Back to kitchen remodel contractors
Design Max Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Jun 2022
- Last 24 months
- 0 permits filed
202 permits since 2000: 154 completed, 33 never finaled, 15 expired or cancelled.
Of the 33 never-finaled permits, 21 are 5 to 10 years old, 12 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 32 completed, 10 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2022 | Completed final sign-off Apr 2023 | 172 Denslowe Dr | remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout.Details
remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout. | $90,000 |
| Feb 1, 2021 | Never finaled issued May 2021, no final | 17 Pearl St | kitchen remodel. bathroom remodel. bathroom additional at 3rd floor.Details
kitchen remodel. bathroom remodel. bathroom additional at 3rd floor. | $60,000 |
| Jan 22, 2021 | Completed final sign-off Dec 2021 | 1458 09th Av | kitchen remodel, fixtures at same location. replace cabinets and countertop.Details
kitchen remodel, fixtures at same location. replace cabinets and countertop. | $10,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 308 Francisco St | kitchen and bath remodelDetails
kitchen and bath remodel | $15,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 314 Francisco St | kitchen remodel in kind.Details
kitchen remodel in kind. | $10,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 312 Francisco St | kitchen remodel in kind.Details
kitchen remodel in kind. | $10,000 |
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 1914 30th Av | kitchen remodel, no wall removed, 11 ft. x 11 ft. approximatelyDetails
kitchen remodel, no wall removed, 11 ft. x 11 ft. approximately | $8,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 713 Shrader St | replace kitchen counter top only. (e) cabinets remain. install washer/dryer into (e) closet. replace sink, no ateration on walls, etc.Details
replace kitchen counter top only. (e) cabinets remain. install washer/dryer into (e) closet. replace sink, no ateration on walls, etc. | $4,500 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 503 Hugo St | remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan.Details
remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan. | $10,000 |
| Apr 18, 2019 | Completed final sign-off Sep 2020 | 1259 21st Av | remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a **Details
remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a ** | $1,500 |
| Jan 30, 2019 | Completed final sign-off Oct 2019 | 1851 18th Av | 1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms.Details
1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms. | $68,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 1260 16th Av | 1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bathDetails
1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bath | $100,000 |
| Jan 3, 2019 | Completed final sign-off Jun 2021 | 2418 17th Av | 2nd floor: relocate kitchen, move door & add closetDetails
2nd floor: relocate kitchen, move door & add closet | $10,000 |
| Nov 30, 2018 | Never finaled issued Apr 2019, no final | 377 Franconia St | remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl.Details
remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl. | $95,000 |
| May 25, 2018 | Never finaled issued May 2018, no final | 530 Hugo St | remodel existing 2 bath & 1 kitchen. all fixtures remain at same location.Details
remodel existing 2 bath & 1 kitchen. all fixtures remain at same location. | $48,000 |
| Feb 8, 2018 | Expired or cancelled cancelled Jun 2018 | 567 Greenwich St | kitchen remodel all fixtures at same location no alteration of wall, windows or doorsDetails
kitchen remodel all fixtures at same location no alteration of wall, windows or doors | $10,000 |
| Jun 14, 2017 | Completed final sign-off Feb 2019 | 8 Springfield Dr | revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath doorDetails
revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath door | $1,500 |
| May 30, 2017 | Completed final sign-off Dec 2018 | 2214 36th Av | per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f.Details
per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f. | $5,000 |
