David Adam Iseman
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Feb 2019
- Last 24 months
- 0 permits filed
43 permits since 2000: 29 completed, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2019 | Completed final sign-off Aug 2019 | 932 Hampshire St | remodel (1) kitchen and (1) bathroomDetails
remodel (1) kitchen and (1) bathroom | $35,000 |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 1541 Filbert St | dryrot repair. removal of old stucco & water proofing and replacement, common area only. 180 sq ft airwell (light well)Details
dryrot repair. removal of old stucco & water proofing and replacement, common area only. 180 sq ft airwell (light well) | $25,000 |
| Jun 8, 2017 | Never finaled issued Jun 2017, no final | 23 Liberty St | foundation replacement - 160 linear feetDetails
foundation replacement - 160 linear feet | $70,000 |
| Oct 18, 2016 | Completed final sign-off May 2017 | 344 Hermann St | rev. to pa#201609026774 as per plan, turning existing bathtub 90 degress in existing bathroom, new plumbing, fan & 3 lights.Details
rev. to pa#201609026774 as per plan, turning existing bathtub 90 degress in existing bathroom, new plumbing, fan & 3 lights. | |
| Sep 2, 2016 | Completed final sign-off May 2017 | 344 Hermann St | e kitchen remodel and relocate garage beam supports per plans. no change to exterior nor upper floor/roofDetails
e kitchen remodel and relocate garage beam supports per plans. no change to exterior nor upper floor/roof | $10,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 24 Liberty St | 2nd floor: 1 kitchen, 2 bathrooms cosmetic remodeling. replacement in kind.Details
2nd floor: 1 kitchen, 2 bathrooms cosmetic remodeling. replacement in kind. | $28,000 |
| Sep 2, 2015 | Never finaled issued Sep 2015, no final | 3772 26th St | both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f.Details
both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f. | $125,000 |
| Jan 27, 2015 | Completed final sign-off Apr 2015 | 924 Rutland St | install one new bathroom built in the garage - 1 toilet, 1 shower tub combo, 1 vanity, new plumbing for new bathroom.Details
install one new bathroom built in the garage - 1 toilet, 1 shower tub combo, 1 vanity, new plumbing for new bathroom. | $14,000 |
| Oct 14, 2014 | Completed final sign-off Apr 2015 | 97 Delta St | 2 bathrooms, 1 kitchen, new plumbing, all new electrical, new siding and new windows (18). no change in layout. re-siding in-kind shiplap at lower and shingles at top; windows in front replacement in-kind wood with ogee lugs. no mechanical under this permitDetails
2 bathrooms, 1 kitchen, new plumbing, all new electrical, new siding and new windows (18). no change in layout. re-siding in-kind shiplap at lower and shingles at top; windows in front replacement in-kind wood with ogee lugs. no mechanical under this permit | $100,000 |
| Jun 11, 2014 | Completed final sign-off Apr 2017 | 645 Bowdoin St | replace in kind, replacement of fire damaged framing at roof and south exterior wall, replacement of damaged wiring throughout house, repl of damaged bathrms (2) kitchen replace siding 1300 sq.ft.Details
replace in kind, replacement of fire damaged framing at roof and south exterior wall, replacement of damaged wiring throughout house, repl of damaged bathrms (2) kitchen replace siding 1300 sq.ft. | $190,000 |
| Mar 14, 2014 | Never finaled issued Mar 2014, no final | 565 Ortega St | siding replacement, 250 sq.ft. not visible to the street, work to be completed is at trelish in rear yard/patio and around window over trelishDetails
siding replacement, 250 sq.ft. not visible to the street, work to be completed is at trelish in rear yard/patio and around window over trelish | $4,000 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 97 Delta St | siding replacement where needed at back of house approx. 200 s.f. of area. no structural work and no stud replacement. 9" redwood siding nailed with 2-10d galvanized nails at each stud over 1 layer of tyvek waterproofing.Details
