Back to kitchen remodel contractors
David Jone
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Aug 2026
- Last 24 months
- 1 permit filed
60 permits since 2000: 51 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 17 completed, 2 never finaled. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2024 | Completed final sign-off Feb 2025 | 1433 23rd Av | remodel kitchen and bath, add 1/2 bath and lights in each unit. add 2 bedrooms, full bath, kitchenette w 2 burner stove, no oven, hood, sink 1st fl. upgrade elec and plumbing systemDetails
remodel kitchen and bath, add 1/2 bath and lights in each unit. add 2 bedrooms, full bath, kitchenette w 2 burner stove, no oven, hood, sink 1st fl. upgrade elec and plumbing system | $150,000 |
| Apr 26, 2022 | Completed final sign-off Sep 2022 | 1135 Hyde St | unit #4: replace kitchen cabinets, tiling, kitchen floor. install shower pan. replace toilet, tiling, bathroom floor. no removal of wallsDetails
unit #4: replace kitchen cabinets, tiling, kitchen floor. install shower pan. replace toilet, tiling, bathroom floor. no removal of walls | $18,000 |
| Jun 15, 2021 | Completed final sign-off Oct 2021 | 3839 Divisadero St | apt 101: non-structural one kitchen, one bath remodel. replace kitchen base cabinets, 9' x 5' l-shaped. replace kit.counter top; shower surround marble. replace bathroom floor & wall tiles. replace shower pan. *plumbing and electrical work by other*Details
apt 101: non-structural one kitchen, one bath remodel. replace kitchen base cabinets, 9' x 5' l-shaped. replace kit.counter top; shower surround marble. replace bathroom floor & wall tiles. replace shower pan. *plumbing and electrical work by other* | $8,000 |
| Feb 18, 2021 | Completed final sign-off Aug 2021 | 707 Stockton St | units 305 & 406: replace kitchen cabinets & countertops 76"x81", replace (11) windows. work at units 305 & 406Details
units 305 & 406: replace kitchen cabinets & countertops 76"x81", replace (11) windows. work at units 305 & 406 | $10,000 |
| Mar 12, 2020 | Never finaled issued Mar 2020, no final | 1135 Hyde St | unit #6: replace kitchen cabinets, tiling kitchen floors, replace bathtub to shower pan, tiling shower wall and floor, install new toilet. bathroom 7'x 7', kitchen 7'x 10' n/a maherDetails
unit #6: replace kitchen cabinets, tiling kitchen floors, replace bathtub to shower pan, tiling shower wall and floor, install new toilet. bathroom 7'x 7', kitchen 7'x 10' n/a maher | $18,000 |
| Aug 23, 2019 | Completed final sign-off Jun 2020 | 3839 Divisadero St | units 103 & 202: demolish kitchen counter, replace w/quartzonly, demolish bathroomn floor/wall tiles, replace w/margble, toilet, vanity, replace shower pan 5'x8'Details
units 103 & 202: demolish kitchen counter, replace w/quartzonly, demolish bathroomn floor/wall tiles, replace w/margble, toilet, vanity, replace shower pan 5'x8' | $18,000 |
| Jun 26, 2019 | Completed final sign-off Oct 2019 | 3839 Divisadero St | apts 102 & 104: demolish the kitchen counter, replace with quartz. demolish the bathroom floor & wall tiles, replace with marble. replace the shower pan, electrical and plumbing work by other.Details
apts 102 & 104: demolish the kitchen counter, replace with quartz. demolish the bathroom floor & wall tiles, replace with marble. replace the shower pan, electrical and plumbing work by other. | $1,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 1798 Grove St | replace kitchen cabinet & counter top, floor tile. replace bath tub to shower pan, wall & floor tile, bathroom sink & toilet. no structural work. no framing modification.Details
replace kitchen cabinet & counter top, floor tile. replace bath tub to shower pan, wall & floor tile, bathroom sink & toilet. no structural work. no framing modification. | $20,000 |
| May 2, 2019 | Completed final sign-off Sep 2019 | 3839 Divisadero St | unit#302 replace kitchen counter l-shaped tiles with 5'x7' quartz top 7'x10' replace bathroom floor & wall marble 5 1/2x8' plumbing & electrical under separate permitsDetails
