Back to kitchen remodel contractors
De Well Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to Dec 2024
- Last 24 months
- 1 permit filed
88 permits since 2000: 72 completed, 4 in progress, 4 never finaled, 8 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
31 kitchen remodel permits: 27 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2024 | Completed final sign-off Feb 2026 | 1634 28th Av | adding a kitchenette, 2 bedrooms, 2 bathrooms, and a family room on 1/f, with a tankless water heate, 2 furnaces, and relocated laundry. 2/f includes convering 1 bedroom into 2 and remodeling the kitchen. no front facade or structural changes under this permit.Details
adding a kitchenette, 2 bedrooms, 2 bathrooms, and a family room on 1/f, with a tankless water heate, 2 furnaces, and relocated laundry. 2/f includes convering 1 bedroom into 2 and remodeling the kitchen. no front facade or structural changes under this permit. | $120,000 |
| Mar 3, 2023 | Completed final sign-off May 2023 | 655 Geneva Av | replace existing kitchen cabinets and countertop. kitchen remodel in kindDetails
replace existing kitchen cabinets and countertop. kitchen remodel in kind | $18,000 |
| Nov 29, 2022 | Completed final sign-off Apr 2023 | 366 Mangels Av | remodel (e) kitchen and (2) (e) bathrooms.Details
remodel (e) kitchen and (2) (e) bathrooms. | $50,000 |
| Sep 12, 2020 | Completed final sign-off Sep 2021 | 319 Detroit St | 1st fl adding family room, laundry, bathroom & 2 bedrooms; 2nd fl relocate (e) kitchen & bathroom, add one 3-fixture bathroom, powder room & den.Details
1st fl adding family room, laundry, bathroom & 2 bedrooms; 2nd fl relocate (e) kitchen & bathroom, add one 3-fixture bathroom, powder room & den. | $10,000 |
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 328 Phelan Av | 1)construct 2 bedrooms, 2 full bath rooms, & family room at ground floor. 2)relocate extg kitchen, bathroom. construct 1 new bathroom. rebuilt interior stair and upgrade partial ceiling framing at 2nd floor. 3)re-built extg deck with staircase at rear of bldg. (size aprox 9'-6" x 7'-6")Details
1)construct 2 bedrooms, 2 full bath rooms, & family room at ground floor. 2)relocate extg kitchen, bathroom. construct 1 new bathroom. rebuilt interior stair and upgrade partial ceiling framing at 2nd floor. 3)re-built extg deck with staircase at rear of bldg. (size aprox 9'-6" x 7'-6") | $87,000 |
| Mar 14, 2017 | Completed final sign-off Nov 2017 | 335 Flood Av | add 2 full baths, 2 bedrms, family rm, mud rm & storage; add int staircase btwn 1st & 2nd flr; infill (e) lightwell @ east side of property. combine 2 bedrm @ rear of bldg into 1 master w/w/c & full bath, relocate (e) full bath, remodel kitchen, add 1 powder rm.Details
add 2 full baths, 2 bedrms, family rm, mud rm & storage; add int staircase btwn 1st & 2nd flr; infill (e) lightwell @ east side of property. combine 2 bedrm @ rear of bldg into 1 master w/w/c & full bath, relocate (e) full bath, remodel kitchen, add 1 powder rm. | $85,000 |
| Jan 5, 2017 | Expired or cancelled expired Dec 2024 | 282 Urbano Dr | revision to pa 2015-0924-8027, re-configure interior bathroom & kitchen layout per plan. re-configure interior bathroom & closets layout per planDetails
revision to pa 2015-0924-8027, re-configure interior bathroom & kitchen layout per plan. re-configure interior bathroom & closets layout per plan | |
| Mar 15, 2016 | Completed final sign-off Oct 2016 | 527 Woolsey St | infill (e) lightwell on 2nd floor per plan, add 2 full bathrooms, 2 bedrooms and mudroom on 1st floor; remodel (e) kitchen & (e) full bath on 2nd floor; turn (e) dining room into 1 bed & full bath on 2nd floor.Details
infill (e) lightwell on 2nd floor per plan, add 2 full bathrooms, 2 bedrooms and mudroom on 1st floor; remodel (e) kitchen & (e) full bath on 2nd floor; turn (e) dining room into 1 bed & full bath on 2nd floor. | $70,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 87 Navajo Av | remodel existing 1st flr bathroom, remodel (e) kitchen, remove unused fire place, replace kitchen and bathroom in-kind.Details
remodel existing 1st flr bathroom, remodel (e) kitchen, remove unused fire place, replace kitchen and bathroom in-kind. | $19,000 |
| Sep 24, 2015 | Expired or cancelled expired Dec 2024 | 282 Urbano Dr | convert (e) sitting room to bedroom; (e) bath & toilet to be relocated; add full bath ground floor; (e) stair to be relocated; (e) kitchen to be remodeled; interior unsound gypsum board where needed install r-13Details
