Back to bathroom remodel contractors
Design Max Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Jun 2022
- Last 24 months
- 0 permits filed
202 permits since 2000: 154 completed, 33 never finaled, 15 expired or cancelled.
Of the 33 never-finaled permits, 21 are 5 to 10 years old, 12 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
67 bathroom remodel permits: 51 completed, 13 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2022 | Completed final sign-off Apr 2023 | 172 Denslowe Dr | remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout.Details
remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout. | $90,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 3315 Pierce St | adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room.Details
adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room. | $4,500 |
| Jul 28, 2021 | Completed final sign-off Jun 2022 | 650 Delancey St | unit 2: (2) in-kind bathrooms remodel: no layout change. no other workDetails
unit 2: (2) in-kind bathrooms remodel: no layout change. no other work | $18,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 3315 Pierce St | 2 bathrooms remodel (1 upstair, 1 downstair). no layout change.Details
2 bathrooms remodel (1 upstair, 1 downstair). no layout change. | $18,000 |
| Jun 22, 2021 | Never finaled filed Jun 2021, never issued | 2689 23rd Av | to renew expired building permits. (1) commencement of work not started previously approved permit app#: 201501297032 - to add (2) bedrooms, (1) bathroom at the ground flr (2) commencement of work not started previously approved permit app#: 201506179226 - to legalize a 2nd unit at ground flrDetails
to renew expired building permits. (1) commencement of work not started previously approved permit app#: 201501297032 - to add (2) bedrooms, (1) bathroom at the ground flr (2) commencement of work not started previously approved permit app#: 201506179226 - to legalize a 2nd unit at ground flr | |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 230 Lake Merced Hill St North St | hallway bath remodel, replace shower, replace vanity, no change to toilet, same locationDetails
hallway bath remodel, replace shower, replace vanity, no change to toilet, same location | $10,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 1221 Clayton St | hallway bath toilet room remodel, no change on tub, powder room remodel, non structuralDetails
hallway bath toilet room remodel, no change on tub, powder room remodel, non structural | $10,000 |
| Apr 12, 2021 | Completed final sign-off Jan 2022 | 2001 Mcallister St | master bathroom: replace toilet, vanity top only, shower wall tile, light and fan. hallway bath: replace toilet, vanity top, tub, tub wall tile, light and fan.Details
master bathroom: replace toilet, vanity top only, shower wall tile, light and fan. hallway bath: replace toilet, vanity top, tub, tub wall tile, light and fan. | $28,000 |
| Feb 3, 2021 | Completed final sign-off Dec 2021 | 1458 09th Av | remodel powder room and replace toilet, sink at 2nd floor. replace sink, toilet and tub at 3rd floor hallway bath.Details
remodel powder room and replace toilet, sink at 2nd floor. replace sink, toilet and tub at 3rd floor hallway bath. | $15,000 |
| Feb 1, 2021 | Never finaled issued May 2021, no final | 17 Pearl St | kitchen remodel. bathroom remodel. bathroom additional at 3rd floor.Details
kitchen remodel. bathroom remodel. bathroom additional at 3rd floor. | $60,000 |
| Jan 22, 2021 | Completed final sign-off Jul 2021 | 1219 Clayton St | remodel hallway bath at 2nd floor only. repair siding at rear approx. 30 sq. ft.Details
remodel hallway bath at 2nd floor only. repair siding at rear approx. 30 sq. ft. | $10,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 109 Stratford Dr | remodel hallway bath, add outlet for fire place, add subpanel @ hallway for hallway bathDetails
remodel hallway bath, add outlet for fire place, add subpanel @ hallway for hallway bath | $10,000 |
| Oct 6, 2020 | Completed final sign-off Nov 2020 | 308 Francisco St | replace lower level bath vanity toilet and light fixtures. tile to remainDetails
replace lower level bath vanity toilet and light fixtures. tile to remain | $2,000 |
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 79 Seward St | remodel (e) hallway bathroom in-kind.Details
remodel (e) hallway bathroom in-kind. | $9,000 |
| Feb 27, 2020 | Expired or cancelled expired May 2022 | 3621 Broderick St | 1 bathroom remodel, replace toilet, tub and shower fixtures and vanity etcDetails