| Jan 6, 2017 | Completed final sign-off Jun 2020 | 1017 Brussels St | legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans.Details
legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans. | $5,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 1353 Church St | kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5.Details
kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5. | $8,000 |
| Apr 22, 2016 | Completed final sign-off Feb 2019 | 8 Springfield Dr | construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrmDetails
construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrm | $49,000 |
| Dec 19, 2014 | Completed final sign-off Jun 2015 | 1333 Balboa St | remodel 1 kitchen & 1 bath at units a, b, c & d. all fixtures at same location. no structural workDetails
remodel 1 kitchen & 1 bath at units a, b, c & d. all fixtures at same location. no structural work | $50,000 |
| Mar 7, 2014 | Never finaled issued Mar 2014, no final | 341 Kearny St | add a type ii wood at kitchen area per health department request.Details
add a type ii wood at kitchen area per health department request. | $3,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1808 Wawona St | remodeling works at kitchen and hallway bath. all work on upper floor per plan.Details
remodeling works at kitchen and hallway bath. all work on upper floor per plan. | $15,000 |
| Mar 1, 2013 | Completed final sign-off Aug 2013 | 858 Florida St | remodeling (e) kitchen and bath, all owrk at upper floor. no change on walls.Details
remodeling (e) kitchen and bath, all owrk at upper floor. no change on walls. | $15,000 |
| Mar 1, 2013 | Completed final sign-off Jul 2013 | 36 Vesta St | remodeling existing kitchen, all work at upper floor. no cjhange on walls.Details
remodeling existing kitchen, all work at upper floor. no cjhange on walls. | $8,000 |
| Mar 22, 2012 | Completed final sign-off May 2012 | 1456 Sacramento St | unit #4: kitchen remodeling- new sheetrack wall & ceiling, 12 new outlets,3 lights, relocate gas line, bathrm remodel: new sheetrock wall & ceiling, 2 new outlets, 1 new vanity, comply with cec 150(k) lighting requirements new sub panel, no change to exhaust systemDetails
unit #4: kitchen remodeling- new sheetrack wall & ceiling, 12 new outlets,3 lights, relocate gas line, bathrm remodel: new sheetrock wall & ceiling, 2 new outlets, 1 new vanity, comply with cec 150(k) lighting requirements new sub panel, no change to exhaust system | $8,000 |
| Mar 21, 2012 | Completed final sign-off Jun 2012 | 666 Monterey Bl | interior remodeling on 2nd floor.all works at upper floor. convert a playroom and kitchen to 2 bedroom, one bathroom, and study room,convert dining room to kitchen.Details
interior remodeling on 2nd floor.all works at upper floor. convert a playroom and kitchen to 2 bedroom, one bathroom, and study room,convert dining room to kitchen. | $12,000 |
| Aug 19, 2011 | Completed final sign-off Sep 2012 | 2222 29th Av | remodel kitchen at upper floor, remodel 2 bedrooms at upper floor, remodel 1 bathroom at lower floor. relocate washer & dryer.remove hallway wall to enlarge extg play room.Details
remodel kitchen at upper floor, remodel 2 bedrooms at upper floor, remodel 1 bathroom at lower floor. relocate washer & dryer.remove hallway wall to enlarge extg play room. | $19,000 |
| Jun 27, 2011 | Never finaled issued Jun 2011, no final | 1 Daniel Burnham Ct | relocate 2 pcs. of tile in kitchen, paint one wall at living room.Details
relocate 2 pcs. of tile in kitchen, paint one wall at living room. | $800 |
| Jun 9, 2011 | Completed final sign-off Mar 2012 | 2028 Larkin St | kitchen remodel work, replace 153" cabinets, counter top, dishwasher, stove, work at 3rd floor. kitchen remodel work including sink, cabinets, coutner top, dw, etc. all work at 2nd floor. min 50% of kitchen lighting watts shall be of high efficiency fixtures.Details
kitchen remodel work, replace 153" cabinets, counter top, dishwasher, stove, work at 3rd floor. kitchen remodel work including sink, cabinets, coutner top, dw, etc. all work at 2nd floor. min 50% of kitchen lighting watts shall be of high efficiency fixtures. | $15,000 |
