Permit GraphShortlistSan Francisco building permits since 2000

Deleon Builders Inc

Contractor license
1055007
State license record
Based in
Novato
On San Francisco permits
Aug 2017 to Aug 2026
Last 24 months
12 permits filed

55 permits since 2000: 38 completed, 7 in progress, 8 never finaled, 2 expired or cancelled.

Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllRoof deck 2Deck 3Stairs 3Kitchen remodel 19Bathroom remodel 28

3 stairs permits: 2 completed, 1 never finaled. Typically 169 days from filing to permit and 480 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 16, 2024Completed
final sign-off Jan 2025
1515 Waller Stprop h: change of use of (e) 1st fl commercial space from dry cleaner to yoga studio. add new wet bar. correct all restroom accessibility issues. remove (e) stair and door to non-complying storage.add mechanical closet below existing stair. install power door operator and actuators at bldg entrance.
Details
Permit
202401164001
Status
complete
Filed
Jan 16, 2024
Permit issued
Jul 3, 2024
Final sign-off
Jan 8, 2025
Address
1515 Waller St

prop h: change of use of (e) 1st fl commercial space from dry cleaner to yoga studio. add new wet bar. correct all restroom accessibility issues. remove (e) stair and door to non-complying storage.add mechanical closet below existing stair. install power door operator and actuators at bldg entrance.

Open the permit page

Sep 20, 2021Never finaled
issued Dec 2021, no final
3156 Clay Strevision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993
Details
Permit
202109208781
Status
issued
Filed
Sep 20, 2021
Permit issued
Dec 7, 2021
Address
3156 Clay St

revision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993

Open the permit page

May 14, 2021Completed
final sign-off Aug 2024
72 Longview Ctmodifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyard
Details
Permit
202105140378
Status
complete
Filed
May 14, 2021
Permit issued
Jul 6, 2022
Final sign-off
Aug 15, 2024
Declared cost
$48,000
Address
72 Longview Ct

modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyard

Open the permit page

$48,000