1 bathroom remodel, replace toilet, tub and shower fixtures and vanity etc | $10,000 |
| Feb 21, 2020 | Completed final sign-off Nov 2020 | 308 Francisco St | remodel 1 ktichen & bathroom in kind.Details
remodel 1 ktichen & bathroom in kind. | $20,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 308 Francisco St | kitchen and bath remodelDetails
kitchen and bath remodel | $15,000 |
| Sep 18, 2019 | Completed final sign-off Jan 2020 | 255 Maywood Dr | to comply with nov #201885321. rmeove a bath at garage level. remove deck at rear.Details
to comply with nov #201885321. rmeove a bath at garage level. remove deck at rear. | $3,000 |
| Jun 6, 2019 | Expired or cancelled cancelled Jan 2026 | 532 Hugo St | add a bath at attic spaceDetails
add a bath at attic space | $12,000 |
| May 31, 2019 | Completed final sign-off Aug 2019 | 738 North Point St | convert a storage to 1/2 bathDetails
convert a storage to 1/2 bath | $4,500 |
| May 21, 2019 | Completed final sign-off Aug 2019 | 209 Onondaga Av | add a shower at 2nd flr (e) half-bath. remodel 2nd flr hallway bath.Details
add a shower at 2nd flr (e) half-bath. remodel 2nd flr hallway bath. | $15,000 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 503 Hugo St | remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan.Details
remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan. | $10,000 |
| Apr 18, 2019 | Completed final sign-off Sep 2020 | 1259 21st Av | remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a **Details
remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a ** | $1,500 |
| Mar 6, 2019 | Never finaled issued May 2019, no final | 530 Hugo St | add 2 bedrooms, 2 bathrooms and 1 family rm at ground flrDetails
add 2 bedrooms, 2 bathrooms and 1 family rm at ground flr | $50,000 |
| Jan 30, 2019 | Completed final sign-off Oct 2019 | 1851 18th Av | 1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms.Details
1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms. | $68,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 1614 Cayuga Av | 1/f: add 2 bedrooms, an exercise room, two full bathrooms.Details
1/f: add 2 bedrooms, an exercise room, two full bathrooms. | $50,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 1260 16th Av | 1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bathDetails
1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bath | $100,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2018 | 3525 Broderick St | remodel one bathroom at upper level (2nd floor hallway). remodel in-kind. no structural work. comply with cec150.0(k) 5Details
remodel one bathroom at upper level (2nd floor hallway). remodel in-kind. no structural work. comply with cec150.0(k) 5 | $10,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2020 | 45 Mclaren Av | at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slabDetails
at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slab | $49,000 |
| May 25, 2018 | Never finaled issued May 2018, no final | 530 Hugo St | remodel existing 2 bath & 1 kitchen. all fixtures remain at same location.Details
remodel existing 2 bath & 1 kitchen. all fixtures remain at same location. | $48,000 |
| Mar 13, 2018 | Never finaled issued Mar 2018, no final | 882 York St | interior residential remodel of e 3rd fl unit includes new interior finishes at 3 bdrms, bath, kitche, living areas. 1 full bath addition 3rd fl inter, new windows door at rear yard exterior 3rd fl. replace all other e windows in kind 3rd fl. new structural post and footingDetails
interior residential remodel of e 3rd fl unit includes new interior finishes at 3 bdrms, bath, kitche, living areas. 1 full bath addition 3rd fl inter, new windows door at rear yard exterior 3rd fl. replace all other e windows in kind 3rd fl. new structural post and footing | $86,000 |
| Feb 6, 2018 | Completed final sign-off Jul 2018 | 154 Oshaughnessy Bl | comply with 201830681, add 2 bedrooms and 2 baths at gr flDetails
comply with 201830681, add 2 bedrooms and 2 baths at gr fl | $40,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2018 | 79 Bruce Av | interior room addition on basement. add 1 bedroom, family room and 2 bathroomsDetails
interior room addition on basement. add 1 bedroom, family room and 2 bathrooms | $25,000 |
| Jun 14, 2017 | Completed final sign-off Feb 2019 | 8 Springfield Dr | revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath doorDetails
revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath door | $1,500 |
| May 30, 2017 | Completed final sign-off Dec 2018 | 2214 36th Av | per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f.Details
