Back to bathroom remodel contractors
Doran Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Sep 2026
- Last 24 months
- 13 permits filed
146 permits since 2000: 105 completed, 13 in progress, 13 never finaled, 15 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 26 completed, 4 in progress, 3 never finaled, 6 expired or cancelled. Typically 84 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2025 | Completed final sign-off Sep 2026 | 2555 Green St | create new 1/2 bath at existing storage room at landing between first and 2nd floor. 2nd floor: remove wardrobe at bedroom #3. remove closets bedroom #2. add built in cabinets and wetbar at bedroom #2. replace interior doors in kind at 2nd floor. no exterior work, no structural work.Details
create new 1/2 bath at existing storage room at landing between first and 2nd floor. 2nd floor: remove wardrobe at bedroom #3. remove closets bedroom #2. add built in cabinets and wetbar at bedroom #2. replace interior doors in kind at 2nd floor. no exterior work, no structural work. | $53,000 |
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Jul 25, 2025 | In progress issued Aug 2025 | 4121 20th St | revision to pa #202308235085 and 202406063893. convert approved basement gym to home office and construct new basement bathroom. relocate kitchen at 2nd floor. remove full bathroom at 2nd fl. and new bathroom at 3rd f. move primary bathroom at 3rd floor.Details
revision to pa #202308235085 and 202406063893. convert approved basement gym to home office and construct new basement bathroom. relocate kitchen at 2nd floor. remove full bathroom at 2nd fl. and new bathroom at 3rd f. move primary bathroom at 3rd floor. | $20,000 |
| Mar 7, 2025 | In progress issued Jul 2025 | 87 Hernandez Av | remodel the (e) 1st fl to habitable spaces to include a bedroom, bath, media room, and laundry room. new concrete slab and partial foundation replacement at 1st floor. remodel the existing 2nd floor kitchen, bathroom, and powder room. widen the existing garage door.Details
remodel the (e) 1st fl to habitable spaces to include a bedroom, bath, media room, and laundry room. new concrete slab and partial foundation replacement at 1st floor. remodel the existing 2nd floor kitchen, bathroom, and powder room. widen the existing garage door. | $355,000 |
| Jan 23, 2025 | Expired or cancelled withdrawn Oct 2025 | 82 Woodward St | 1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system.Details
1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system. | $85,000 |
| Jan 20, 2025 | In progress issued Jun 2025 | 573 Diamond St | revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope)Details
revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope) | |
| Jan 29, 2024 | Completed final sign-off Sep 2025 | 71 Bradford St | remodel existing sfd. at 1/f: create (n) bedroom, 2 bathrooms, home office/den, (n) interior stair connection to 2/f; at 2/f: create (n) open kitchen, relocate bedroom, (n) media room, (n) bathroom, (n) attic access; install (n) windows, doors, exterior siding and roofing.Details
remodel existing sfd. at 1/f: create (n) bedroom, 2 bathrooms, home office/den, (n) interior stair connection to 2/f; at 2/f: create (n) open kitchen, relocate bedroom, (n) media room, (n) bathroom, (n) attic access; install (n) windows, doors, exterior siding and roofing. | $325,000 |
| Oct 25, 2023 | Completed final sign-off Jan 2025 | 564 29th Av | revision to bpa#201907115588, shift bathroom location g/f, create (n) attic access, (n) windows/skylights/rooftop dormers, replace entry stair, widen garage door, remove/replace site/landscaping walls @ front yard.Details
revision to bpa#201907115588, shift bathroom location g/f, create (n) attic access, (n) windows/skylights/rooftop dormers, replace entry stair, widen garage door, remove/replace site/landscaping walls @ front yard. | $16,000 |
| Jul 21, 2023 | Completed final sign-off Apr 2024 | 573 Diamond St | +1st fl drywall at north property line and rear of home to assess water infiltration from multiple sources. replace pl drywall w 5/8" type x gyp. 1st fl in kind bath remodel. no wall changes.Details
+1st fl drywall at north property line and rear of home to assess water infiltration from multiple sources. replace pl drywall w 5/8" type x gyp. 1st fl in kind bath remodel. no wall changes. | $17,000 |
| May 17, 2023 | In progress issued Jan 2025 | 91 Coleridge St | front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of buildingDetails
