Back to bathroom remodel contractors
Doorman Property Management
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to Feb 2015
- Last 24 months
- 0 permits filed
42 permits since 2000: 31 completed, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 8 completed, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2015 | Completed final sign-off Jun 2015 | 934 Howard St | tenant improvements at 1st flr only: new accessible break room, new conference room, expansion of accessible bathrooms & shower; new exterior level landing, new signage at restrooms; mechanical, elec & sprlr under separate permits; maher n/aDetails
tenant improvements at 1st flr only: new accessible break room, new conference room, expansion of accessible bathrooms & shower; new exterior level landing, new signage at restrooms; mechanical, elec & sprlr under separate permits; maher n/a | $10,000 |
| Jan 6, 2015 | Completed final sign-off May 2015 | 237 Banks St | kitchen & bathroom remodel with new subpanel. no structural modifications.Details
kitchen & bathroom remodel with new subpanel. no structural modifications. | $25,000 |
| Jul 9, 2014 | Completed final sign-off Jul 2015 | 80 Kissling St | interior remodel kitchen and 1 bath, replace fixtures and finishes throughout work on residential portion only. compliance with ord 155-13 not requiredDetails
interior remodel kitchen and 1 bath, replace fixtures and finishes throughout work on residential portion only. compliance with ord 155-13 not required | $8,500 |
| Jul 7, 2014 | Completed final sign-off Oct 2014 | 3669 23rd St | bathroom & kitchen remodel, new can lighting throughout. lightwell for kitchen remodel & bathroom remodel, shall comply with cec150(k)8 & 150(k) 10 respectively.Details
bathroom & kitchen remodel, new can lighting throughout. lightwell for kitchen remodel & bathroom remodel, shall comply with cec150(k)8 & 150(k) 10 respectively. | $50,000 |
| May 20, 2014 | Never finaled issued May 2014, no final | 1825 Pine St | remodel of bath and kitchen. upgrade all electrical to current standardsDetails
remodel of bath and kitchen. upgrade all electrical to current standards | $18,000 |
| Jan 15, 2014 | Expired or cancelled expired Jan 2016 | 656 Clayton St | apt #b:remodel of kitchen . new cabinetry replacement, appliances and flooring. remodel of upgrade in bathroom. replace tub and sink. replace floor tile. to comply with violation #211446921.Details
apt #b:remodel of kitchen . new cabinetry replacement, appliances and flooring. remodel of upgrade in bathroom. replace tub and sink. replace floor tile. to comply with violation #211446921. | $20,000 |
| Nov 4, 2013 | Expired or cancelled expired Nov 2017 | 217 Stratford Dr | kitchen and bathroom remodel; to comply with cec150(k) 8 & 10Details
kitchen and bathroom remodel; to comply with cec150(k) 8 & 10 | $50,000 |
| May 13, 2013 | Never finaled issued Aug 2013, no final | 231 06th St | tenant improvementof (e) 2-story occupancy office bldg to professional & business services bldg, scope i ncludes new interior partitions, interior & exterior finishes, selective replacement of mechanical, electrical & plumbing, accessibility improvement incl ada bathroom. replace interior stariDetails
tenant improvementof (e) 2-story occupancy office bldg to professional & business services bldg, scope i ncludes new interior partitions, interior & exterior finishes, selective replacement of mechanical, electrical & plumbing, accessibility improvement incl ada bathroom. replace interior stari | $28,500 |
| Apr 3, 2013 | Completed final sign-off May 2017 | 1000 Fulton St | reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath.Details
reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath. | $130,000 |
| Jan 29, 2013 | Expired or cancelled cancelled Jan 2026 | 1000 Fulton St | retile 6 bathrooms with 3"c6" tiles, repaint 4 restore interior walls, refinish floors & replace carpeting. install new h/c & access (lift & step) on west side of bldg.Details
retile 6 bathrooms with 3"c6" tiles, repaint 4 restore interior walls, refinish floors & replace carpeting. install new h/c & access (lift & step) on west side of bldg. | $58,000 |
| Jun 28, 2012 | Never finaled filed Jun 2012, never issued | 557 Howard St | comply with nov# 201045323-partitioning of office space, new stairs, lowering a portion of the 1st floor to grade, addition of 3 ada bathrooms, 2 shower rooms for new gym at basement and a non cooking cafe at gr floor.new storefront.Details
comply with nov# 201045323-partitioning of office space, new stairs, lowering a portion of the 1st floor to grade, addition of 3 ada bathrooms, 2 shower rooms for new gym at basement and a non cooking cafe at gr floor.new storefront. | $120,000 |
| Jan 31, 2012 | Completed final sign-off Feb 2012 | 601 Van Ness Av | replace bathroom cabinets, replace broken light switch, tile floor in bathroom, 3 new sinks in bathrooms, no structural work no (n) lightingDetails
replace bathroom cabinets, replace broken light switch, tile floor in bathroom, 3 new sinks in bathrooms, no structural work no (n) lighting | $5,000 |
| Jan 17, 2012 | Completed final sign-off May 2012 | 517 29th St | 1 bathroom remodel, retile floor and shower, new vanity, reduce from 2 sink vanity to one, increase gfi from 1 outlet to 2, install shower system (4 jets). lighting to comply with cec180(k)Details
1 bathroom remodel, retile floor and shower, new vanity, reduce from 2 sink vanity to one, increase gfi from 1 outlet to 2, install shower system (4 jets). lighting to comply with cec180(k) | $11,000 |
| Nov 21, 2011 | Completed final sign-off Jan 2012 | 574 03rd St | unit 326:enlarging bathroom,relocating fixtures,upgrade electrical and plmg. install new window at back on 3rd floor.Details
unit 326:enlarging bathroom,relocating fixtures,upgrade electrical and plmg. install new window at back on 3rd floor. | $20,000 |