per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f. | $5,000 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 79 Bruce Av | remodel bathrooms @ upper floors; electrical rewire of entire house.Details
remodel bathrooms @ upper floors; electrical rewire of entire house. | $10,000 |
| Jan 6, 2017 | Completed final sign-off Jun 2020 | 1017 Brussels St | legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans.Details
legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans. | $5,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 1353 Church St | kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5.Details
kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5. | $8,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2017 | 70 Blair Tr | 3rd floor - convert (e) washroom to full bathroom; new wall mounted instantneous tankless water heater to attic and replace (e) tub with shower at (e) bathroomDetails
3rd floor - convert (e) washroom to full bathroom; new wall mounted instantneous tankless water heater to attic and replace (e) tub with shower at (e) bathroom | $15,000 |
| Apr 22, 2016 | Completed final sign-off Feb 2019 | 8 Springfield Dr | construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrmDetails
construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrm | $49,000 |
| Mar 30, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stairDetails
on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stair | $45,000 |
| Nov 20, 2015 | Completed final sign-off Nov 2017 | 72 Harrington St | interior addition on 1st floor - add 2 bedrooms and 2 bathsDetails
interior addition on 1st floor - add 2 bedrooms and 2 baths | $20,000 |
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 3431 Moraga St | add one bath, one bedroom, one family at garage level.Details
add one bath, one bedroom, one family at garage level. | $25,000 |
| Jun 30, 2015 | Completed final sign-off Mar 2016 | 329 Silver Av | abatement of nov #201546701 & #201544481 - remove walls & illegal bathroom at garage level. n/a maher ordinanceDetails
abatement of nov #201546701 & #201544481 - remove walls & illegal bathroom at garage level. n/a maher ordinance | $8,000 |
| Mar 2, 2015 | Completed final sign-off Jun 2015 | 1333 Balboa St | convert walk-in closet to bathroom in each unit (4). convert two-family rooms facing street to bedrooms (2 units)Details
convert walk-in closet to bathroom in each unit (4). convert two-family rooms facing street to bedrooms (2 units) | $40,000 |
| Dec 19, 2014 | Completed final sign-off Jun 2015 | 1333 Balboa St | remodel 1 kitchen & 1 bath at units a, b, c & d. all fixtures at same location. no structural workDetails
remodel 1 kitchen & 1 bath at units a, b, c & d. all fixtures at same location. no structural work | $50,000 |
| Jun 24, 2014 | Completed final sign-off Mar 2016 | 190 Gaven St | to comply with nov# 201477531, remove stove @ garage level, remove one bathroom @ upper level, & its floor framing over (e) interior stairwayDetails
to comply with nov# 201477531, remove stove @ garage level, remove one bathroom @ upper level, & its floor framing over (e) interior stairway | $500 |
| Jan 17, 2014 | Completed final sign-off Jun 2014 | 225 Woolsey St | install dormer at east slope of roof to add a 5'x8' bathroom. no work at basement & 1st floor.Details
install dormer at east slope of roof to add a 5'x8' bathroom. no work at basement & 1st floor. | $9,000 |
| Mar 21, 2013 | Completed final sign-off Aug 2013 | 858 Florida St | add 1 bathroom at upper level & legalize 2 (e) bedrooms & 1 bathroom on ground level (garage)Details
add 1 bathroom at upper level & legalize 2 (e) bedrooms & 1 bathroom on ground level (garage) | $6,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1808 Wawona St | remodeling works at kitchen and hallway bath. all work on upper floor per plan.Details
remodeling works at kitchen and hallway bath. all work on upper floor per plan. | $15,000 |
| Mar 1, 2013 | Completed final sign-off Aug 2013 | 858 Florida St | remodeling (e) kitchen and bath, all owrk at upper floor. no change on walls.Details
remodeling (e) kitchen and bath, all owrk at upper floor. no change on walls. | $15,000 |
| Aug 24, 2012 | Never finaled issued Aug 2012, no final | 866 Sutter St | revision to pa# 2011/09/13/4467. change the interior bathroom wall configuration.Details
revision to pa# 2011/09/13/4467. change the interior bathroom wall configuration. | |
| Mar 21, 2012 | Completed final sign-off Jun 2012 | 666 Monterey Bl | interior remodeling on 2nd floor.all works at upper floor. convert a playroom and kitchen to 2 bedroom, one bathroom, and study room,convert dining room to kitchen.Details
