Block 3007, lot 018
341 Molimo Dr
- City’s use
- Single Family Residential
- Built
- 1948
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 1 bathroom
- Building
- 1,460 sq ft
- Lot
- 2,469 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2023 | Completed final sign-off Feb 2023 | 341 Molimo Dr | Cap Inc. Dba Journey Builders | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $3,800 |
| Jan 26, 2021 | Completed final sign-off May 2021 | 341 Molimo Dr | Northgate Development | removing existing deck & rebuilding deck same size.Details
removing existing deck & rebuilding deck same size. | $10,000 |
| Feb 4, 2014 | Expired or cancelled withdrawn Apr 2014 | 341 Molimo Dr | horizontal & vertical addition. add 337 sf new floor area to the rear of the existing 3-story, 2401 sf house. add a new wood stair to the exist wood deck in the back.Details
horizontal & vertical addition. add 337 sf new floor area to the rear of the existing 3-story, 2401 sf house. add a new wood stair to the exist wood deck in the back. | $50,000 | |
| Jan 7, 2010 | Completed final sign-off Mar 2011 | 341 Molimo Dr | replace windows for entire house, 12 in total, replace in kind, 4 fiberglass windows in front.Details
replace windows for entire house, 12 in total, replace in kind, 4 fiberglass windows in front. | $3,800 | |
| Sep 25, 2009 | Completed final sign-off Mar 2010 | 341 Molimo Dr | De Well Construction Inc | remodel (e) kitchen. half bathroom and laundry room at 1st floor. remodel (2) existing bathrooms. rebuild two bedroom closets. repair ceiling and wall damage. replace counter and cabinet, half bathroom on 1st floor. replace plumbing fixtures. retile floor and walls. (same for 2 bathrooms ..Details
remodel (e) kitchen. half bathroom and laundry room at 1st floor. remodel (2) existing bathrooms. rebuild two bedroom closets. repair ceiling and wall damage. replace counter and cabinet, half bathroom on 1st floor. replace plumbing fixtures. retile floor and walls. (same for 2 bathrooms .. | $46,000 |
| Jun 18, 2009 | Completed final sign-off Mar 2010 | 341 Molimo Dr | Rosemount Construction | remove portions of the dry rot damage at rear deck and rails, approx 25% replacement. repair and replace in kindDetails
remove portions of the dry rot damage at rear deck and rails, approx 25% replacement. repair and replace in kind | $4,000 |
| Aug 9, 2002 | Expired or cancelled expired Sep 2009 | 341 Molimo Dr | Standardconstr/Standardroof | reroofingDetails
reroofing | $6,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.