- 2,339 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2026 | In progress issued Jul 2026 | 1448 Pacific Av | Don Rene Alvarado General Construction | comply w/ nov #, 202541740, new waiter station - bar counter.Details
comply w/ nov #, 202541740, new waiter station - bar counter. | $2,000 |
| Aug 22, 2025 | In progress issued Aug 2025 | 1444 Pacific Av | unit #7 remodel in kind of bathroom and kitchen. new electrical and plumbing throughout. add insulation where missing or requires replacement.Details
unit #7 remodel in kind of bathroom and kitchen. new electrical and plumbing throughout. add insulation where missing or requires replacement. | $25,000 | |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 1444 Pacific Av | A M Rocca Inc. | replace (14) front windows with wood windows. (double hung) u=0.3 maxDetails
replace (14) front windows with wood windows. (double hung) u=0.3 max | $13,000 |
| Oct 11, 2022 | Completed final sign-off Feb 2023 | 1444 Pacific Av | A M Rocca Inc. | remove and replace dryrot at front bays. all repairs in-kind.Details
remove and replace dryrot at front bays. all repairs in-kind. | $15,000 |
| Dec 7, 2015 | Never finaled issued Jan 2016, no final | 1448 Pacific Av | A M Rocca Inc. | soft story upgrade per appendix a-4. accessible mitigation to restroom. n/a for maherDetails
soft story upgrade per appendix a-4. accessible mitigation to restroom. n/a for maher | $6,000 |
| Dec 7, 2015 | Completed final sign-off Jul 2016 | 1444 Pacific Av | A M Rocca Inc. | soft story upgrade per appendix a-4. construct footing, shearwall, framing approx. 12lf. n/a for maherDetails
soft story upgrade per appendix a-4. construct footing, shearwall, framing approx. 12lf. n/a for maher | $45,000 |
| Oct 7, 2013 | Completed final sign-off Nov 2013 | 1444 Pacific Av | Douglas Gower Dba Mesa Construction | repair, remodel existing bath in unit #6, new tub, toilet, electrical fixture to be replaced. vacancy sensor installed. new tile on floor wall. lighting to comply with cec 150(k)Details
repair, remodel existing bath in unit #6, new tub, toilet, electrical fixture to be replaced. vacancy sensor installed. new tile on floor wall. lighting to comply with cec 150(k) | $3,800 |
| Dec 17, 2009 | Completed final sign-off Feb 2010 | 1448 Pacific Av | Priority Architectural Graphics Dba Prio | on (e) awning add individual lettering "ristorante milano".Details
on (e) awning add individual lettering "ristorante milano". | $8,000 |
| Nov 3, 2009 | Expired or cancelled cancelled Jan 2026 | 1448 Pacific Av | "ristorante milano" - painted copy of sign to awning (awning under separate permit).Details
"ristorante milano" - painted copy of sign to awning (awning under separate permit). | $500 | |
| Nov 3, 2009 | Completed final sign-off Dec 2009 | 1448 Pacific Av | International Commercial Awning, Inc. | installation of a wrap around corner awning 4' x 25' x 3'6" and 2' x 7'2" x 3'6"Details
installation of a wrap around corner awning 4' x 25' x 3'6" and 2' x 7'2" x 3'6" | $5,000 |
| Sep 8, 2009 | Never finaled issued Sep 2009, no final | 1446 Pacific Av | street spaceDetails
street space | ||
| Feb 5, 2009 | Never finaled issued Feb 2009, no final | 1448 Pacific Av | Fire Sentry Protection Services | upgrade fire system (ansul) in kitchen exhaust hood to ul 300 code in restaurantDetails
upgrade fire system (ansul) in kitchen exhaust hood to ul 300 code in restaurant | $3,605 |
| Mar 31, 2008 | Completed final sign-off May 2008 | 1444 Pacific Av | A M Rocca Inc. | work @ unit# 10 only. remove (e) tile & replace with new tile. area of working is in the bathroom tile work is around tub on bathroom floor approx 100 sq. ft. remove lathep & plaster install sheetrock 5/8 at kitchen, remove & replace kitchen cabinets (no structural work)Details
work @ unit# 10 only. remove (e) tile & replace with new tile. area of working is in the bathroom tile work is around tub on bathroom floor approx 100 sq. ft. remove lathep & plaster install sheetrock 5/8 at kitchen, remove & replace kitchen cabinets (no structural work) | $14,500 |
| Oct 25, 2007 | Completed final sign-off Jan 2008 | 1444 Pacific Av | A M Rocca Inc. | remove (e) tile & replace with new tile. area of working is in the bathroom tile work is around tub on bathroom floor approx 100 sq. ft. remove lather & plaster. install sheetrock 5/8 at kitchen. remove & replace kitchen cabinets. no structural work. new lighting to be high efficiency.Details
remove (e) tile & replace with new tile. area of working is in the bathroom tile work is around tub on bathroom floor approx 100 sq. ft. remove lather & plaster. install sheetrock 5/8 at kitchen. remove & replace kitchen cabinets. no structural work. new lighting to be high efficiency. | $8,500 |
| Sep 12, 2007 | Completed final sign-off Sep 2007 | 1444 Pacific Av | A M Rocca Inc. | install foundation bolts 1/2 bots at 32" edoxy min 7" embedment 100ft approxDetails
install foundation bolts 1/2 bots at 32" edoxy min 7" embedment 100ft approx | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A M Rocca Inc. (7), Don Rene Alvarado General Construction, Douglas Gower Dba Mesa Construction, Fire Sentry Protection Services, International Commercial Awning, Inc., Priority Architectural Graphics Dba Prio
- Designers
- Suheil Shatara
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.