interior remodeling on 2nd floor.all works at upper floor. convert a playroom and kitchen to 2 bedroom, one bathroom, and study room,convert dining room to kitchen. | $12,000 |
| Feb 22, 2012 | Completed final sign-off Mar 2012 | 101 Oxford St | remodel one bathroom and replace shower pan, tile floor, new vanity and toilet etc. no change on walls and openings.Details
remodel one bathroom and replace shower pan, tile floor, new vanity and toilet etc. no change on walls and openings. | $2,000 |
| Oct 6, 2011 | Completed final sign-off Nov 2012 | 2222 29th Av | revision to pa# 2011.08.19.2863. relocate bathroom and laundry rm at ground floor. replace one window to sliding dr at rear side of bldgDetails
revision to pa# 2011.08.19.2863. relocate bathroom and laundry rm at ground floor. replace one window to sliding dr at rear side of bldg | |
| Aug 19, 2011 | Completed final sign-off Sep 2012 | 2222 29th Av | remodel kitchen at upper floor, remodel 2 bedrooms at upper floor, remodel 1 bathroom at lower floor. relocate washer & dryer.remove hallway wall to enlarge extg play room.Details
remodel kitchen at upper floor, remodel 2 bedrooms at upper floor, remodel 1 bathroom at lower floor. relocate washer & dryer.remove hallway wall to enlarge extg play room. | $19,000 |
| Jul 7, 2011 | Completed final sign-off Nov 2011 | 2375 31st Av | interior room addition all at 1st floor: add two bedrooms, one bath & one family room.Details
interior room addition all at 1st floor: add two bedrooms, one bath & one family room. | $20,000 |
| Nov 22, 2010 | Completed final sign-off Feb 2011 | 39 Brant Al | one kitchen and one bathroom remodeling work, all works at 3rd flr: no other workDetails
one kitchen and one bathroom remodeling work, all works at 3rd flr: no other work | $15,000 |
| Oct 9, 2009 | Completed final sign-off Mar 2010 | 250 27th Av | correction work at ground fllor-comply with nov# 200883845-legalize 2 bedrooms, 1 storage room & 2 half bathrooms at garage level. work for unit# 250 27th avenueDetails
correction work at ground fllor-comply with nov# 200883845-legalize 2 bedrooms, 1 storage room & 2 half bathrooms at garage level. work for unit# 250 27th avenue | $2,000 |
| Jul 20, 2009 | Completed final sign-off Oct 2009 | 1758 33rd Av | construct new wall between hallway and bedroom. convert e study room to bedroom, add 1 new bathroom. all work on 2nd floorDetails
construct new wall between hallway and bedroom. convert e study room to bedroom, add 1 new bathroom. all work on 2nd floor | $14,000 |
| Jul 7, 2009 | Expired or cancelled expired Mar 2011 | 2045 Irving St | change of use from retail to a new yogurt store (tutti melon). add a new ada bathroom.Details
change of use from retail to a new yogurt store (tutti melon). add a new ada bathroom. | $50,000 |
| Oct 24, 2008 | Completed final sign-off Oct 2009 | 1354 Haight St | one kitchen remodeling: cabinet, countertop, tile etc. one bathroom remodeling change door to kitchen & bath. no change window, existing.Details
one kitchen remodeling: cabinet, countertop, tile etc. one bathroom remodeling change door to kitchen & bath. no change window, existing. | $20,500 |
| Sep 12, 2008 | Completed final sign-off Mar 2009 | 2182 22nd Av | revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrockDetails
revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrock | $14,000 |
| Sep 2, 2008 | Completed final sign-off Jul 2009 | 1356 Haight St | remodel kitchen & 1 bathroom (cabinet, countertop, tile, electrical) replace & fix sheetrock. approx 300 sq ft. electrical re-wiring.Details
remodel kitchen & 1 bathroom (cabinet, countertop, tile, electrical) replace & fix sheetrock. approx 300 sq ft. electrical re-wiring. | $18,000 |
| Jun 16, 2008 | Completed final sign-off Jan 2009 | 1538 21st Av | revision to application 200804018446./ relocate kitchen at 2nd floor & bathroom at ground floor.new closet on third floorDetails
revision to application 200804018446./ relocate kitchen at 2nd floor & bathroom at ground floor.new closet on third floor | |
| May 6, 2008 | Completed final sign-off Jun 2008 | 1347 Irving St | convert existing parking garage to insurance office & convert (e) bathroom to h.c. bathroom.Details
convert existing parking garage to insurance office & convert (e) bathroom to h.c. bathroom. | $30,000 |
| May 15, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor.Details
install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor. | $25,000 |