| May 25, 2011 | Completed final sign-off Sep 2011 | 1786 44th Av | kitchen cabinet remodel works, counter top, sink, floor and paint etc. no wall removed, back room replace tile floorDetails
kitchen cabinet remodel works, counter top, sink, floor and paint etc. no wall removed, back room replace tile floor | $8,000 |
| Mar 1, 2011 | Completed final sign-off Mar 2011 | 1456 Sacramento St | unit # 8, no window, wall, ceiling & no doors on this permit. remodel one kitchen. replace cabinet countertop & sink. replace in kind. replace gyp. board w/ 5/8" gymp bd type x area = 80 sq ft. new lighting comply w/ cec 150 (k)Details
unit # 8, no window, wall, ceiling & no doors on this permit. remodel one kitchen. replace cabinet countertop & sink. replace in kind. replace gyp. board w/ 5/8" gymp bd type x area = 80 sq ft. new lighting comply w/ cec 150 (k) | $9,000 |
| Nov 22, 2010 | Completed final sign-off Feb 2011 | 39 Brant Al | one kitchen and one bathroom remodeling work, all works at 3rd flr: no other workDetails
one kitchen and one bathroom remodeling work, all works at 3rd flr: no other work | $15,000 |
| Nov 9, 2010 | Completed final sign-off Feb 2011 | 1504 Shrader St | 2nd floor. kitchen remodeling incl. removing two walls and one opening, and front windows replacementDetails
2nd floor. kitchen remodeling incl. removing two walls and one opening, and front windows replacement | $9,000 |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 1358 Haight St | kitchen remodel, elec upgrade, cabinet, countertopDetails
kitchen remodel, elec upgrade, cabinet, countertop | $5,000 |
| May 10, 2010 | Completed final sign-off Jan 2011 | 2721 Wawona St | remodel kitchen at upper level- open wall. provide voluntary structureal strengthning upgrade at lower level. bolt foundation, add plywood to some (e) walls. add new wall at (e) stairwayDetails
remodel kitchen at upper level- open wall. provide voluntary structureal strengthning upgrade at lower level. bolt foundation, add plywood to some (e) walls. add new wall at (e) stairway | $14,500 |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 96 Caselli Av | per physical inspection report #3r-5212 item #5 #6 kitchen range ventilation ducts & kitchen remodeling works, no moving or adding walls, item #5 & item #6 for both 96, 98 caselli.Details
per physical inspection report #3r-5212 item #5 #6 kitchen range ventilation ducts & kitchen remodeling works, no moving or adding walls, item #5 & item #6 for both 96, 98 caselli. | $8,000 |
| Oct 24, 2008 | Completed final sign-off Oct 2009 | 1354 Haight St | one kitchen remodeling: cabinet, countertop, tile etc. one bathroom remodeling change door to kitchen & bath. no change window, existing.Details
one kitchen remodeling: cabinet, countertop, tile etc. one bathroom remodeling change door to kitchen & bath. no change window, existing. | $20,500 |
| Oct 24, 2008 | Completed final sign-off Mar 2009 | 205 Caselli Av | one kitchen remodeling.non structural lighting changes.Details
one kitchen remodeling.non structural lighting changes. | $16,000 |
| Sep 12, 2008 | Completed final sign-off Mar 2009 | 2182 22nd Av | revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrockDetails
revise pa# 2008-0808-8797-remove (e) interior stairs ti ground floor. add 1 bathroom at bedroom #2, revise bathroom to connect to bedroom #1. eliminate foyer area to become kitchen. replace interior footing & new slab. replace wall, ceiling with insulation and 5/8 sheetrock | $14,000 |
| Sep 2, 2008 | Completed final sign-off Jul 2009 | 1356 Haight St | remodel kitchen & 1 bathroom (cabinet, countertop, tile, electrical) replace & fix sheetrock. approx 300 sq ft. electrical re-wiring.Details
remodel kitchen & 1 bathroom (cabinet, countertop, tile, electrical) replace & fix sheetrock. approx 300 sq ft. electrical re-wiring. | $18,000 |
| Jun 16, 2008 | Completed final sign-off Jan 2009 | 1538 21st Av | revision to application 200804018446./ relocate kitchen at 2nd floor & bathroom at ground floor.new closet on third floorDetails
revision to application 200804018446./ relocate kitchen at 2nd floor & bathroom at ground floor.new closet on third floor |