front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of building | $50,000 |
| Aug 17, 2022 | Expired or cancelled expired Feb 2026 | 734 Dolores St | rev to pa202002265511: relocate attic bathroom and windows.Details
rev to pa202002265511: relocate attic bathroom and windows. | $20,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2023 | 28 Atalaya Tr | convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street.Details
convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street. | $100,000 |
| Oct 21, 2021 | Completed final sign-off Feb 2025 | 4751 25th St | horizontal extension to existing single family home. build new extension on first floor 12' deep. create new bedroom, family room, bathroom, gy and wetbar on first floor. create new dexk above extension, accessed via new glass doors on 2nd floor. no work visible from street.Details
horizontal extension to existing single family home. build new extension on first floor 12' deep. create new bedroom, family room, bathroom, gy and wetbar on first floor. create new dexk above extension, accessed via new glass doors on 2nd floor. no work visible from street. | $148,000 |
| Feb 3, 2021 | Completed final sign-off May 2023 | 543 09th Av | convert bastment to living space. new office, entertainment room & bathroom. upgrade stair connection to 1st fl. 1st fl remodel kitchen, relocate powder room, new dining area with sliding doors to rear deck. 2nd fl remodel bath & bedrooms, add bath & laundry room. new stair to attic & remodel attic.Details
convert bastment to living space. new office, entertainment room & bathroom. upgrade stair connection to 1st fl. 1st fl remodel kitchen, relocate powder room, new dining area with sliding doors to rear deck. 2nd fl remodel bath & bedrooms, add bath & laundry room. new stair to attic & remodel attic. | $278,000 |
| Jul 14, 2020 | Completed final sign-off May 2021 | 160 Marston Av | revision to pa #201809190777. remodel 1st fl bathroom, (n) fireplace at living room 1st fl, (n) relocation kitchen 1st floor, relocate bar to family room 1st fl,layout change to master bath at 2nd fl, (n) hydronic heat system, window replacement at front facade.Details
revision to pa #201809190777. remodel 1st fl bathroom, (n) fireplace at living room 1st fl, (n) relocation kitchen 1st floor, relocate bar to family room 1st fl,layout change to master bath at 2nd fl, (n) hydronic heat system, window replacement at front facade. | $27,000 |
| Feb 26, 2020 | Expired or cancelled expired Feb 2026 | 734 Dolores St | remodel of (e) attic into (2) bedrooms & (2) bathrooms. (n) windows & flat skylight @ attic. to accomplish this the roof shape will be modified, while staying within the (e) ridge height.Details
remodel of (e) attic into (2) bedrooms & (2) bathrooms. (n) windows & flat skylight @ attic. to accomplish this the roof shape will be modified, while staying within the (e) ridge height. | $300,000 |
| Aug 29, 2019 | Never finaled issued Mar 2023, no final | 573 Diamond St | rear horizontal & vertical addition. 1st fl:remoddel bed & bath, 2nd floor kitchen, dining, living & bath remodel. 3rd floor: master bed & bath remodel. 4th floor; penthouse addiiton.Details
rear horizontal & vertical addition. 1st fl:remoddel bed & bath, 2nd floor kitchen, dining, living & bath remodel. 3rd floor: master bed & bath remodel. 4th floor; penthouse addiiton. | $500,000 |
| Jul 11, 2019 | Completed final sign-off Jan 2025 | 564 29th Av | create (n) addition @ 3rd flr over (e) 2-story portion of bldg. raise (e) roof eaves @ back of house. reconfigure 3rd flr to create (n) bathroom & storage space. (n) deck over portion of (e) 2nd flr.Details
create (n) addition @ 3rd flr over (e) 2-story portion of bldg. raise (e) roof eaves @ back of house. reconfigure 3rd flr to create (n) bathroom & storage space. (n) deck over portion of (e) 2nd flr. | $85,000 |
| Sep 19, 2018 | Completed final sign-off May 2021 | 160 Marston Av | addition towards backyard @ 1st & 2nd floor,infill towards front @ 2nd floor, new kitchen island, new bathroom @ 2nd floor, new stair between 1st & 2nd floor, new skylightsDetails
addition towards backyard @ 1st & 2nd floor,infill towards front @ 2nd floor, new kitchen island, new bathroom @ 2nd floor, new stair between 1st & 2nd floor, new skylights | $50,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2020 | 657 16th Av | 2-story rear addition w/ internal stair connecting spaces. (n) bdrm, bath, laundry & closet spaces on 1st flr. (n) family rm, half bath & kitchen pantry on 2nd flr.Details