siding replacement where needed at back of house approx. 200 s.f. of area. no structural work and no stud replacement. 9" redwood siding nailed with 2-10d galvanized nails at each stud over 1 layer of tyvek waterproofing. | $7,000 |
| Oct 26, 2012 | Expired or cancelled cancelled Jan 2026 | 4789 19th St | kitchen remodel, bathroom addition on 2nd flDetails
kitchen remodel, bathroom addition on 2nd fl | $60,000 |
| Feb 9, 2012 | Completed final sign-off Aug 2012 | 145 Brewster St | reinforce existing conc. retaining wall along west property line wall.Details
reinforce existing conc. retaining wall along west property line wall. | $25,000 |
| Nov 4, 2011 | Completed final sign-off Aug 2012 | 145 Brewster St | removal of unpermitted work in basement & addition of 2 bedroom, 2 bathrooms & family room in unconditioned basement. addition of interior stairs, remodeling of 2nd floor. new deck to stairs in rear yard, less than 30" above grade. foundation & stucco repairs. replacement of furnace & dhw systemDetails
removal of unpermitted work in basement & addition of 2 bedroom, 2 bathrooms & family room in unconditioned basement. addition of interior stairs, remodeling of 2nd floor. new deck to stairs in rear yard, less than 30" above grade. foundation & stucco repairs. replacement of furnace & dhw system | $75,000 |
| Aug 3, 2011 | Completed final sign-off Jan 2012 | 2821 Vallejo St | re-evaluation & additional work permit, add value to issued pa#201010283914. repair (e) wall ceilings after electric work is complete - work all in kind. (see pa#201010283914 for work scope).Details
re-evaluation & additional work permit, add value to issued pa#201010283914. repair (e) wall ceilings after electric work is complete - work all in kind. (see pa#201010283914 for work scope). | $78,000 |
| Jul 21, 2011 | Never finaled issued Jul 2011, no final | 2667 Greenwich St | revision to pa #2011-0504-5625 change door/window to just a door.Details
revision to pa #2011-0504-5625 change door/window to just a door. | |
| May 9, 2011 | Completed final sign-off Dec 2011 | 2667 Greenwich St | remodel of 2 units on 2nd & 3rd floor - adding one bath on both units. remodel kitchen & existing bath as per plan includes structural in esiting garage. replace iwndow @ bathroom (not visible from street). upgrade electric, relocate 2 furnaces & 2 water heaters.Details
remodel of 2 units on 2nd & 3rd floor - adding one bath on both units. remodel kitchen & existing bath as per plan includes structural in esiting garage. replace iwndow @ bathroom (not visible from street). upgrade electric, relocate 2 furnaces & 2 water heaters. | $230,000 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 2835 Folsom St | #2833 & #2835- repair work @ 2nd & 3rd floor leveling of 2 small 6'x8' back laundry rooms and repair 4 pieces of sheetrock 4'x4' to be replaced, taped, mudded and painted. all work in kind. no change to doors, windows and wall, no change to lighting.Details
#2833 & #2835- repair work @ 2nd & 3rd floor leveling of 2 small 6'x8' back laundry rooms and repair 4 pieces of sheetrock 4'x4' to be replaced, taped, mudded and painted. all work in kind. no change to doors, windows and wall, no change to lighting. | $1,000 |
| Feb 3, 2011 | Completed final sign-off Jan 2012 | 2821 Vallejo St | revision to 201010283914, rebuild retaining wall at same location as existing and new 4x8 header df#1 or better over existing bedroom doorway @2nd floor.Details
revision to 201010283914, rebuild retaining wall at same location as existing and new 4x8 header df#1 or better over existing bedroom doorway @2nd floor. | $5,300 |