convert (e) sitting room to bedroom; (e) bath & toilet to be relocated; add full bath ground floor; (e) stair to be relocated; (e) kitchen to be remodeled; interior unsound gypsum board where needed install r-13 | $28,000 |
| Jan 14, 2015 | Completed final sign-off Sep 2015 | 179 Flood Av | add 2 bedrooms, family room, 2 bathroom & laundry room on 1st floor. add 1 bedroom & 1 bathroom on 2nd floor. remodel kitchen, family room, living room & (e) bedroom on 2nd floor. remodel interior stair.Details
add 2 bedrooms, family room, 2 bathroom & laundry room on 1st floor. add 1 bedroom & 1 bathroom on 2nd floor. remodel kitchen, family room, living room & (e) bedroom on 2nd floor. remodel interior stair. | $120,000 |
| Jan 21, 2014 | Completed final sign-off Oct 2014 | 391 Staples Av | add 2 bedrooms, great room and bath on gr fl. new bedroom and kitchen and bath remodel on 2nd fl. add dormer and bath on 3rd flDetails
add 2 bedrooms, great room and bath on gr fl. new bedroom and kitchen and bath remodel on 2nd fl. add dormer and bath on 3rd fl | $50,000 |
| Oct 9, 2013 | Completed final sign-off Oct 2013 | 301 Nevada St | revision to app#201205220948. at basement change exercise room to bedroom and laundry room to den. move washer and dryer to garage. move water heater to back yard. 2nd floor: to restore front door and windows to extg. rearrange bath room. closet & kitchen. eliminate den.Details
revision to app#201205220948. at basement change exercise room to bedroom and laundry room to den. move washer and dryer to garage. move water heater to back yard. 2nd floor: to restore front door and windows to extg. rearrange bath room. closet & kitchen. eliminate den. | $100 |
| Sep 18, 2013 | Completed final sign-off Jan 2014 | 315 Detroit St | replace (e) kitchen cabinets and countertop. and remodel 1/f bathroom. to comply with cec 150(k) 8 & 10Details
replace (e) kitchen cabinets and countertop. and remodel 1/f bathroom. to comply with cec 150(k) 8 & 10 | $13,000 |
| Sep 18, 2013 | Completed final sign-off Jun 2014 | 721 32nd Av | 1/f - replace (e) kitchen cabinet, countertop, to comply with cec 150(k) 8; replace 8 windows and 3 sliding doors, all at rear of bldg, u factor not > .4; put new cement sidings at rear of bldg; to comply with complaint 201309342.Details
1/f - replace (e) kitchen cabinet, countertop, to comply with cec 150(k) 8; replace 8 windows and 3 sliding doors, all at rear of bldg, u factor not > .4; put new cement sidings at rear of bldg; to comply with complaint 201309342. | $19,000 |
| May 13, 2013 | Completed final sign-off Jun 2014 | 534 Woolsey St | 1)add one bedroom, one bathroom, laundry room and game room in 1st floor per plan. 2)add one bathroom, kitchen and bathroom remodel on 2nd floor per plan.Details
1)add one bedroom, one bathroom, laundry room and game room in 1st floor per plan. 2)add one bathroom, kitchen and bathroom remodel on 2nd floor per plan. | $78,000 |
| Apr 8, 2013 | Completed final sign-off Feb 2015 | 838 33rd Av | add 1 bathroom & utility room on 1st floor pee plan, add 1 bedroom & 1 bathroom on 3rd floor per plan, convert (e) powder room to new bathroom & kitchen remodel on 3rd floor per planDetails
add 1 bathroom & utility room on 1st floor pee plan, add 1 bedroom & 1 bathroom on 3rd floor per plan, convert (e) powder room to new bathroom & kitchen remodel on 3rd floor per plan | $50,000 |
| Feb 1, 2013 | Completed final sign-off Apr 2013 | 1265 Alemany Bl | remodel existing kitchen. replace kitchen cabinets, countertop, window at kitchen. same size.Details
remodel existing kitchen. replace kitchen cabinets, countertop, window at kitchen. same size. | $13,000 |
| Dec 29, 2011 | Completed final sign-off Jul 2012 | 50 Del Monte St | replace kitchen cabinets,kitchen sink and faucet. replace tile counter top with granite counter top.Details
replace kitchen cabinets,kitchen sink and faucet. replace tile counter top with granite counter top. | $9,000 |
| Oct 5, 2010 | Completed final sign-off Apr 2011 | 208 Tocoloma Av | rearrange existing bathroom and add a bedroom on 1st flr, add a bedroom and rearrange existing bathroom and kitchen on 2nd flrDetails
rearrange existing bathroom and add a bedroom on 1st flr, add a bedroom and rearrange existing bathroom and kitchen on 2nd flr | $45,000 |
