Design Max Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Jun 2022
- Last 24 months
- 0 permits filed
202 permits since 2000: 154 completed, 33 never finaled, 15 expired or cancelled.
Of the 33 never-finaled permits, 21 are 5 to 10 years old, 12 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
19 stairs permits: 16 completed, 1 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2020 | Completed final sign-off Jul 2021 | 553 Wildwood Wy | complaint#202069791, replace floor tile at front stair.Details
complaint#202069791, replace floor tile at front stair. | $3,000 |
| Sep 12, 2018 | Completed final sign-off Sep 2019 | 144 Townsend St | abe program: update entrance and stair to ada compliance. n/a for maherDetails
abe program: update entrance and stair to ada compliance. n/a for maher | $3,000 |
| Jun 14, 2017 | Completed final sign-off Feb 2019 | 8 Springfield Dr | revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath doorDetails
revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath door | $1,500 |
| Mar 30, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stairDetails
on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stair | $45,000 |
| Jun 1, 2015 | Expired or cancelled withdrawn Jul 2019 | 1259 21st Av | revision to pa 2013 0429 5719 - remove spiral staircaseDetails
revision to pa 2013 0429 5719 - remove spiral staircase | |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 144 Townsend St | remove (e) walls, doors, & finishes. construct (n) walls, doors, ada lift, ada restrooms, ada parking, and bike storage; maher n/a. mep is to be design build and deferred. stair, bollards and guardrail connections deferred submittalsDetails
remove (e) walls, doors, & finishes. construct (n) walls, doors, ada lift, ada restrooms, ada parking, and bike storage; maher n/a. mep is to be design build and deferred. stair, bollards and guardrail connections deferred submittals | $96,000 |
| Sep 18, 2014 | Expired or cancelled cancelled Jan 2026 | 735 Montgomery St | revision for 201204188589(s1); re-locate the stair at 1st flr, relocate the wheel chair lift; maher n/aDetails
revision for 201204188589(s1); re-locate the stair at 1st flr, relocate the wheel chair lift; maher n/a | |
| Jun 24, 2014 | Completed final sign-off Mar 2016 | 190 Gaven St | to comply with nov# 201477531, remove stove @ garage level, remove one bathroom @ upper level, & its floor framing over (e) interior stairwayDetails
to comply with nov# 201477531, remove stove @ garage level, remove one bathroom @ upper level, & its floor framing over (e) interior stairway | $500 |
| Jun 10, 2014 | Completed final sign-off Jun 2014 | 8 Cypress St | comply with nov #201474852 item #2, repair & replace stair handrail components.Details
comply with nov #201474852 item #2, repair & replace stair handrail components. | $300 |
| Dec 5, 2012 | Completed final sign-off Feb 2013 | 781 Delta St | alter exterior front stair & provide 20% of front setback as landscaping.Details
alter exterior front stair & provide 20% of front setback as landscaping. | $5,000 |
| Dec 5, 2012 | Completed final sign-off Dec 2012 | 522 Athens St | repair (e) rear stair case per nov#201225081.Details
repair (e) rear stair case per nov#201225081. | $800 |
| Sep 13, 2011 | Never finaled issued Oct 2011, no final | 866 Sutter St | comply with nov# 201047499. seal the all back between commercial space & residential space. add ada restroom & shower. remove interior stair case.Details
comply with nov# 201047499. seal the all back between commercial space & residential space. add ada restroom & shower. remove interior stair case. | $57,000 |
| Feb 23, 2011 | Completed final sign-off Jul 2011 | 1552 Grant Av | to comply with nov#201187428 dated 1/18/2011. repair back staircase. replace wood member one by one in-kind. replace siding at rear side of building. repair leakage at first floor ceiling.Details
to comply with nov#201187428 dated 1/18/2011. repair back staircase. replace wood member one by one in-kind. replace siding at rear side of building. repair leakage at first floor ceiling. | $4,000 |
| Oct 25, 2010 | Completed final sign-off Jan 2011 | 246 Hearst Av | front staircase repair/replacement work and replace wood in-kindDetails
front staircase repair/replacement work and replace wood in-kind | $3,150 |
| Aug 25, 2010 | Completed final sign-off Feb 2011 | 425 Paris St | underpin partial (e) foundation & construct a new deck w/staircase at rear of house.Details
underpin partial (e) foundation & construct a new deck w/staircase at rear of house. | $18,000 |
| Jul 28, 2010 | Completed final sign-off Aug 2010 | 819 Lombard St | repair rear staircase in-kind less than 50%.Details
repair rear staircase in-kind less than 50%. | $1,500 |
| May 10, 2010 | Completed final sign-off Jan 2011 | 2721 Wawona St | remodel kitchen at upper level- open wall. provide voluntary structureal strengthning upgrade at lower level. bolt foundation, add plywood to some (e) walls. add new wall at (e) stairwayDetails
remodel kitchen at upper level- open wall. provide voluntary structureal strengthning upgrade at lower level. bolt foundation, add plywood to some (e) walls. add new wall at (e) stairway | $14,500 |
| Jul 28, 2009 | Completed final sign-off Sep 2009 | 2001 Quintara St | repair front stair case caused by car accident. 50 sq ft of stucco work, 2 steps and tiling work on steps.Details
repair front stair case caused by car accident. 50 sq ft of stucco work, 2 steps and tiling work on steps. | $13,000 |
| Sep 12, 2008 | Completed final sign-off Mar 2009 | 2182 22nd Av | revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrockDetails
revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrock | $14,000 |