Back to kitchen remodel contractors
David Adam Iseman
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Feb 2019
- Last 24 months
- 0 permits filed
43 permits since 2000: 29 completed, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 9 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2019 | Completed final sign-off Aug 2019 | 932 Hampshire St | remodel (1) kitchen and (1) bathroomDetails
remodel (1) kitchen and (1) bathroom | $35,000 |
| Sep 2, 2016 | Completed final sign-off May 2017 | 344 Hermann St | e kitchen remodel and relocate garage beam supports per plans. no change to exterior nor upper floor/roofDetails
e kitchen remodel and relocate garage beam supports per plans. no change to exterior nor upper floor/roof | $10,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 24 Liberty St | 2nd floor: 1 kitchen, 2 bathrooms cosmetic remodeling. replacement in kind.Details
2nd floor: 1 kitchen, 2 bathrooms cosmetic remodeling. replacement in kind. | $28,000 |
| Sep 2, 2015 | Never finaled issued Sep 2015, no final | 3772 26th St | both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f.Details
both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f. | $125,000 |
| Oct 14, 2014 | Completed final sign-off Apr 2015 | 97 Delta St | 2 bathrooms, 1 kitchen, new plumbing, all new electrical, new siding and new windows (18). no change in layout. re-siding in-kind shiplap at lower and shingles at top; windows in front replacement in-kind wood with ogee lugs. no mechanical under this permitDetails
2 bathrooms, 1 kitchen, new plumbing, all new electrical, new siding and new windows (18). no change in layout. re-siding in-kind shiplap at lower and shingles at top; windows in front replacement in-kind wood with ogee lugs. no mechanical under this permit | $100,000 |
| Jun 11, 2014 | Completed final sign-off Apr 2017 | 645 Bowdoin St | replace in kind, replacement of fire damaged framing at roof and south exterior wall, replacement of damaged wiring throughout house, repl of damaged bathrms (2) kitchen replace siding 1300 sq.ft.Details
replace in kind, replacement of fire damaged framing at roof and south exterior wall, replacement of damaged wiring throughout house, repl of damaged bathrms (2) kitchen replace siding 1300 sq.ft. | $190,000 |
| Oct 26, 2012 | Expired or cancelled cancelled Jan 2026 | 4789 19th St | kitchen remodel, bathroom addition on 2nd flDetails
kitchen remodel, bathroom addition on 2nd fl | $60,000 |
| May 9, 2011 | Completed final sign-off Dec 2011 | 2667 Greenwich St | remodel of 2 units on 2nd & 3rd floor - adding one bath on both units. remodel kitchen & existing bath as per plan includes structural in esiting garage. replace iwndow @ bathroom (not visible from street). upgrade electric, relocate 2 furnaces & 2 water heaters.Details
remodel of 2 units on 2nd & 3rd floor - adding one bath on both units. remodel kitchen & existing bath as per plan includes structural in esiting garage. replace iwndow @ bathroom (not visible from street). upgrade electric, relocate 2 furnaces & 2 water heaters. | $230,000 |
| Oct 28, 2010 | Completed final sign-off Jan 2012 | 2821 Vallejo St | remodel kitchen and 3 bathrooms. repair dryrot and termite at rear of building, repair (e) damage at roof includes reframing, approx 575 sqft. add lightings.Details
remodel kitchen and 3 bathrooms. repair dryrot and termite at rear of building, repair (e) damage at roof includes reframing, approx 575 sqft. add lightings. | $65,000 |
| Mar 16, 2010 | Completed final sign-off Mar 2010 | 270 Parnassus Av | to comply with physical inspection report cc-5562 of 4/06/09 on lower unit# 270 and upper unit# 272. reference pa# 2007.06.14.3851 for work on ground fl and 2nd fl kitchen remodel, and pa# 2009.10.06.8365 for work on ground floor new full bath.Details
to comply with physical inspection report cc-5562 of 4/06/09 on lower unit# 270 and upper unit# 272. reference pa# 2007.06.14.3851 for work on ground fl and 2nd fl kitchen remodel, and pa# 2009.10.06.8365 for work on ground floor new full bath. | $20,000 |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 3535 Fillmore St | unit #201-cosmetic kitchen & bathroom face lift. new cabinets installed, new bathroom fixtures & new tiles. no structural work or wall relocation. new lighting at unit #201. no door work & no windows work on this permitDetails
unit #201-cosmetic kitchen & bathroom face lift. new cabinets installed, new bathroom fixtures & new tiles. no structural work or wall relocation. new lighting at unit #201. no door work & no windows work on this permit | $13,000 |
| Dec 19, 2005 | Completed final sign-off Apr 2006 | 415 30th St | replace kitchen cabinets, new counter top.Details
replace kitchen cabinets, new counter top. | $800 |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 560 Hill St | remove 2 cabinets in kitchen area. patch wall.Details
remove 2 cabinets in kitchen area. patch wall. | $100 |