| Oct 28, 2010 | Completed final sign-off Jan 2012 | 2821 Vallejo St | remodel kitchen and 3 bathrooms. repair dryrot and termite at rear of building, repair (e) damage at roof includes reframing, approx 575 sqft. add lightings.Details
remodel kitchen and 3 bathrooms. repair dryrot and termite at rear of building, repair (e) damage at roof includes reframing, approx 575 sqft. add lightings. | $65,000 |
| Aug 5, 2010 | Completed final sign-off Oct 2010 | 2998 Washington St | additional work on pa# 2010-0526-3215-install new light fixtures in new ceiling area, repair (e) heating ductsDetails
additional work on pa# 2010-0526-3215-install new light fixtures in new ceiling area, repair (e) heating ducts | $4,800 |
| Jun 21, 2010 | Completed final sign-off Oct 2010 | 117 Castro St | stucco repair, side of house, 400 sq ftDetails
stucco repair, side of house, 400 sq ft | $1,000 |
| Jun 9, 2010 | Completed final sign-off Nov 2010 | 337 Douglass St | (n) footing for porch-additional work for permit #201005263616. install 5/8" dia.x12" w/ss washer with #4 rebar. rebuild porch in-kind, new footing 6"x18 "l" @ front.Details
(n) footing for porch-additional work for permit #201005263616. install 5/8" dia.x12" w/ss washer with #4 rebar. rebuild porch in-kind, new footing 6"x18 "l" @ front. | $1,500 |
| May 26, 2010 | Completed final sign-off Mar 2011 | 2200 Broderick St | build new disable bathroom includes plumbing, electrical. reframe all new locations & repair bathroom floor. change of use from retail (m) to offices (b)Details
build new disable bathroom includes plumbing, electrical. reframe all new locations & repair bathroom floor. change of use from retail (m) to offices (b) | $25,000 |
| May 26, 2010 | Completed final sign-off Nov 2010 | 337 Douglass St | bolt down foundation plate with 5/8 x 10" all thread using sq washer & bolts, hot dip galv-approx 40 bolts. also repair (e) front porch, dry rotDetails
bolt down foundation plate with 5/8 x 10" all thread using sq washer & bolts, hot dip galv-approx 40 bolts. also repair (e) front porch, dry rot | $2,500 |
| Mar 16, 2010 | Completed final sign-off Mar 2010 | 270 Parnassus Av | to comply with physical inspection report cc-5562 of 4/06/09 on lower unit# 270 and upper unit# 272. reference pa# 2007.06.14.3851 for work on ground fl and 2nd fl kitchen remodel, and pa# 2009.10.06.8365 for work on ground floor new full bath.Details
to comply with physical inspection report cc-5562 of 4/06/09 on lower unit# 270 and upper unit# 272. reference pa# 2007.06.14.3851 for work on ground fl and 2nd fl kitchen remodel, and pa# 2009.10.06.8365 for work on ground floor new full bath. | $20,000 |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 3535 Fillmore St | unit #201-cosmetic kitchen & bathroom face lift. new cabinets installed, new bathroom fixtures & new tiles. no structural work or wall relocation. new lighting at unit #201. no door work & no windows work on this permitDetails
unit #201-cosmetic kitchen & bathroom face lift. new cabinets installed, new bathroom fixtures & new tiles. no structural work or wall relocation. new lighting at unit #201. no door work & no windows work on this permit | $13,000 |
| Jan 12, 2010 | Completed final sign-off Jan 2013 | 2994 Folsom St | sheetrock patching, broken glass replacement, lock replacement comply with violations report, move water heater to basement. separate electric meter for storefront (aka 3200 26th st-commercial tenant). comply with his nov 200988361 dated 1-29-09. field verify that paths of egress are functional.Details
sheetrock patching, broken glass replacement, lock replacement comply with violations report, move water heater to basement. separate electric meter for storefront (aka 3200 26th st-commercial tenant). comply with his nov 200988361 dated 1-29-09. field verify that paths of egress are functional. | $4,000 |
