De Well Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to Dec 2024
- Last 24 months
- 1 permit filed
88 permits since 2000: 72 completed, 4 in progress, 4 never finaled, 8 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 494 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 328 Phelan Av | 1)construct 2 bedrooms, 2 full bath rooms, & family room at ground floor. 2)relocate extg kitchen, bathroom. construct 1 new bathroom. rebuilt interior stair and upgrade partial ceiling framing at 2nd floor. 3)re-built extg deck with staircase at rear of bldg. (size aprox 9'-6" x 7'-6")Details
1)construct 2 bedrooms, 2 full bath rooms, & family room at ground floor. 2)relocate extg kitchen, bathroom. construct 1 new bathroom. rebuilt interior stair and upgrade partial ceiling framing at 2nd floor. 3)re-built extg deck with staircase at rear of bldg. (size aprox 9'-6" x 7'-6") | $87,000 |
| Mar 13, 2008 | Never finaled issued Nov 2010, no final | 715 Duboce Av | remodel ground floor, add garage,reconfigure (e) interior stair between 1st & 2nd floors. restore center bay@ front facade. replace (e) decks & railing @ rear 2nd story. provide (n) windows and door @ front facade.Details
remodel ground floor, add garage,reconfigure (e) interior stair between 1st & 2nd floors. restore center bay@ front facade. replace (e) decks & railing @ rear 2nd story. provide (n) windows and door @ front facade. | $250,000 |