Damar Construction And Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jun 2026
- Last 24 months
- 10 permits filed
98 permits since 2000: 81 completed, 4 in progress, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
27 stairs permits: 24 completed, 1 in progress, 2 never finaled. Typically 40 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | In progress issued Jan 2026 | 620 02nd Av | interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck.Details
interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck. | |
| Nov 7, 2025 | Completed final sign-off May 2026 | 2618 Buchanan St | -remove (e) exterior rear stair from level 1 to 2. infill (n) deck and guard in same area.Details
-remove (e) exterior rear stair from level 1 to 2. infill (n) deck and guard in same area. | $15,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | 205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard.Details
205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard. | $95,000 |
| Jul 13, 2022 | Completed final sign-off Oct 2022 | 2618 Buchanan St | to comply with nov 202183657 (partial) replace (e) wood stair and footings at (e) rear deck in kind.Details
to comply with nov 202183657 (partial) replace (e) wood stair and footings at (e) rear deck in kind. | $20,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2024 | 2440 Washington St | replace brick foundation and excavate for new rooms down. new stair between basement * 1st level. reconstruct (e) wood entry stair.Details
replace brick foundation and excavate for new rooms down. new stair between basement * 1st level. reconstruct (e) wood entry stair. | $145,000 |
| Apr 22, 2022 | Completed final sign-off Oct 2024 | 2440 Washington St | install (n) garage & garage door @ (e) front facade. replace (e) brick foundations. excavate to create (n) habitable space below (e) bldg. expand structure below grade & <3' above (e) grade @ east side yard w/ deck. (n) stair between basement & 1st flr.Details
install (n) garage & garage door @ (e) front facade. replace (e) brick foundations. excavate to create (n) habitable space below (e) bldg. expand structure below grade & <3' above (e) grade @ east side yard w/ deck. (n) stair between basement & 1st flr. | $475,000 |
| Apr 22, 2022 | Completed final sign-off Feb 2025 | 2432 Washington St | replace (e) brick foundations and excavate to create (n) mudroom, guestroom & bathroom. construct (n) stair to 1st level. reconstruct (e) wood entry stair. (e) conc stair to remain.Details
replace (e) brick foundations and excavate to create (n) mudroom, guestroom & bathroom. construct (n) stair to 1st level. reconstruct (e) wood entry stair. (e) conc stair to remain. | $225,000 |
| Dec 29, 2021 | Completed final sign-off Jul 2022 | 2618 Buchanan St | partially comply with nov #202193657.dryrot repair @ front stair-replace steps/stringers in kind,not visible from street. separate permit to be obtain per rear deck work.Details
partially comply with nov #202193657.dryrot repair @ front stair-replace steps/stringers in kind,not visible from street. separate permit to be obtain per rear deck work. | $7,000 |
| Sep 27, 2021 | Completed final sign-off Jan 2025 | 749 Wisconsin St | new 3rd-story addition and rear expansion of existing residene. existing front facade to be retained with reconstructed stair and new garage door. new roof deck at rear of new 3rd fl.Details
new 3rd-story addition and rear expansion of existing residene. existing front facade to be retained with reconstructed stair and new garage door. new roof deck at rear of new 3rd fl. | $350,000 |
| Nov 24, 2020 | Never finaled issued Apr 2021, no final | 620 02nd Av | construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear.Details
construct new family room, guest room, laundry and bathroom. renovate (e) kitchen and add bathroom on level 3. rebuild (e) stair connecting level 1 & 2, (n) skylight and windows at rear. | $250,000 |
| Sep 10, 2020 | Completed final sign-off Jan 2025 | 749 Wisconsin St | convert (e) storage to habitable space at 1st level. (n) elevator & stairs from 1st to 2nd level. renovate 2nd level. replace (e) brick foundation & voluntary seismic upgrade. infill lightwells, not visible from street & no adjacent lightwells or windows.Details
convert (e) storage to habitable space at 1st level. (n) elevator & stairs from 1st to 2nd level. renovate 2nd level. replace (e) brick foundation & voluntary seismic upgrade. infill lightwells, not visible from street & no adjacent lightwells or windows. | $250,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2019 | 2547 18th Av | new stair between 1st and 2nd levels. renovate e bath at 2nd level, new bath 1st lvel new laundy and family rm 1st level skylight at lightwellDetails
new stair between 1st and 2nd levels. renovate e bath at 2nd level, new bath 1st lvel new laundy and family rm 1st level skylight at lightwell | $90,000 |