2-story rear addition w/ internal stair connecting spaces. (n) bdrm, bath, laundry & closet spaces on 1st flr. (n) family rm, half bath & kitchen pantry on 2nd flr. | $85,000 |
| Aug 2, 2017 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sepDetails
convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sep | $230,000 |
| Jun 20, 2017 | Completed final sign-off Feb 2018 | 59 Saint Germain Av | 2/f -renovation of (e) master bathroom including new finishes, fixture, cabinetry, etc. install new window in master bathroom (no visible from the street), renovation of (e) bathroom 2 - renove (e) tub & construct (n) walk-in shower with temp glass door & panel.Details
2/f -renovation of (e) master bathroom including new finishes, fixture, cabinetry, etc. install new window in master bathroom (no visible from the street), renovation of (e) bathroom 2 - renove (e) tub & construct (n) walk-in shower with temp glass door & panel. | $38,365 |
| Jan 17, 2017 | Expired or cancelled cancelled Apr 2019 | 3806 22nd St | add new bathroom and reconfigure non structural partitions at l3, third floor interior work only.Details
add new bathroom and reconfigure non structural partitions at l3, third floor interior work only. | $25,000 |
| Sep 8, 2015 | Completed final sign-off Aug 2019 | 4618 19th St | renovate & addition to(e)single family home. 1st fl: change storage space to living space,(2)(n)bedrms, family rm, bath & laundry. 2nd fl:(n)staircase, kitchen, living spaces, powder rm, deck. 3rd fl: renovate master bedrm, (n)bedrm & bath. rear expansion each level,(n)terrace,garage structDetails
renovate & addition to(e)single family home. 1st fl: change storage space to living space,(2)(n)bedrms, family rm, bath & laundry. 2nd fl:(n)staircase, kitchen, living spaces, powder rm, deck. 3rd fl: renovate master bedrm, (n)bedrm & bath. rear expansion each level,(n)terrace,garage struct | $319,000 |
| Jan 7, 2015 | Expired or cancelled withdrawn May 2017 | 46 Saint Germain Av | revisions to work under permit appn. 201310300660; interior work only, reconfigure bathroom area, reconfigure stair between basement and 1st flr.Details
revisions to work under permit appn. 201310300660; interior work only, reconfigure bathroom area, reconfigure stair between basement and 1st flr. | |
| Jun 20, 2014 | Completed final sign-off May 2015 | 3701 Clay St | construction of new stairway (exterior), replace existing. demo and reconfigure partiton walls, kitchen remodel, bath remodelDetails
construction of new stairway (exterior), replace existing. demo and reconfigure partiton walls, kitchen remodel, bath remodel | $165,000 |
| Apr 17, 2014 | Completed final sign-off Nov 2014 | 429 Noe St | remove e bearing wall between kitchen and living room. relocate kitchen fixture and cabinets. remodel e bath including new floor and wall tile, tub, and vanityDetails
remove e bearing wall between kitchen and living room. relocate kitchen fixture and cabinets. remodel e bath including new floor and wall tile, tub, and vanity | $20,000 |
| Apr 8, 2014 | Never finaled issued Apr 2014, no final | 46 Saint Germain Av | convert gym space at basement to bedroom with new onsuite bathroom. gym other basement space approved with app#201310300660. extg window and serve as egress. basement space visullay open to all floors above. no exterior work.Details
convert gym space at basement to bedroom with new onsuite bathroom. gym other basement space approved with app#201310300660. extg window and serve as egress. basement space visullay open to all floors above. no exterior work. | $18,000 |
| Mar 12, 2014 | Completed final sign-off May 2016 | 155 Buchanan St | reconfigure existing unit layouts, new kitchens and baths. exterior work includes new front entry sequence, new garage doors, new rear egress stair and fire wall, new windows and doors, new dormers that add no additonal square footageDetails
reconfigure existing unit layouts, new kitchens and baths. exterior work includes new front entry sequence, new garage doors, new rear egress stair and fire wall, new windows and doors, new dormers that add no additonal square footage | $260,000 |
| Jan 31, 2014 | Completed final sign-off Mar 2016 | 2551 21st Av | remodel of existing bathroom, remodel of existing stair, removal of siding, (1) new bathroom, (1) new bedroom, storage room and family room on ground floorDetails
