Back to kitchen remodel contractors
Deleon Builders Inc
- Based in
- Novato
- On San Francisco permits
- Aug 2017 to Aug 2026
- Last 24 months
- 12 permits filed
55 permits since 2000: 38 completed, 7 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 17 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1012 Grant Av | unit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry...Details
unit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry... | $70,000 |
| Sep 18, 2025 | Completed final sign-off Jan 2026 | 2729 Lombard St | unit 7: 1 kitchen remodel like for like, 2 bathroom remodels, like for like, tub, sink, tiles, shower walls and floor, 1 existing laundry room remodel like for like. no removal of wallsDetails
unit 7: 1 kitchen remodel like for like, 2 bathroom remodels, like for like, tub, sink, tiles, shower walls and floor, 1 existing laundry room remodel like for like. no removal of walls | $38,000 |
| May 29, 2025 | Completed final sign-off Feb 2026 | 1001 Ulloa St | interior in kind remodel of kitchen and baths at 2nd flDetails
interior in kind remodel of kitchen and baths at 2nd fl | $60,000 |
| Feb 3, 2025 | Completed final sign-off Dec 2025 | 1062 Noe St | unit 1062 and 1062a located on the 2nd fl: remodel 2 kitchens (same place) remodel 2 bathrooms (same place) tub, toilet, sink, water heaterDetails
unit 1062 and 1062a located on the 2nd fl: remodel 2 kitchens (same place) remodel 2 bathrooms (same place) tub, toilet, sink, water heater | $40,000 |
| Feb 3, 2025 | Completed final sign-off Dec 2025 | 1064 Noe St | unit 1064 and 1064a located on the 3rd fl: remodel 2 kitchens (same place) remodel 2 bathrooms (same place) tub, toilet, sink, water heaterDetails
unit 1064 and 1064a located on the 3rd fl: remodel 2 kitchens (same place) remodel 2 bathrooms (same place) tub, toilet, sink, water heater | $40,000 |
| Nov 21, 2024 | Completed final sign-off Dec 2025 | 1060 Noe St | remodel of 2 kitchen (same place) unit 1060 and 1060a are located on the 1st floor of building. remodel of 2 bath (same place) bath tub, toilet, and sink.Details
remodel of 2 kitchen (same place) unit 1060 and 1060a are located on the 1st floor of building. remodel of 2 bath (same place) bath tub, toilet, and sink. | $40,000 |
| Nov 30, 2023 | Completed final sign-off Apr 2024 | 1333 Jones St | remodel kitchen same place, replace cabinets, counter top , sink and faucetDetails
remodel kitchen same place, replace cabinets, counter top , sink and faucet | $15,000 |
| Feb 22, 2023 | Completed final sign-off Aug 2023 | 1455 40th Av | reconfigure (e) bathroom and closet into (2) new bathrooms and reconfigure (e) kitchen/dining roomDetails
reconfigure (e) bathroom and closet into (2) new bathrooms and reconfigure (e) kitchen/dining room | $21,000 |
| Jul 26, 2022 | Completed final sign-off Jun 2024 | 1030 Fell St | unit #6: full remodel of kitchen. replace cabinets, tile, floor, drywall in walls and ceiling (same place). full remodel of bath. shower pan, sink, toilet, tile. replace drywall on bed and living room. all work in kind.Details
unit #6: full remodel of kitchen. replace cabinets, tile, floor, drywall in walls and ceiling (same place). full remodel of bath. shower pan, sink, toilet, tile. replace drywall on bed and living room. all work in kind. | $30,000 |
| Jul 5, 2022 | Completed final sign-off Jul 2022 | 100 20th Av | kitchen remodel (replace cabinets only).Details
kitchen remodel (replace cabinets only). | $10,000 |
| May 31, 2022 | Completed final sign-off Sep 2022 | 2945 Pacific Av | kitchen remodel: new cabinets and counter : replace tile (floor) bathroom remodel- new shower tile walls and floor; not remove wallsDetails
kitchen remodel: new cabinets and counter : replace tile (floor) bathroom remodel- new shower tile walls and floor; not remove walls | $30,000 |
| May 27, 2022 | Completed final sign-off Sep 2024 | 28 Ashbury St | interior reno: 1st and 3rd flr:1st flr (n) conditioned exercise/storage space within (e) bldg envelope. 3rd flr: reconfigure (e) entry closetm renovate (e) hall bathroom, kitchen, master closet and master bathroom, replacement windows at rear, replace (e) double hung units w/ (n) casementDetails
interior reno: 1st and 3rd flr:1st flr (n) conditioned exercise/storage space within (e) bldg envelope. 3rd flr: reconfigure (e) entry closetm renovate (e) hall bathroom, kitchen, master closet and master bathroom, replacement windows at rear, replace (e) double hung units w/ (n) casement | $118,000 |
| Mar 7, 2022 | Completed final sign-off Feb 2023 | 15 Dolores St | #2. remodel kitchen, same place (cabinets, tile floor). 100 sq ft. remodel 1 bathroom (replace bath tub, tile walls and floor), replace drywall of entire unt. no removal of wallsDetails
#2. remodel kitchen, same place (cabinets, tile floor). 100 sq ft. remodel 1 bathroom (replace bath tub, tile walls and floor), replace drywall of entire unt. no removal of walls | $30,000 |
| Feb 1, 2022 | Completed final sign-off Dec 2024 | 231 11th Av | to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north,Details
to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north, | |
| Nov 9, 2021 | Completed final sign-off Oct 2022 | 1923 32nd Av | 1) comply with nov 202182659 and 202182692. 2) removal of extg walls along front portion of bldg. 3) remodel and expand kitchen area. 4) remodel 4 bathrooms. 5)convert extg room to a bar at rear lower floor. 6)replace all interior finishes.Details
1) comply with nov 202182659 and 202182692. 2) removal of extg walls along front portion of bldg. 3) remodel and expand kitchen area. 4) remodel 4 bathrooms. 5)convert extg room to a bar at rear lower floor. 6)replace all interior finishes. | $100,000 |
| Oct 14, 2021 | Never finaled issued Nov 2021, no final | 1619 Shafter Av | to comply with nov# 202182722: remodel one kitchen and one bathroom kitchen replace cabinets and countertop- same place bathroom- replace tile and shower pan-same place.Details
to comply with nov# 202182722: remodel one kitchen and one bathroom kitchen replace cabinets and countertop- same place bathroom- replace tile and shower pan-same place. | $25,000 |
| Sep 1, 2021 | Completed final sign-off Nov 2024 | 500 Bella Vista Wy | remodel (e) kitchen and (e) master and lower level bathrooms. new fixtures, cabinets & tilesDetails
remodel (e) kitchen and (e) master and lower level bathrooms. new fixtures, cabinets & tiles | $50,000 |
| May 14, 2021 | Completed final sign-off Aug 2024 | 72 Longview Ct | modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyardDetails
modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyard | $48,000 |
| Feb 12, 2021 | Completed final sign-off Aug 2021 | 3830 Divisadero St | apt 101:r emodel kitchen in same loayout: replace countertop & cabinets. remodel (e) 2 bathrooms in same layout, 1 tub, 1 shower. replace drywall of entire unit.Details
apt 101:r emodel kitchen in same loayout: replace countertop & cabinets. remodel (e) 2 bathrooms in same layout, 1 tub, 1 shower. replace drywall of entire unit. | $48,000 |