| Jul 15, 2016 | Completed final sign-off Jan 2025 | 2618 Buchanan St | construction of new roof deck for existing residential building. construct new interior stairway. n/a for maher ordinance.Details
construction of new roof deck for existing residential building. construct new interior stairway. n/a for maher ordinance. | $40,000 |
| Jul 1, 2016 | Completed final sign-off May 2022 | 71 Bronte St | vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallwayDetails
vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallway | $225,000 |
| Jul 14, 2015 | Completed final sign-off Aug 2015 | 561 04th Av | revision to 201410158955; change length of stair at rear yard.Details
revision to 201410158955; change length of stair at rear yard. | |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 3965 Cesar Chavez St | remodel (e) master bathroom. interior enlarge (e) closet and install new closet door. remove (e) closet and relocate (e) stair door. install new bathroom window in (e) lightwell.Details
remodel (e) master bathroom. interior enlarge (e) closet and install new closet door. remove (e) closet and relocate (e) stair door. install new bathroom window in (e) lightwell. | $40,000 |
| Mar 24, 2015 | Never finaled issued Apr 2015, no final | 165 Lower Tr | replace (e) rear stairs in place, in kind - more than 50%. (n) cable rail guards & horizontal siding. vouluntary structural upgradesDetails
replace (e) rear stairs in place, in kind - more than 50%. (n) cable rail guards & horizontal siding. vouluntary structural upgrades | $75,000 |
| Nov 13, 2014 | Completed final sign-off Jan 2015 | 230 Prentiss St | revision to appl #2014.0305.9936 - reconstruct (e) front stair & guard in-kind.Details
revision to appl #2014.0305.9936 - reconstruct (e) front stair & guard in-kind. | $10,000 |
| Oct 15, 2014 | Completed final sign-off Aug 2015 | 561 04th Av | new rear deck at second level with new stairs to rear yard.Details
new rear deck at second level with new stairs to rear yard. | $25,000 |
| Oct 2, 2014 | Completed final sign-off Mar 2016 | 278 02nd Av | renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a **Details
renovate (e) 2nd level kitchen, change full bath to 1/2 bath. construct new 3rd level at attic including 3 bedrooms, 2 baths, laundry room. new interior stair from (e) 2nd level to new 3rd level. new rear deck & stair. new roof dormers & skylights. ** maher: n/a ** | $170,000 |
| Sep 25, 2014 | Completed final sign-off Aug 2015 | 561 04th Av | remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear.Details
remoedel 1st flr. add media room, one bathroom, laundry room, mudroom and one storage room. 2nd floor - remodel kitchen and bathroom. 3rd floor - renovate (e) bathroom, add a new bathroom and closets. reconstruct (e) front stair in kind, new windows/doors at rear. | $140,000 |
| Mar 26, 2014 | Completed final sign-off Feb 2015 | 1423 16th Av | (n) rear deck at 2nd level & (n) stair. replacement window & (n) french doors at rear.Details
(n) rear deck at 2nd level & (n) stair. replacement window & (n) french doors at rear. | $25,000 |
| Mar 5, 2014 | Completed final sign-off Jan 2015 | 230 Prentiss St | new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight.Details
new habitable space(family rm,bathrm, hall, laudnry) at extg 1st level. new internal stairs between levels. remodel extg kitchen and bath at 2nd level. new french doors and exterior stairs to rear yard. new skylight. | $85,000 |
| Jul 19, 2013 | Completed final sign-off Aug 2013 | 175 Bluxome St | replace extg interior stairDetails
replace extg interior stair | $10,000 |
| Sep 14, 2012 | Completed final sign-off May 2013 | 3965 Cesar Chavez St | new exterior stair from second level to rear yard. new french doors at rear facade. new guess-room, bath, multi-purpose room, andlaundry area at first level.Details
new exterior stair from second level to rear yard. new french doors at rear facade. new guess-room, bath, multi-purpose room, andlaundry area at first level. | $40,000 |
| May 23, 2012 | Completed final sign-off Feb 2014 | 136 Prentiss St | remove extg window and replacing with new french door. install new french door at rear of house. new staircase to backyard. not visible from the street.Details
remove extg window and replacing with new french door. install new french door at rear of house. new staircase to backyard. not visible from the street. | $5,000 |
| Feb 15, 2012 | Completed final sign-off Dec 2012 | 585 Mangels Av | new master bedroom, bathroom and new laundry closet at 1st level. new stairs between 1st and 2nd levels.renovated bathroom and closets at 2nd level.new windows at 1st level rear elevation and new skylight. new concrete slab and front wall footing at 1st level.Details
new master bedroom, bathroom and new laundry closet at 1st level. new stairs between 1st and 2nd levels.renovated bathroom and closets at 2nd level.new windows at 1st level rear elevation and new skylight. new concrete slab and front wall footing at 1st level. | $95,000 |