Back to kitchen remodel contractors
Daniel Yue Yan Huang
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Jan 2025
- Last 24 months
- 3 permits filed
35 permits since 2000: 33 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2025 | Completed final sign-off Jun 2025 | 1150 Vicente St | remove old countertop & install new countertop in kitchen.Details
remove old countertop & install new countertop in kitchen. | $4,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 2619 22nd Av | renovation on 2nd fl of single family dwelling. remodel (e) kitchen and bathroom. replace (e) sheetrock for new electrical wiring.Details
renovation on 2nd fl of single family dwelling. remodel (e) kitchen and bathroom. replace (e) sheetrock for new electrical wiring. | $38,000 |
| Dec 29, 2022 | Completed final sign-off Mar 2023 | 2678 36th Av | one kitchen and bathroom one remodel. change kitchen cabinets, countertop, and appliances in kitchen. change bathtub, sink, and toilet and change one window in bathroom (same size and location).Details
one kitchen and bathroom one remodel. change kitchen cabinets, countertop, and appliances in kitchen. change bathtub, sink, and toilet and change one window in bathroom (same size and location). | $18,000 |
| Apr 19, 2022 | Completed final sign-off Jun 2026 | 522 Paris St | comply with nov# 202288622 & 202287512: new dwelling unit (adu) per california government code section 65852.2 at 1/f, convert (e) legal room space to one new adu within (e) building footprint. new unit includes bedroom, bathroom, & kitchen.Details
comply with nov# 202288622 & 202287512: new dwelling unit (adu) per california government code section 65852.2 at 1/f, convert (e) legal room space to one new adu within (e) building footprint. new unit includes bedroom, bathroom, & kitchen. | $15,000 |
| Mar 15, 2016 | Completed final sign-off May 2016 | 4821 California St | remodel kitchen & bathroom replace cabinet & counter, tile on floor in kitchen replace tile on walls and floor, replace sink & toilet in bathroomDetails
remodel kitchen & bathroom replace cabinet & counter, tile on floor in kitchen replace tile on walls and floor, replace sink & toilet in bathroom | $8,000 |
| Mar 3, 2015 | Completed final sign-off Apr 2015 | 304 Holloway Av | unit #c: remodel kitchen that include replace kitchen cabinets and counter top. replace kitchen floor with tile or hardwood. top level unit. no change in lighting.Details
unit #c: remodel kitchen that include replace kitchen cabinets and counter top. replace kitchen floor with tile or hardwood. top level unit. no change in lighting. | $9,000 |
| Sep 3, 2013 | Completed final sign-off Jun 2014 | 510 34th Av | remodel kitchen, bathroom on 2nd floor.Details
remodel kitchen, bathroom on 2nd floor. | $10,000 |
| Aug 22, 2013 | Completed final sign-off Jun 2014 | 510 34th Av | removel e family room at 1st fl. legalize e bath at 1st fl, new bedroom 1st fl. remodel e kitchen and bath at 2nd fl. new balcony at rear side of building. replace e window at frontDetails
removel e family room at 1st fl. legalize e bath at 1st fl, new bedroom 1st fl. remodel e kitchen and bath at 2nd fl. new balcony at rear side of building. replace e window at front | $28,000 |
| Nov 29, 2011 | Completed final sign-off Aug 2012 | 371 Bridgeview Dr | convert (e) one bath & closet into two full bath & remodel (e) kitchen on second flr. reconfigure (e) family & bedroom at 1st. flr. reconfigure & remodel (e) bathroom at 1st. flr. add storage at 1st. flr.Details
convert (e) one bath & closet into two full bath & remodel (e) kitchen on second flr. reconfigure (e) family & bedroom at 1st. flr. reconfigure & remodel (e) bathroom at 1st. flr. add storage at 1st. flr. | $26,000 |
| Nov 15, 2010 | Completed final sign-off Apr 2011 | 2168 17th Av | remodel three bathrooms & kitchen on 2nd floor. bathroom size all 5'x8' bathroom, high efficiency lighting or occupancy sensor control. kitchen, at least 50% high efficiency lighting (by wattage)Details
remodel three bathrooms & kitchen on 2nd floor. bathroom size all 5'x8' bathroom, high efficiency lighting or occupancy sensor control. kitchen, at least 50% high efficiency lighting (by wattage) | $58,190 |
| Apr 10, 2008 | Completed final sign-off Apr 2008 | 2518 San Bruno Av | work on unit#1. replace kitchen cabinets only. no structural. if lighting being changed 50% of wattage to be fluorescant.Details
work on unit#1. replace kitchen cabinets only. no structural. if lighting being changed 50% of wattage to be fluorescant. | $1,600 |