| Oct 5, 2010 | Expired or cancelled cancelled Jan 2026 | 208 Tocoloma Av | 1.rearranged existing bathrm and add a bedroom on 1st fl; 2.add a bedroom and rearranged existing bathroom and kitchen on 2nd fl.Details
1.rearranged existing bathrm and add a bedroom on 1st fl; 2.add a bedroom and rearranged existing bathroom and kitchen on 2nd fl. | $25,000 |
| Mar 10, 2010 | Completed final sign-off Jun 2010 | 1921 Jefferson St | replace existing kitchen cabinets and counter top, no lighting work, no change to exhaust systemDetails
replace existing kitchen cabinets and counter top, no lighting work, no change to exhaust system | $6,000 |
| Feb 12, 2010 | Completed final sign-off Jun 2010 | 501 07th Av | to comply with nov# 200927150 dated dec.4.2009 at 501- 507 7th ave. incl. guardrail at front stair, repair post and guard rail at rear stair, repair d-garafe ceiling plaster. remodel two kitchens and two bathrooms in units 505 and 507. no wall removal.Details
to comply with nov# 200927150 dated dec.4.2009 at 501- 507 7th ave. incl. guardrail at front stair, repair post and guard rail at rear stair, repair d-garafe ceiling plaster. remodel two kitchens and two bathrooms in units 505 and 507. no wall removal. | $38,000 |
| Sep 25, 2009 | Completed final sign-off Mar 2010 | 341 Molimo Dr | remodel (e) kitchen. half bathroom and laundry room at 1st floor. remodel (2) existing bathrooms. rebuild two bedroom closets. repair ceiling and wall damage. replace counter and cabinet, half bathroom on 1st floor. replace plumbing fixtures. retile floor and walls. (same for 2 bathrooms ..Details
remodel (e) kitchen. half bathroom and laundry room at 1st floor. remodel (2) existing bathrooms. rebuild two bedroom closets. repair ceiling and wall damage. replace counter and cabinet, half bathroom on 1st floor. replace plumbing fixtures. retile floor and walls. (same for 2 bathrooms .. | $46,000 |
| Jun 23, 2009 | Completed final sign-off Dec 2009 | 371 05th Av | remove wall between kitchen and dining room at 1st and 2nd floors, both units. install new 4x12 headerDetails
remove wall between kitchen and dining room at 1st and 2nd floors, both units. install new 4x12 header | $3,500 |
| Jul 23, 2008 | Completed final sign-off Aug 2008 | 3615 Mission St | work @ unit# 3619 only. comply with his nov# 200863354. repair weather proofing on siding (at rear porch) repair or replace door knobs. repair damage floor covering at kitchen. repair kitchen cabinets door, repair or replace smoke detector. repair damaged walls. patch plaster. no structural work.Details
work @ unit# 3619 only. comply with his nov# 200863354. repair weather proofing on siding (at rear porch) repair or replace door knobs. repair damage floor covering at kitchen. repair kitchen cabinets door, repair or replace smoke detector. repair damaged walls. patch plaster. no structural work. | $2,000 |
| Jun 23, 2008 | Completed final sign-off Aug 2009 | 522 Joost Av | remodel 1 kitchen and 2 bathrooms. replace two bedroom partition drywall in kind update electric, no change wall, door or windows.Details
remodel 1 kitchen and 2 bathrooms. replace two bedroom partition drywall in kind update electric, no change wall, door or windows. | $33,000 |
| Jun 10, 2008 | Completed final sign-off Mar 2009 | 346 Paris St | remodel (e) kitchen on 2nd floor in same locationDetails
remodel (e) kitchen on 2nd floor in same location | $10,000 |
| Jan 11, 2008 | Completed final sign-off Jan 2008 | 3615 Mission St | comply with nov# 200736411 dated 12-21-07. replace dry rotted board of rear exterior stairs, replace dry rotted risers of rear exterior stairs, repl dry rotted post at bottom of rear exterior stairs. patch plaster and paint in kitchen. hole in living room. less than 50% of stair & repair.Details
comply with nov# 200736411 dated 12-21-07. replace dry rotted board of rear exterior stairs, replace dry rotted risers of rear exterior stairs, repl dry rotted post at bottom of rear exterior stairs. patch plaster and paint in kitchen. hole in living room. less than 50% of stair & repair. | $2,000 |
| Dec 17, 2007 | Completed final sign-off Mar 2008 | 2275 39th Av | remodel (e) kitchen & bathroom at 2nd floor. repair living room ceiling.Details
remodel (e) kitchen & bathroom at 2nd floor. repair living room ceiling. | $15,000 |
| Dec 8, 2006 | Expired or cancelled expired Sep 2007 | 220 Mangels Av | replace (e) kitchen cabinets and counter top.Details
replace (e) kitchen cabinets and counter top. | $5,000 |