Daniel Yue Yan Huang
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Jan 2025
- Last 24 months
- 3 permits filed
35 permits since 2000: 33 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 46 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2010 | Never finaled issued Mar 2010, no final | 2590 Greenwich St | replace windows in stairway im-kind, same size, same location with 45 minutes fire resistance. new metal windows. four wimdows on the right side and three windows on the left side of the buildingDetails
replace windows in stairway im-kind, same size, same location with 45 minutes fire resistance. new metal windows. four wimdows on the right side and three windows on the left side of the building | $4,500 |
| Jun 16, 2006 | Completed final sign-off Aug 2006 | 2595 27th Av | remove stucco left side of house about 100 sq ft. repair all dryrot at stairsDetails
remove stucco left side of house about 100 sq ft. repair all dryrot at stairs | $3,000 |