remodel of existing bathroom, remodel of existing stair, removal of siding, (1) new bathroom, (1) new bedroom, storage room and family room on ground floor | $100,000 |
| Oct 30, 2013 | Completed final sign-off May 2017 | 46 Saint Germain Av | 3 story home over basement. reconfigure (e) basemen space & infill under (e) overhang @ rear yard above. add exterior deck spaces/spa. (n) window/doors,skylights not visible from street. bsmt spa, rec room, office, gym. reconfigure 2nd fl, 2 (n) baths, rebuild stairs @ east side of propertyDetails
3 story home over basement. reconfigure (e) basemen space & infill under (e) overhang @ rear yard above. add exterior deck spaces/spa. (n) window/doors,skylights not visible from street. bsmt spa, rec room, office, gym. reconfigure 2nd fl, 2 (n) baths, rebuild stairs @ east side of property | $230,000 |
| Sep 17, 2013 | Never finaled issued Sep 2013, no final | 2133 Cabrillo St | 2/f- removel of master closet into master bath with new finishes/fixtures. replace finishes and fixtures in adjacent existing bath. plumbing, elec, deferred. no structuralDetails
2/f- removel of master closet into master bath with new finishes/fixtures. replace finishes and fixtures in adjacent existing bath. plumbing, elec, deferred. no structural | $25,000 |
| May 29, 2013 | Completed final sign-off Mar 2015 | 30 Clover St | voluntary structure strengthening & new slab & elect work, add shower to (e) half bath @ 1st floor, add new dormer & skylights, replace (e) windows & roof & skylights in kind, new insulation & wall sheathing.Details
voluntary structure strengthening & new slab & elect work, add shower to (e) half bath @ 1st floor, add new dormer & skylights, replace (e) windows & roof & skylights in kind, new insulation & wall sheathing. | $60,000 |
| May 17, 2011 | Completed final sign-off Oct 2011 | 1154 Stanyan St | renovation of master bathroom on top floor, addition of interior door to create studio, addition of window in light court, relocation of furnace & new electrical. (legalizing lower level)Details
renovation of master bathroom on top floor, addition of interior door to create studio, addition of window in light court, relocation of furnace & new electrical. (legalizing lower level) | $42,000 |
| Apr 20, 2011 | Completed final sign-off Oct 2012 | 2133 Cabrillo St | remodeling the kitchen and family room, half bathroom, no structural work. approx. 160 sq. ft.Details
remodeling the kitchen and family room, half bathroom, no structural work. approx. 160 sq. ft. | $26,799 |
| Sep 8, 2010 | Completed final sign-off Jan 2012 | 106 Edna St | remove stucco at front and baick of home and install new v rustic sidin. install 3 new vinyl windows at rear of home. remodel existing bath at main floor. install new closet at main floor bedroom. comply with nov 200716133. window u factor: 0.4 max.Details
remove stucco at front and baick of home and install new v rustic sidin. install 3 new vinyl windows at rear of home. remodel existing bath at main floor. install new closet at main floor bedroom. comply with nov 200716133. window u factor: 0.4 max. | $25,000 |
| Jul 28, 2009 | Completed final sign-off Jun 2010 | 65 Walter St | remove wall btwn. kit. & dining and enlarge opening to rear room. enlarge and renovate existing bath. relocate laundry and add bath 2 @ existing utility rm. install 3-windows + 1 ext. door @ existing locations- not visible from street.Details
remove wall btwn. kit. & dining and enlarge opening to rear room. enlarge and renovate existing bath. relocate laundry and add bath 2 @ existing utility rm. install 3-windows + 1 ext. door @ existing locations- not visible from street. | $55,000 |
| Oct 6, 2008 | Completed final sign-off Feb 2009 | 537 28th St | renovation of (e) bathroom (upstairs) & kitchen. replacement in kind of (e) windowDetails
renovation of (e) bathroom (upstairs) & kitchen. replacement in kind of (e) window | $50,000 |
| Feb 12, 2008 | Expired or cancelled expired Jan 2010 | 32 Ellert St | new claw foot bath tub, vanity, medicine cabinet, tile floor, toilet. approx 40 sq ft of sheetrock in bathroom on main level of home. (this is a remodel of an existing bath)Details
new claw foot bath tub, vanity, medicine cabinet, tile floor, toilet. approx 40 sq ft of sheetrock in bathroom on main level of home. (this is a remodel of an existing bath) | $3,000 |