unit#302 replace kitchen counter l-shaped tiles with 5'x7' quartz top 7'x10' replace bathroom floor & wall marble 5 1/2x8' plumbing & electrical under separate permits | $20,000 |
| Feb 27, 2019 | Completed final sign-off Jun 2019 | 1135 Hyde St | unit #3: bathroom and kitchen remodel. replace kitchen cabinets and tile floor. replace bathtub, sink and bathroom tile floor. install new toilet. maher n/aDetails
unit #3: bathroom and kitchen remodel. replace kitchen cabinets and tile floor. replace bathtub, sink and bathroom tile floor. install new toilet. maher n/a | $15,000 |
| Jul 6, 2018 | Completed final sign-off Jan 2019 | 908 Vallejo St | apt#1 and #2: replace kitchen cabinets. tiling, finish kitchen floorsDetails
apt#1 and #2: replace kitchen cabinets. tiling, finish kitchen floors | $16,000 |
| May 3, 2018 | Completed final sign-off May 2018 | 1453 20th Av | to comply with notice of violation # 201861151 and 201861331. replace kitchen countertop, cabinets, sink, bathtub, wash basin in kind. no structural work. replace kitchen floor tiles and bathroom wall and floor tilesDetails
to comply with notice of violation # 201861151 and 201861331. replace kitchen countertop, cabinets, sink, bathtub, wash basin in kind. no structural work. replace kitchen floor tiles and bathroom wall and floor tiles | $8,500 |
| Jan 23, 2018 | Completed final sign-off May 2018 | 3839 Divisadero St | unit 204: replace the kitchen counter. replace bathroom floor and wall tiles. plumbing & electrical work by others. kitchen bath remodel in kind. maher naDetails
unit 204: replace the kitchen counter. replace bathroom floor and wall tiles. plumbing & electrical work by others. kitchen bath remodel in kind. maher na | $4,000 |
| Oct 23, 2017 | Completed final sign-off Feb 2018 | 3839 Divisadero St | work in unit #206: replace the lower section base cabinets in kitchen. 5'x8' l-shaped. replace replace bathroom floor and wall tiles. plumbing and electrical work by others.Details
work in unit #206: replace the lower section base cabinets in kitchen. 5'x8' l-shaped. replace replace bathroom floor and wall tiles. plumbing and electrical work by others. | $5,000 |
| Jul 27, 2017 | Completed final sign-off Oct 2017 | 1135 Hyde St | #2: kitchen & bathroom remodel. new cabinets, fixtures, repacles, windows (kitchen & bathroom - non-street facing). to comply with nov#201795901 & 201794501Details
#2: kitchen & bathroom remodel. new cabinets, fixtures, repacles, windows (kitchen & bathroom - non-street facing). to comply with nov#201795901 & 201794501 | $20,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 3839 Divisadero St | unit # 304 ,replace bathroom wall & floor tiles, replace kitchen counter top 7x6 l shapedDetails
unit # 304 ,replace bathroom wall & floor tiles, replace kitchen counter top 7x6 l shaped | $5,000 |
| Sep 30, 2016 | Completed final sign-off Dec 2016 | 3839 Divisadero St | apt #301 - replace shower tile with marble slab only not full remodel. replace kitchen countertop & base cabinets only.Details
apt #301 - replace shower tile with marble slab only not full remodel. replace kitchen countertop & base cabinets only. | $2,500 |
| Jul 14, 2016 | Completed final sign-off Nov 2016 | 1959 Taylor St | kitchen & bathroom remodeling: kitchen: r/r cabinets, floor covering, fixtures. install hood. bathroom: r/r tub, sink and cabinet, exhaust fan, tiling wall and floor.Details
kitchen & bathroom remodeling: kitchen: r/r cabinets, floor covering, fixtures. install hood. bathroom: r/r tub, sink and cabinet, exhaust fan, tiling wall and floor. | $12,000 |
| Dec 20, 2013 | Completed final sign-off Feb 2017 | 270 17th Av | horizontal extension at gr floor behind garage below 2nd fl sunroom. stays within building envelope. new master bathroom, two bathrooms, new family room. renovate kitchens & secondary powder rm & two bathrooms. upgrade electrical panel.Details
horizontal extension at gr floor behind garage below 2nd fl sunroom. stays within building envelope. new master bathroom, two bathrooms, new family room. renovate kitchens & secondary powder rm & two bathrooms. upgrade electrical panel. | $198,000 |