Block 2201, lot 001G
2168 17th Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 1 bathroom
- Building
- 1,350 sq ft
- Lot
- 3,600 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 14, 2018 | Completed final sign-off Jun 2018 | 2168 17th Av | to comply with nov 201853651. remove the door on the side. infill the door opening to back to originalDetails
to comply with nov 201853651. remove the door on the side. infill the door opening to back to original | $600 | |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 2168 17th Av | Hao Qiang Construction | sheetrock 1100 sq ft on ground floor, relocate subpanel & rewire bedroom, study room, laundry room.Details
sheetrock 1100 sq ft on ground floor, relocate subpanel & rewire bedroom, study room, laundry room. | $5,500 |
| Dec 30, 2010 | Completed final sign-off Apr 2011 | 2168 17th Av | Daniel Yue Yan Huang | repair stucco approx. 700 sq. ft. @ right side. front stucco repair 200 sq.ft.Details
repair stucco approx. 700 sq. ft. @ right side. front stucco repair 200 sq.ft. | $5,000 |
| Nov 23, 2010 | Completed final sign-off Apr 2011 | 2168 17th Av | Daniel Yue Yan Huang | reconfigure (e) master bathroom @ second flr. as per plan. replace right & left side of the building stucco approx.=200 sq.ft. replace 15-windows to be replacedDetails
reconfigure (e) master bathroom @ second flr. as per plan. replace right & left side of the building stucco approx.=200 sq.ft. replace 15-windows to be replaced | $16,000 |
| Nov 15, 2010 | Completed final sign-off Apr 2011 | 2168 17th Av | Daniel Yue Yan Huang | remodel three bathrooms & kitchen on 2nd floor. bathroom size all 5'x8' bathroom, high efficiency lighting or occupancy sensor control. kitchen, at least 50% high efficiency lighting (by wattage)Details
remodel three bathrooms & kitchen on 2nd floor. bathroom size all 5'x8' bathroom, high efficiency lighting or occupancy sensor control. kitchen, at least 50% high efficiency lighting (by wattage) | $58,190 |
| Mar 5, 2010 | Completed final sign-off Apr 2010 | 2168 17th Av | to comply with complaints # 20080453 (his) and 200881245 (bid-insp) to remove two illegal units at ground floor, and to legalize bedroom, study, laundry and two full bathrooms at ground floor.Details
to comply with complaints # 20080453 (his) and 200881245 (bid-insp) to remove two illegal units at ground floor, and to legalize bedroom, study, laundry and two full bathrooms at ground floor. | $33,000 | |
| Jun 18, 2002 | Completed final sign-off Jun 2002 | 2168 17th Av | for final inspection: 8411435 , 9410592 & 8411435Details
for final inspection: 8411435 , 9410592 & 8411435 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Daniel Yue Yan Huang (3), Hao Qiang Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.