| Dec 3, 2009 | Completed final sign-off Mar 2010 | 3591 Jackson St | remove and replace shingle siding and dryrot wood. only area at front area at front stair and garage. include paint new stair rail at 36". partial extg.8 lenial ft new deck rail at 42" partial extg. no structural workDetails
remove and replace shingle siding and dryrot wood. only area at front area at front stair and garage. include paint new stair rail at 36". partial extg.8 lenial ft new deck rail at 42" partial extg. no structural work | $5,000 |
| Oct 6, 2009 | Completed final sign-off Mar 2010 | 270 Parnassus Av | ground floor remove closet, making a half bath into a full bath. reference #2007-06-14-3851.Details
ground floor remove closet, making a half bath into a full bath. reference #2007-06-14-3851. | $800 |
| Oct 1, 2009 | Expired or cancelled expired Apr 2013 | 5172 03rd St | repair cracked cement footing, sheerwall, siding, painting, replace 4 doors and trim at rear storage structure, on the right to be repair.Details
repair cracked cement footing, sheerwall, siding, painting, replace 4 doors and trim at rear storage structure, on the right to be repair. | $14,000 |
| Sep 4, 2009 | Completed final sign-off Sep 2009 | 62 Sussex St | replacement of dry rotted siding & some studs at front stairs-15x12Details
replacement of dry rotted siding & some studs at front stairs-15x12 | $1,500 |
| Sep 22, 2008 | Completed final sign-off Dec 2008 | 667 Los Palmos Dr | revise 200808280256. additional scope of work- replace in kind w/ new stucco applicable . replace (e) sliding door w/ new 5'x6'. 250 sf of stucco work (approx).Details
revise 200808280256. additional scope of work- replace in kind w/ new stucco applicable . replace (e) sliding door w/ new 5'x6'. 250 sf of stucco work (approx). | $8,000 |
| Aug 28, 2008 | Completed final sign-off Dec 2008 | 667 Los Palmos Dr | remove and replace damaged deck as needed per planDetails
remove and replace damaged deck as needed per plan | $12,500 |
| Dec 19, 2005 | Completed final sign-off Apr 2006 | 415 30th St | replace kitchen cabinets, new counter top.Details
replace kitchen cabinets, new counter top. | $800 |
| Aug 31, 2005 | Expired or cancelled expired Dec 2006 | 1070 Folsom St | rev. to (e) pa#2004/11/23/9954 - add (1) door to storage spaceDetails
rev. to (e) pa#2004/11/23/9954 - add (1) door to storage space | $4,000 |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 560 Hill St | remove 2 cabinets in kitchen area. patch wall.Details
remove 2 cabinets in kitchen area. patch wall. | $100 |
| Mar 30, 2005 | Expired or cancelled expired Feb 2007 | 300 03rd St | cabinets, tile, cabinet lighting, 3 recess flou lights, carpeets, baseborad bathtub replace by showeDetails
cabinets, tile, cabinet lighting, 3 recess flou lights, carpeets, baseborad bathtub replace by showe | $20,000 |
| Sep 30, 2004 | Never finaled issued Sep 2004, no final | 561 Hill St | repair existing stair in front of the bldgn, repair work is less than 50 percent of existingDetails
repair existing stair in front of the bldgn, repair work is less than 50 percent of existing | $3,000 |
| Feb 27, 2004 | Completed final sign-off Dec 2015 | 345 Frederick St | rev. to pa#2004/02/02/5317 (add new door per plans)Details
rev. to pa#2004/02/02/5317 (add new door per plans) | $1,200 |
| Feb 2, 2004 | Expired or cancelled expired Dec 2015 | 345 Frederick St | renew expired pa#2001/03/06/3579 for final inspectionDetails
renew expired pa#2001/03/06/3579 for final inspection | |
| Sep 4, 2003 | Expired or cancelled expired Dec 2012 | 100 Broderick St | replace cabinets, paint preparation.Details
replace cabinets, paint preparation. | $7,000 |