Deleon Builders Inc
- Based in
- Novato
- On San Francisco permits
- Aug 2017 to Aug 2026
- Last 24 months
- 12 permits filed
55 permits since 2000: 38 completed, 7 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 169 days from filing to permit and 480 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2024 | Completed final sign-off Jan 2025 | 1515 Waller St | prop h: change of use of (e) 1st fl commercial space from dry cleaner to yoga studio. add new wet bar. correct all restroom accessibility issues. remove (e) stair and door to non-complying storage.add mechanical closet below existing stair. install power door operator and actuators at bldg entrance.Details
prop h: change of use of (e) 1st fl commercial space from dry cleaner to yoga studio. add new wet bar. correct all restroom accessibility issues. remove (e) stair and door to non-complying storage.add mechanical closet below existing stair. install power door operator and actuators at bldg entrance. | |
| Sep 20, 2021 | Never finaled issued Dec 2021, no final | 3156 Clay St | revision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993Details
revision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993 | |
| May 14, 2021 | Completed final sign-off Aug 2024 | 72 Longview Ct | modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyardDetails
modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyard | $48,000 |